Annex F Personnel Amp Logging
MS 6373.26 · Practices and doctrines
Annex F Personnel Amp Logging is the administrative schedule governing the joint presence of custodial staff and logging apparatus at a single site. It is not a document in its own right but a standing annexe, first appended in the eleventh recension of the Personnel Annex and subsequently absorbed, disputed, and partially overwritten by Registry Logging procedure. Annex F sets out, among other things, who may stand inside a Logging Chamber while it is operating, in what order they must be counted, and what becomes of the count if the chamber registers an anomaly before the count is finished.
In common usage the phrase has drifted from the schedule to the arrangement it describes: a floor is said to be "under Annex F" when both a logging team and a personnel complement are attached to it, and a clerk is said to be "Annex F'd" when their name appears on a tally they did not consent to join.
Origin and the Counting Dispute
Annex F was produced to resolve a recurring failure at ingress sites in which personnel engaged for custodial work were recorded on logging tallies and logging technicians were recorded on custodial rolls, with the result that neither count reconciled and both offices claimed the discrepancy as evidence of the other's negligence. The Office of Acquisitions Amp Stasis and the Office of Personnel each maintained that the annexe originated with the other, a position neither has withdrawn.
The compromise text, recorded in Personnel Annex, Annex F, Clause 6, is brief: "A body counted is a body logged; a body logged is a body counted." The clause was intended to establish parity. It has instead established that the two offices may each audit the other's tallies indefinitely without either being wrong, and the dispute over which count is primary has been referred to the Bureau of Permissions Amp Transit on nine occasions, each referral returning the matter "for local reconciliation."
The Radicle Interval
Where an annexe-F attachment is declared during Provisional Logging, the logistical interval prescribed by the Radicle Stage of the Stamen Amp Pistil Stages is compressed. Office of Acquisitions Amp Stasis procedure requires the Radicle Stage to be initiated within twenty-four hours of provisional logging; Annex F allows the initiation to be suspended while a tally is in progress, provided the suspension is recorded at both ends.
In practice the suspension is often unrecorded at one end. The most cited example is the Floor 1188 Incident of the winter of the third recension, in which a custodial complement of eleven was counted into a chamber that had not yet been cleared by the logging team. The tally was suspended for six hours and forty-one minutes. At resumption the custodial dead were still eleven, the logging dead were four, and the two counts disagreed by the exact number of the Personnel Annex's standing levy, which had been applied to neither.
Instrumentation
Annex F requires that every member of a joint party carry an Ir Number Amp Date of Logging tag, that the tags be legible at a distance of four paces, and that no two tags in a chamber carry the same date. The tag requirement was added after a batch of tags was issued in the third recension with the dates of the preceding recension still legible beneath the new impression. Eleven personnel were logged twice. The duplicate entries were not struck from the register but bracketed, and the brackets are maintained to this day under the notation Annex F, superseded, retained.
Personnel assigned to Annex F work are also required to surrender their outer coats at the chamber threshold. The practice is older than the annexe and no Concordance accounts for it, but the Vault of Pending Personnel will not accept a coat with a legible tag, and the coats are returned at the close of the logging, or not.
Conflict with Title VII and Concordance 44
The principal scholarly disagreement turns on the order of operations at the close of an ingress sequence. Ingress Amp Isolation requires that the Ir Number Amp Date of Logging be appended to the official entry on conclusion, contingent on the Amp registering an Omega (Ω) reading below the threshold fixed in Concordance 44, Clause 44.12. Title Vii Measurement Amp Demarcation requires the same measurement, but fixes the threshold at a lower reading and counts the personnel present as a multiplier rather than as a constant.
The two cannot both be satisfied where the reading falls between the thresholds. The recorder of Phase 5 Placement Amp Integration noted in a marginal hand, "We measured the room, then we measured the people in it, and the room was no longer the room we had measured." The note was not struck, and the question of whether the personnel count precedes or follows the Omega reading remains open. The Sub Axiomatic Cartography Amp Projection Annex has twice declined to rule, observing that the projection cannot resolve a room containing an undefined number of occupants.
Current Standing
Annex F remains in force, though it has been amended eleven times to a text of forty-one clauses, of which, by the Manual of Ingress's own count, six concern the actual logging of persons. The rest concern coats, tallies, brackets, and the etiquette of standing near a threshold. The Office of Personnel continues to supply custodial labour to archives designated as non-existent under the annexe, and the Ceremonial Cataloguing Amp continues to log them there. Neither office has agreed that the other is correct.
"The tally shall not be closed while a body is unaccounted for; a body unaccounted for shall be presumed counted."
— Personnel Annex, Annex F, Clause 33
The clause has never been invoked in a case where the presumption could be tested, a fact the Bureau of Permissions Amp Transit records annually without comment.
See also
-
MS 1349.34
Custodial Register for Unrealized Spaces
The Custodial Register for Unrealized Spaces is the Tower's principal schedule of spaces that were proposed, surveyed, numbered, o…
-
MS 7300.94
Concordance on Personnel Safety
The Concordance on Personnel Safety is the most recent primary governing document for Personnel Safety, ratified in the 3,988th cy…
-
MS 2509.89
DoctrineĠofĠInvisibleĠStewardship
The Doctrine of Invisible Stewardship is a custodial principle of the Stewardship Protocol governing materials that do not announc…
-
MS 3240.52
The Annex Theta Duty Roster
The Annex Theta Duty Roster is the standing instrument by which the administrative apparatus of Annex Theta assigns, rotates, and …
-
MS 5731.45
Personnel Evaluation
Personnel Evaluation is the standing procedure by which the Office of Personnel assigns each clerk, porter, copyist and annex-boun…
-
MS 2513.50
Authorized Personnel
Authorized Personnel is the standing designation applied to any individual whose presence, passage, or handling of documents withi…
Referenced by
- MS 2979.30 Guild Standard 114-Δ-7b
- MS 2108.88 Parallel Logging
- MS 6958.03 Chamber of Dimensional Logging
- MS 1466.48 Personnel Management
- MS 2580.52 Logging
- MS 1102.15 Annex D Audit Amp Verification
- MS 7190.75 Personnel Rotations
- MS 6433.07 Date of Logging
- MS 5177.81 Hourly Logging
- MS 5731.45 Personnel Evaluation
- MS 4210.25 Event Logging
- MS 7429.41 Assignment of Ir Number Amp Date of Logging
Readers also asked
Registry Logging: how is it conducted?
The Registry Logging process, formally designated as the Procedure for the Registration and Logging of Provisional Submissions (Annex C, Clause 7, v. 1,327), is the standardized sequence by which a new submission is ente…
Registry LoggingVault of Pending Personnel: where is it?
The Vault of Pending Personnel is a classified administrative annex located on Floor 117, designated as the final repository for all records pertaining to Tower personnel whose official status has been rendered indetermi…
Vault of Pending PersonnelManual of Ingress: what does it set out?
The Manual of Ingress (Registry Document R-114.Δ) is the definitive procedural text governing the authorization, documentation, and physical realization of new points of entry between the numbered floors of The Tower. Ma…
Manual of IngressSub Axiomatic Cartography Amp Projection Annex: who are they?
Sub Axiomatic Cartography Amp Projection Annex is the administrative designation for a complex of three interconnected sub-levels, enumerated as Floors 43, 43α, and 43β, which house the primary operations dedicated to th…
Sub Axiomatic Cartography Amp Projection AnnexPassages cited from this record
-
The tally shall not be closed while a body is unaccounted for; a body unaccounted for shall be presumed counted.
Personnel Annex, Annex F, Clause 33
Readers who consulted this also failed to find
- MS 1344.45 Radicle Stage of the Stamen Amp Pistil Stages
- MS 7515.49 Ceremonial Cataloguing Amp (Type-VII-C-Cerim)
- MS 4209.00 Floor 1188 Incident
Because you consulted