The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Vertical Refinery

MS 4429.70 · Guilds, orders and offices

The Vertical Refinery is the Tower's second-largest processing body, occupying the eastern shaft-wall of Fluctuation Floor 44 and extending, by the survey of Guild Survey 44/7, some sixty-two storeys in the vertical. It is adjacent to the Refinery of Clarified Intent and shares with it a common atmospheric recycling system, an arrangement required by the Tenth Concordance and defended in every recension since. Unlike its neighbour, however, the Vertical Refinery does not clarify intent. It processes raw Silentium Resin — the unrefined seep that collects in the lower stairwells — and it is the sole licensed facility in the Tower for doing so.

The licence is not the Refinery's own. It is held by the Office of Vertical Logistics, which grants it by quinquennial indenture and has never granted it to anyone else. Applications from Refinery Σ-18 in the years 12 and 17 of the present audit cycle were returned unopened, on the ground that the Office does not correspond about the licence.

Process and plant

Raw Silentium Resin arrives at the Refinery by way of the Vertical Tram Lines, in sealed carriers stencilled with the aperture mark of their floor of origin; the greater part comes up from Floor 1117 and the Primary Refinery Aperture. On receipt each carrier is weighed twice, once by the Refinery's own scales and once by the scales of the Office of Vertical Coincidence, whose readings are permitted to differ by no more than one part in nine hundred before the carrier is returned. Returns are recorded in the Register of Vertical Endeavors under the heading unpersuaded.

Within the shaft the Resin is passed through nine settling spirals and one hundred and forty-one filtration baffles before being decanted into finished stock. The baffles are replaced on a fixed schedule of eleven years regardless of condition. The schedule is maintained not by the Refinery but by the Scriptorium of Minor Weights, which sends a clerk with a ladder and a ledger and no other equipment. Clerks are instructed not to converse with refinery staff during replacement, as conversation has been shown to disturb the count.

Relationship to the Refinery of Clarified Intent

The two refineries are joined by a walkway of forty-one paces and by the atmospheric recycling system they hold in common. The Tenth Concordance mandated this physical proximity, and the Vertical Refinery has never disputed the mandate. It has disputed the walkway. In the ninth year of the current recension the Refinery petitioned the Office of Vertical Access to have the walkway rehung at a lower pitch, arguing that its present incline caused finished stock to be carried past the door of the Refinery of Clarified Intent, where it was frequently mistaken for an intent shipment and delayed. The petition was refused under the Ordinance of Vertical Access, clause 12, which provides that doors may not be moved to accommodate goods. The Refinery has since routed its carriers by the north stair.

The School of Latent Actuality has made the arrangement a standing example in its published objections, contending that proximity without interchange clarifies nothing and merely concentrates it. The Vertical Refinery has not responded to the School in writing. Asked at the annual audit whether the proximity had improved throughput, the Refinery's then-foreman, Halvard Nesk, replied that throughput was not the question and that the question had been settled in the tenth year of the present recension. The reply is preserved in the audit record and is the Refinery's only recorded statement of doctrine.

Dispute over the annealing temperature

The Refinery anneals finished Resin at 41 degrees above shaft ambient. This figure is given in the schedule annexed to the Tenth Concordance and has not been amended. The Office of Vertical Acoustics, however, holds that the correct figure is 44 degrees, on the authority of the Suspension of Vertical Precedent, which suspended all annex figures bearing on audible phenomena pending review — review that has now run for thirty-one years without a report.

"Where an annex figure and a suspension of precedent disagree, the later instrument governs; a suspension that has not reported is nonetheless a suspension."

— Suspension of Vertical Precedent, clause 3

The Refinery continues to anneal at 41. It notes that stock annealed at 44 has twice been found to ring, and that ringing stock is unsaleable. The Office of Vertical Acoustics has not disputed the finding, only the figure.

Audit and certification

Shipments leaving the Vertical Refinery are certified by auditors of Silica Cluster Beta, the same body that certifies consignments from Refinery Σ-18. The arrangement is a concession to the Office of Vertical Logistics, which prefers a single certifying cluster across all downward-bound stock. The Vertical Refinery has twice sought certification by a cluster of its own, and twice been told that clusters are not made to order. Auditors attend at the Refinery's loading landing on the twelfth day of each period, and are not admitted on the thirteenth, which is given over to the cleaning of the settling spirals.

Incidents

In the winter of the year recorded as 44/19, a baffle-count discrepancy of three units was traced to a clerk of the Scriptorium who had brought a second ladder. The clerk's account — that the first ladder was too short — was accepted, and replacement of the baffles was suspended for a season while ladders were measured. It has since been established that no ladder in the Refinery is of the regulation length, and that this has not affected the count.

A more serious matter is the matter of the common atmospheric system, which in that same winter drew refinery vapour into the Refinery of Clarified Intent and caused forty-one attestations of intent to be recorded as though made at 38 degrees rather than 41. The attestations were not voided. Under the practice of the Register of Vertical Endeavors they were entered as warmly made, and remain citable.

Access

The Vertical Refinery is not open to visitors below the fourth landing. Visiting parties are received at the loading landing on the twelfth day and are asked to leave their coats with the porter, as the shaft is warmer than the landing and coats have been lost.

See also

Referenced by

Readers also asked

Vertical Cartographers' Guild: who are they?

The Vertical Cartographers' Guild is a sanctioned body responsible for the classification, documentation, and procedural administration of stairwells, shafts, and other primary vertical conduits within the Tower. Its aut…

Vertical Cartographers' Guild
Refinery of Clarified Intent: who are they?

The Refinery of Clarified Intent is a licensed processing annex operating under the jurisdiction of the Scriptorium of Minor Weights, responsible for the distillation and quantification of ambient, residual, and procedur…

Refinery of Clarified Intent
Scriptorium of Minor Weights: who are they?

The Scriptorium of Minor Weights is an administrative annex of the Central Scriptorium, formally established by Ordinance 4, Annex C in 1912 to document and categorize the qualia weights of non-persistent phenomena catal…

Scriptorium of Minor Weights
Vertical Tram Lines: what is it for?

Vertical Tram Lines are the primary arteries established for the vertical transit of authorized materials, personnel, and catalogued subjects between the administrative and archival levels of the Tower. Their operation i…

Vertical Tram Lines

Passages cited from this record

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.