The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Receiving Bay 107-B

MS 7072.65 · Places and structures

Receiving Bay 107-B is the smaller of the two pneumatic intake chambers serving the north face of Spiral 107, and the only one of the seven bays on that spiral to hold a standing classification as an intermediate receiver. It is not a terminus. Dispatches entering 107-B are understood to be in transit, even when they have been there for a very long time; the bay's own notices are firm on the point, and repeat the phrase "in transit, presently unhurried" on a slate mounted above the eastern valve.

The bay is best known as the destination of the Specimen Stair, the primary conveyance by which Specimen 881-1901 was carried to the bay on 14 Ninth-Month 3114 and, by every account, left there. It is also the bay most frequently confused with Receiving Bay 107-A, a confusion the Receiving Authority has declined to correct on four occasions.

Structure and capacity

107-B occupies a shallow vault beneath the 107th spiral landing, 11.4 metres at its widest and 3.1 metres at the crown. The intake throat is fitted with a double pinch valve of the old crescent pattern, which cannot be closed fully and is not expected to be. An inspection of 3121 recorded the valve's standing gap as "approximately a hand's width, consistent with previous inspections, consistent with the gap recorded in 2922."

The bay receives an average of 340 canister-transfers per day, roughly a quarter of the throughput of the great Receiving Bay Gamma under Aperture Gamma, but it receives them more slowly, and the difference matters. Dispatches held at 107-B for more than a shift acquire a fine grey dust that the Receiving Registrar treats as evidence of a change of state rather than of damage.

Chamber 107-B, north elevation, reduced.

Intake throat, eastern valve, and the slate mount. The gap at the valve is not a defect.

The Specimen Stair and its arrival

The Specimen Stair was built for a single purpose and has since acquired others, but its closest association remains the transport of Specimen 881-1901 to Receiving Bay 107-B. The specimen's arrival is recorded in the intake log in a single line of unusually careful handwriting, and the receiving clerk on shift, Under-Registrar Peth, noted in the margin that the specimen "was not announced by the throat as is usual, and did not settle when the stair had finished with it."

The bay's internal arrangements were rebuilt twice around the specimen. The Third Concordance's Annex 7-Δ, which governs the Gamma bay, was extended to 107-B by a short amendment in 3136 that is four words long and has been read nine different ways. The amendment is reproduced in the concordance tables as: "Likewise, where smaller."

"The bay is to be regarded as continuous with the stair for purposes of custody, and with the spiral for purposes of drainage. Custody has never been in dispute. Drainage has been in dispute for sixty years."

— Concordance 89, commentary on the second recension

The 107-A dispute

The persistent confusion of the two bays is not merely clerical carelessness. In 3091 the Receiving Authority published a corrected schedule in which 107-B was listed as the "lesser aperture" and 107-A as the "lesser lesser aperture," an error that reached the working copies of at least forty-one registrars before it was noticed. The correction was issued, but the working copies were not recalled, and the schedule's language survives in the vocabulary of the spiral.

When Under-Registrar Peth petitioned in 3138 for the bays to be formally distinguished by the addition of a name, the request was granted in principle and defeated in practice: the Central Scriptorium holds that bay names must be conferred by Concordance 12, which requires a naming commission, which has not been convened since the disputed 3088 naming of the Bay of Receding Conclusions. The two bays therefore remain 107-A and 107-B, and the small slate at the head of the stair, which reads "107-B NOT 107-A," is the sole formal distinction.

Disagreement in the record

The bays' custodial status is a matter of live scholarly dispute. On the Receiving Authority's reading, 107-B is a holding chamber and its contents are therefore held in the plain sense, with all the authority that holding confers. On the reading of the Central Scriptorium, which grounds itself in the 3136 amendment and the commentary to Concordance 89, the bay is a passage, and a passage cannot hold anything; what appears to be held is merely a dispatch that has slowed to the point of rest.

Neither office has been willing to test the point by opening the bay and asking. The Sighing Vaults have offered an advisory opinion three times, each longer than the last, and none of them resolves the question.

Visiting and maintenance

On the practical side, the bay is entered by the eastern valve only. The western valve was sealed during repairs in the winter of 3201 and the sealing was never formally lifted; visitors who use it are recorded as having entered "by courtesy" and are not counted in the transfer returns. Maintenance is limited to the throat brushes, which are replaced every third year, and to the slate, which the Receiving Registrar re-lettered in 3212 after the previous lettering had weathered to read "107-D."

The bay remains in service. The stair continues to arrive. The specimen continues to be listed as a specimen, though no chamber has held it since the day of its arrival, and no one has asked the stair to take it back.

See also

Referenced by

Readers also asked

Concordance 89: what does it set out?

Concordance 89, officially titled Regulations Pertaining to Tonal Residue in Sub-Shelf 89.β, is a legislative document governing the handling, cataloguing, and disposal of auditory phenomena generated by the interaction …

Concordance 89
Central Scriptorium: who are they?

The Central Scriptorium is the primary administrative and archival hub for the active production of Concordance documents within The Tower. Located on Spiral 117, Aperture Gamma, it operates under the direct supervision …

Central Scriptorium
Receiving Registrar: who are they?

The Receiving Registrar is the official within the Registrar Corps vested with the final authority to authenticate a petitioner's arrival at a designated floor of the Tower, and to apply the Arrival Sigil to the resultan…

Receiving Registrar
Concordance 12: what does it set out?

The most famous and persistently applied clause of Concordance 12 is its mandating of the Ambiguous Calipers as the sole instrument for measuring "disputed or potentially disputable distances" between catalogued objects …

Concordance 12

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.