Pneumatic Web
MS 5617.29 · Objects and instruments
Definition and extent
The Pneumatic Web is the lattice of brass piping integrated into the Tower's structural columns between floors, by which gas is distributed to the Aerostatic Page-Turning System and, through tap-lines, to smaller aerostatic mechanisms throughout the stack. It is not to be confused with the Pneumatic Conduit Array, which is the pneumatic system entire, nor with the Central Pneumatic Dispatch, which dispatches what the Web merely carries. The Web is the distribution layer: fixed, structural, and — as the Guild of Pneumatic Reconcilers notes in its standing preface — "the only part of the apparatus that predates the walls it runs through" (''Reconcilers' Standing Preface'', rev. 44).
Its extent is unsettled. Floor plans assembled by the Office of Vertical Survey at the close of the Ninth Recension show brass run continuously from Floor 18 to Floor 302 and intermittently above; beyond that the Web is testified to chiefly by sound. Survey rule V-12 governs the practice in this respect:
"A run heard but not traced shall be entered on the plan as presumed, and coloured in the hatch of the presumed."
— Vertical Survey Rules, Rule V-12
The junction count
The Web is a lattice of junctions, each numbered where reached and registered where not. The spine junctions — those the clerks call primary — are the ones from which a page-turning feed drops directly; the rest are secondary, tertiary, and, below the fourth order, unclassified. A continuing dispute concerns the total. The Register of Brasswork gives the primary count as 1,144; the Pneumatic Conduit Array's own schedule of 14 Sable, 612, agrees; a minority report attached to the survey returns gives 1,147 and has never been withdrawn. The three disputed junctions are designated J-45a, J-45b and J-45c, and are all located in the same wall of the same landing.
The Concordance Web classifies the Web as a Progressive Lattice, which permits amendment by addition. Concordance 89 does not govern the Web directly and says so twice.
Operation and control
Charge for the Web is drawn from the Central Pneumatic Stacks, whose operational cycles are themselves synchronised to the Pneumatic Atria whenever those are live. The Web transmits the waveform of the Pneumatic Echo forward and, in the reverse direction, so faintly that the Guild has ruled the backwave "not a signal but a symptom" (''Reconcilers' Standing Preface'', rev. 44, Annex beta). Where the Web crosses a floor boundary it is conceded to the floor's own maintainers by an easement, generally of eleven inches.
Tuning of the Web is performed with the Pneumatic Clarion Network and is done on the third shift, because the Chord That Reconciles is audible in every reading-room above. Clerks who must work through a tuning are issued wax, undivided, and are not compensated for it.
The Kettlewell incident
In the winter of the year the survey calls 14 Sable, 609, the Web on Floor 47 was found to be carrying a smell of scorched wool, which no schedule of the system had ever provided for. The Grade-IV Pneumatic Clerk then on duty, one Kettlewell, traced the odour to J-112 on the eleventh landing and, having no authorised instrument for odour, recorded the matter on Form P-9 under the heading "Pressure, suspected."
Her superior, Overseer Marn, held the form irregular; the Hermetic Pneumatic Exchange held it regular, on the ground that the Web's odour had been noticed before in 14 Sable, 588 and entered then under the same heading. The matter reached the Concordance Web and was resolved by Concordance 131, which added the heading "Pressure, suspected (including that which does not smell of brass)" to Form P-9 and left it there. The smell did not recur. Kettlewell was reprimanded for the delay of eleven days and commended for the tracing, and requested that only one of these be entered in her record. Both were entered.
Misattribution and dispute
A persistent scholarly error, first committed by the Annotated Index of Interior Works in its second edition and copied by four recensions since, identifies the Pneumatic Web with the Great Pneumatic Tube Network, on the reasoning that both are described as "pervading." They are not the same. The Web carries gas to move paper; the Great Pneumatic Tube Network carries capsules, and is a Secondary Conduit of the Central Pneumatic Tube System, maintained day-to-day by the Guild of Pneumatic Reconcilers. The distinction is set out in the Concordance Web, delta recension.
A separate and older dispute concerns whether the Web may be repaired without the floor's consent when the leak is in the floor. Concordance 204 says it may. Concordance 209, which is shorter and older and was re-affirmed more recently, says it may not, and adds: "The brass is the Tower's; the wall is the floor's; a man who cannot tell them apart should be given neither" (Concordance 209, Annex 2). The two have not been reconciled. Meanwhile the Department of Pneumatic Conveyance has ruled that a repaired junction rejoins the Web unaltered, whereas the Register of Brasswork re-numbers it and forbids the old number's reuse — a difference of practice that has cost the archive some four hundred pages of duplicated plans.
Inventory of a primary junction
A junction of the first order, opened in the presence of a surveyor, was found in 14 Sable, 612 to contain the following:
- a brass collar, stamped with its register number;
- a lead gasket, renewed;
- a wad of flax, provisioned but not used;
- one cork, of a size not fitted to this junction;
- a note, in a hand not otherwise known to the Register, reading "leave be."
The note was entered in the record and the cork was not. No junction is opened on a Sunday except in the case of a leak audible from a stair.
See also
-
MS 0111.07
The Central Pneumatic Stacks
The Central Pneumatic Stacks constitute the primary physical repository and integrated transport nexus for the Pneumatic Conduit A…
-
MS 4948.48
Master Ledger of Permitted Mechanisms
The Master Ledger of Permitted Mechanisms (MLPM) is the regulatory compendium governing all kinetic, pneumatic, hydraulic, and con…
-
MS 0643.58
Philosophical Columns
Philosophical columns are a category of structural, non-load-bearing columns catalogued and maintained under Ordinance 12.45.7.1, …
-
MS 2978.18
Structural Columns
Structural Columns are the load-bearing members of The Tower: the vertical elements that transmit the weight of each floor to the …
-
MS 0522.69
Architectural Columns
Architectural Columns are a foundational class of structural and symbolic elements within The Tower, responsible for the vertical …
-
MS 4788.32
Tower clock
The Tower clock refers not to a singular device but to the integrated system of primary, secondary, and tertiary chronometric stan…
Referenced by
- MS 9137.31 Procedural Columns
- MS 2978.18 Structural Columns
- MS 2892.81 Aerostatic System
- MS 3928.80 Guild of Pneumatic Reconcilers
Readers also asked
Floor 47: where is it?
The operational protocols for Floor 47 are outlined in the Seventh Concordance, Annex D: Ventilation & Circulation. According to standard procedure, air is drawn from a rotating selection of lower-numbered floors (primar…
Floor 47Department of Pneumatic Conveyance: who are they?
The Department of Pneumatic Conveyance is a constituent office of the ante-Vestibule administration, charged since at least the ninth recension with the certification, sealing, and periodic re-certification of Primary Ve…
Department of Pneumatic ConveyanceCentral Pneumatic Tube System: what is it for?
The Central Pneumatic Tube System is the designation given to the trunk routes, pressure regulators, and principal transfer stations of the Great Pneumatic Tube Network, as distinguished from its named subordinate system…
Central Pneumatic Tube SystemConcordance 209: what does it set out?
Concordance 209, formally the Edict of Unidirectional Ambiguity, is a foundational yet paradoxical governance document pertaining to the classification of theoretical stairwells and the permissibility of revisionist cart…
Concordance 209Passages cited from this record
-
A run heard but not traced shall be entered on the plan as presumed, and coloured in the hatch of the presumed.
Vertical Survey Rules, Rule V-12
Readers who consulted this also failed to find
- MS 8453.97 Annotated Index of Interior Works
- MS 7032.13 Concordance Web
- MS 8008.03 Overseer Marn
- MS 2263.06 Concordance 131
Because you consulted