Proposed Containment Tier
MS 2229.02 · Practices and doctrines
The Proposed Containment Tier is a provisional stratum designation used in the drafting of containment protocols, denoting the floor or fraction of a floor to which a subject would be consigned upon sealing but to which it has not yet been consigned. The designation is administrative rather than architectural: a Proposed Containment Tier carries a number, a name, and a full shelving allotment before any subject has been moved onto it, and is held in reserve by the Sealing Registry until such time as the protocol invoking it is ratified. As at the seventh recension of the register, one hundred and nine Proposed Containment Tiers stand open, of which four have been open since before the current numbering of the floors was adopted.
Origin and terminology
The designation was introduced to resolve an ambiguity that had caused persistent difficulty in the Proposed Containment Protocols. Earlier drafts named a subject's destination floor in the same clause that stipulated its confinement, with the result that a protocol could not be sealed without the Registry first confirming the floor's availability, and the floor could not be released without an instrument naming its occupant. Protocol Containment Protocol Theta is generally held to have been the first to separate the two, naming an unassigned tier in its Sixth Clause and confirming the floor only at sealing; the practice spread by precedent and was regularised by Tier IV: Contextual Non-Interference, Section 12, which provides that "a tier proposed is not a tier occupied, and shall not be cited as evidence of occupancy in any subsequent proceeding."
Writers of protocols are directed to the Proposed Containment Protocol Template for the prescribed form of the designation, which is a Roman numeral followed by the word proposed and a floor number in brackets, as in Proposed Tier XIV (3,208). The wording is not discretionary. Clerk-Marshal Ondeve, who revised the template at Annex Delta of the Twelfth Concordance, records in his covering note that eleven drafts were returned in a single quarter for writing the floor number first, and that the habit "persists among the younger draftsmen, who appear to regard the order of the words as a matter of taste."
Procedure
A Proposed Containment Tier is opened by petition to the Sealing Registry, countersigned by the Office of Protocol Drafting and endorsed, in the case of subjects classified at Tier III or above, by the Office of Manifest Absences. The Registry then enters the tier in the reserve ledger, assigns it a provisional spiral interval, and returns the petition with the designation affixed. The tier remains open for the duration of the drafting, which may be considerable. The Tier III Containment Amp Reformation cannot proceed against any subject whose protocol cites a tier still awaiting designation, and the reformations of two subjects remain suspended on this ground, the elder of the two since the winter of the long audit.
Where a protocol is abandoned, the tier returns to the reserve and is reissued. Where it is ratified, the tier is closed and its number is struck from the ledger in red. No tier is reused under the same designation, though the Registry has twice allowed the practice of appending a letter, and once a letter to a letter, until the Senior Indexers' Guild ruled against further nesting in its Advisory of 14 March, which described the resulting designations as "unreadable at the shelf and unspeakable at the desk." A full reserve interval on the open ledgers must be measured from the stairhead, not the central well; the two are not the same reference point and the discrepancy has cost the Registry three disputed allotments.
Collision with occupied floors
The chief difficulty of the reserve is that the Tower's numbering is not sequential in any recoverable way, and a Proposed Containment Tier may be found, on final survey, to coincide with a floor already named and in use. The Observatorium of Errant Postulate was proposed twice as a containment tier before its own designation was confirmed, an episode treated at length in the marginalia of Floor 308. A worse case occurred in the proposal that would have become Tier XII (6,117): the survey party found the floor not merely occupied but catalogued, and the subject for which the tier had been reserved was accordingly recorded as contained without ever having been moved, a result the Registry defends as an economy and the Guild has declined to endorse.
Disagreement persists as to whether such coincidences are to be read as evidence that the Tower anticipates its own instruments. The Proposed Nineteenth Concordance holds, at draft clause 40, that a proposed tier which proves already occupied was never proposed — that the petition was void from its return date, not merely superseded. The Office of Protocol Drafting maintains the contrary on the authority of an older instrument, citing the Third Concordance, Annex 9, to the effect that a void instrument confers no benefit on the subject. The two positions have never been reconciled, and the Registry, which must act, has adopted the practice of doing nothing until the matter is raised again.
Notable tiers
- Proposed Tier IX (8,434) — open since before the current numbering; no petition survives, and the tier is listed as open by default. See Floor 8,434.
- Proposed Tier XIV (3,208) — the standing example in the drafting schools; never occupied.
- Proposed Tier XXII (314) — withdrawn after the survey found the atrium in active use by another office. See Floor 314.
- Proposed Tier III (unnumbered) — a designation without a floor, entered in error and never struck; carried in the ledger under a marginal note reading "retain until asked."
Retention and audit
Proposed Containment Tiers are audited at the turn of each spiral against the reserve ledger and the register of occupied floors. The Lexical Purity Review attends the audit to confirm that each designation conforms to the Proposed Containment Protocol Template as presently amended, and it is at this stage that most faults are found — an inverted numeral, a floor number written in the wrong hand, a tier proposed for a subject already provided with a tier. The Office of Acquisitions Amp Stasis has twice objected that its own reformations have been delayed by faults of this kind, and once, in a memorandum that has never been withdrawn, that the reserve exists chiefly to give the Registry something to audit.
"A tier is held open, not held ready. The distinction is one of posture, and draftsmen who confuse the two are asked to leave the reserve interval by the stairhead."
— Sealing Registry, Standing Notice 6
No Proposed Containment Tier has ever been closed by the top or the bottom of the reserve. The register simply continues, as the Tower does, and the ledger is rebound each century without alteration to its first page, which records the opening of Tier I and does not record its closure.
See also
-
MS 7020.01
The Aperture of Provisional Protocols Place
The Aperture of Provisional Protocols is the formal designation for Floor 404, an administrative level of the Tower dedicated to t…
-
MS 0442.68
Exorcism Drafting
Exorcism Drafting is the formalized procedure for the preparation, authorization, and execution of protocols pertaining to the rem…
-
MS 5142.17
The Aperture of Provisional Protocols
The Aperture of Provisional Protocols is the principal administrative and logistical nexus for the drafting, ratification, and tem…
-
MS 8877.84
Provisional Tagging
Provisional Tagging is the subset of Ontological Tagging practices used to apply metadata denoting the conditional, contested, or …
-
MS 1562.04
Floor 404
Floor 404, formally designated The Aperture of Provisional Protocols, is a predominantly administrative level devoted to the draft…
-
MS 9821.61
Proposed Locale
The Proposed Locale is the provisional designation applied to any site within the Tower whose existence has been asserted in writi…
Referenced by
- MS 9788.46 Form 1747-Ω (Statement of Perceived Effect)
- MS 9046.51 Office of Provisional Containment
Readers also asked
Tier Iii Containment Amp Reformation: how is it conducted?
Tier III Containment Amp Reformation (TCAR) is a codified, multi-stage protocol administered by the Office of Acquisitions Amp Stasis for the containment, description, and ultimate re-filing of phenomena classified as Ti…
Tier Iii Containment Amp ReformationProposed Nineteenth Concordance: what does it set out?
“…the proposed Nineteenth Concordance, fundamentally an instrument of provisional classification, was both a radical oversimplification of the gradient schema and an insufficiently rigorous framework for the containment …
Proposed Nineteenth ConcordanceProposed Containment Protocol Template: what does it set out?
The Proposed Containment Protocol Template is the standard form, set out in Annex Delta of the Twelfth Concordance, to which every newly drafted containment protocol in the Tower must conform before it may be sealed and …
Proposed Containment Protocol TemplateProposed Containment Protocols: how is it conducted?
Proposed Containment Protocols are preliminary or draft measures submitted for formal review and ratification before they can be entered into the Tower’s official compendium of Containment doctrine. Governed by Provision…
Proposed Containment ProtocolsPassages cited from this record
-
A tier is held open, not held ready. The distinction is one of posture, and draftsmen who confuse the two are asked to leave the reserve interval by the stairhead.
Sealing Registry, Standing Notice 6
Readers who consulted this also failed to find
- MS 8951.40 Office of Manifest Absences
- MS 7014.43 Sealing Registry
- MS 8160.81 Office of Protocol Drafting
Because you consulted