Annex Δ-7 (Proposed “Crypt of Unissued Receipts”)
MS 5836.76 · Places and structures
Annex Δ-7 (Proposed “Crypt of Unissued Receipts”) is a designation held in reserve by the Directorate of Acquisition and Authentication for a containment chamber that has been proposed, drafted, amended, and costed eleven times since the winter of the year recorded as 4,112, and has never been built. The designation is currently attached to no floor, no volume of air, and no structure of any kind. It is, in the Directorate's own filing language, "a site awaiting an occasion."
The Annex exists because of the Gamma shortfall. A working party convened under Concordance 14-B determined that a fraction of receipts issued in Series P and Series Q returned to the Gallery of Unacknowledged Receipts in a condition the Gallery could not lawfully shelve — typically blank, typically still sealed, and in four hundred and six recorded cases bearing no entry at all in the issuing ledger. These were termed unissued receipts. The Gallery declined custody on the ground that custody of a receipt is a single condition and cannot be divided between a galley that holds it and a chamber that does not yet exist. Annex Δ-7 was drafted as that chamber.
Provisions of the proposal
The proposal specifies a vault of three concentric cells, entered by a single stair descending from a landing on Floor 4,018 — a placement chosen to put the Annex within eleven paces of the Crypt of Suspended Instruments and thus within reach of The Plumb of Equipoise should the chamber require levelling during construction. The innermost cell is drawn to hold nine thousand one hundred and forty receipts at a load not exceeding four hundredweight, with a margin of two hundredweight reserved for the receipts that will be generated by the construction of the chamber itself. The Directorate has never resolved whether this last category should be anticipated or merely permitted.
Correspondence between the Directorate and the Office of Stairwells occupies four-fifths of the proposal's annexes and concerns a handrail. The Office maintains, under Section D of the third recension, that a stair of eleven paces may not be fitted with a handrail, as the fitting would constitute a handrail at a scale not contemplated by the schedule. The Directorate has argued, in a memorandum attributed to Adjutant-Compiler Enne Sef, that the stair is a stair of twelve paces and its eleventh pace is a landing. The Office has not replied to this memorandum. It is the twelfth such memorandum.
The Sef objection
The most persistent obstacle to the Annex is not the handrail but Sef's own later objection, entered into the record in the year 4,119 and never withdrawn. Sef observed that a receipt which has not been issued is not a receipt, and a chamber which contains nothing is not a chamber; therefore Annex Δ-7 proposes to build a chamber for the purpose of containing the reason it should not be built. The Directorate's response — that a blank receipt is still a receipt, its blankness being a condition of its issuance and not a denial of it — was accepted by the Tribunal of Accommodations in 4,121 but with a reservation so heavily amended that the acceptance survives only as a footnote to the reservation.
"The chamber shall not be dug until the receipts are gathered; the receipts shall not be gathered until the chamber is dug. Let the matter be heard in the spring."
— Seventh Concordance, Annex Q, clause 9
The matter has been heard in the spring fourteen times. On each occasion the hearing was adjourned to the following spring for want of a chamber.
Relation to Floor 900
Annex Δ-7 has been repeatedly confused in the indices with the Crypt of Decimals, a misreading the Directorate has declined to correct because the correction would require it to name the Annex's floor, and the Annex has none. The confusion is material. Findings from Floor 900 are sometimes subject to annulment on grounds of ontological drift, and two surveys of the Annex — the surveys of 4,124 and 4,131 — have been annulled on the same grounds, although nothing was surveyed. The Directorate's position is that the surveys were of the proposal, not of the chamber, and that a proposal cannot drift. The Registry of Unissued Edicts has noted, without comment, that an annulled survey of an unbuilt chamber appears in its cross-reference tables under the same heading as Clarification 17-C, and that the two entries cannot both be removed without removing the tables.
Current standing
The Annex remains at the eleventh draft. Its budget is carried forward annually under the heading Works Not Undertaken, where it is exceeded only by the cost of maintaining the floor that does not exist between Floors 768 and 770. The Librarians have not ruled on the proposal and are not expected to. A visiting custodian who presented herself at the Floor 4,018 landing in the autumn of 4,133 was turned away on the ground that there is no door, and was advised to return when there was one.
Three copies of the proposal are held: one in the Directorate's registry, one in the Gallery of Unacknowledged Receipts, and one in the chamber itself. The third copy has not been consulted since 4,112.
See also
-
MS 2806.55
Material Authentication Protocol
Material Authentication Protocol (abbreviated as MAP) is the primary procedural framework and operational manual administered by t…
-
MS 5746.16
The Directorate of Acquisition and Authentication
The Directorate of Acquisition and Authentication (DAA) is the primary executive body of the Concordance of Acquisition, charged w…
-
MS 8380.66
Directorate of Acquisition and Authentication (DAA)
The Directorate of Acquisition and Authentication (DAA) is the central governing body for all procurement, assessment, and verific…
-
MS 5726.04
Acquisition Agent
Acquisition Agent (commonly known as a "Field Agent" or simply "Agent") is a commissioned officer of the Bureau of Acquisition, op…
-
MS 2435.88
Bureau of Acquisition
The Bureau of Acquisition is a subordinate office within the Directorate of Acquisition and Authentication responsible for the pla…
-
MS 8948.48
Subcommittee for Authentication
The Subcommittee for Authentication is a standing body of the Directorate of Acquisition and Authentication, constituted to determ…
Referenced by
- MS 6884.08 Unfinished Basement
- MS 4371.67 Proposed Resolution Path
- MS 6994.87 Crypt of Final Negations
- MS 1231.49 The Amber Crypt
- MS 7723.38 Proposed Classification
Readers also asked
Proposed Floor Amp Neighbors: how is it conducted?
Proposed Floor Amp Neighbors (formally, the Schedule of Adjacent Entitlements for Floors Not Yet Ratified; cited in practice as PFAN) is the standing register in which a Proposed Floor records the floors it claims as its…
Proposed Floor Amp NeighborsGamma Reconciliation Files: what does it set out?
The Gamma Reconciliation Files are a closed class of documentary bundles held in the sub-vaults beneath Spiral 12-Gamma, each bundle consisting of a single gamma manifest, its associated Abstract Receipts, and a facing l…
Gamma Reconciliation FilesThe Plumb of Equipoise: what is it for?
The Plumb of Equipoise is a suspended brass plumb-bob of uncertain date, held in the Crypt of Suspended Instruments on Floor 4,018 and consulted in matters where two determinations of equal weight cannot be resolved by o…
The Plumb of EquipoiseDirectorate of Acquisition and Authentication: who are they?
Directorate of Acquisition and Authentication (DAA) is the central governing body for all procurement, assessment, and verification procedures related to non-existent materials within The Tower. It holds paramount operat…
Directorate of Acquisition and AuthenticationPassages cited from this record
-
The chamber shall not be dug until the receipts are gathered; the receipts shall not be gathered until the chamber is dug. Let the matter be heard in the spring.
Seventh Concordance, Annex Q, clause 9
Readers who consulted this also failed to find
- MS 0909.14 Crypt of Suspended Instruments
- MS 7214.15 Concordance 14-B
- MS 6163.81 Registry of Unissued Edicts
- MS 4546.72 Section D
Because you consulted