Ascent
MS 4125.74 · Practices and doctrines
Ascent is the upward translocation of persons, goods, and instruments between floors of the Tower, and — in Librarian usage — the whole body of doctrine, ordinance, and engineering that governs it. The word is not used of ordinary walking; a reader who climbs eleven flights by the internal stair is ascending, but is not performing Ascent. Ascent properly begins where a marked conduit begins, and ends, by the Ordinances of Ascent, at the first threshold crossed under it. The distinction is enforced by the fact that no one has ever successfully argued it in writing.
Definition and the threshold question
The first clause of the Ordinances of Ascent defines a conduit as "any sustained vertical passage maintained under seal and entered at a marked aperture, with or without moving parts." The phrasing was drafted to accommodate the Ephemeral Ascent and has since accommodated considerably more. The Gradient of Ascent/Descent qualifies under the same clause, though its engineering specifications live in the Third Concordance rather than the Ordinances, a split jurisdiction that has produced two centuries of complaint and no ruling.
The threshold question — at what point a climb becomes Ascent — was settled pragmatically rather than doctrinally. The Surveyor-General for Lateral Ascent maintains that the test is whether the climber can produce the aperture slip; the Clerk of the Threshold Register, in a memorandum of 14 Vintner, held that the test is whether the climber has one. Both tests are still applied, depending on the office.
Conduits and their custodians
Ascent is not administered centrally. Custody is divided among bodies whose charters overlap by design and conflict by accident. The Keepers of the Ascent claim maintenance purview over all major ascent-descent conduits, a claim they press hardest in respect of the Spiral of Deferred Ascent and the Gradient of Ascent/Descent, where they hold primacy for maintenance and wayfinding. Their claim over the Ephemeral Ascent is contested by the Society for Informed Ascent, which asserts jurisdiction on the ground that the conduit is non-physical and therefore not a maintained object at all.
An illustration of how these claims are actually worked: the Keepers hold maintenance purview over Weldon’s Ascent owing to its link to the Provost’s Ascent, but have ceded inspection duties — a cession recorded in the Keepers' own charter annex and never revoked by the Society, which does not recognise the cession and continues to inspect. Inspectors from both bodies have been observed working the same flights in silence on the same afternoon.
Doctrine of terminal ascent
The theoretical literature is dominated by the Doctrine of Terminal Ascent, which holds that every conduit has a highest reachable floor and that ascent beyond it is not forbidden but unindexed. The doctrine has been influential chiefly because it cannot be falsified: expeditions that return report inventories, and expeditions that do not return are absorbed into the doctrine as still in progress. The Second Northern Ascent terminated at Floor 177 and furnished the doctrine with its most-cited case, though the survey party's own report declines to say whether the termination was procedural or architectural.
"The party ascended to the floor and remained there four days. Nothing further was attempted, and no reason for not attempting it was recorded."
— Survey party report, Second Northern Ascent, Appendix C
The Doctrine of Terminal Ascent is also invoked against the Gap in the Stairwell of Presumed Ascent, where the gap is treated not as damage but as a terminal condition occurring early. Objectors point out that this reasoning would make any gap terminal, and that the Tower is full of gaps. The objection has not been answered.
The doctrine of coincidental names
A persistent confusion holds that the Ascent/Descent Dichotomy applies only to movement and not to naming, so that a conduit may be called an Ascent while functioning exclusively downward. The Scroll of Perfect Ascent is the standard citation here, having been recopied four times before anyone noticed that the original recension contains no reference to direction at all. The Echoes of Unfinished Ascent are likewise heard on landings that no conduit serves, which the Ordinances of Ascent does not address.
Disputed points
Two disagreements are old enough to be treated as furniture. The first concerns whether the Spiral of Unverified Ascent is Ascent at all. The Third Concordance, Annex 4, holds that verification is not a property of the passage but of the record, and that an unverified ascent is therefore simply an ascent with a deficient record — "and the record may be amended later, or never."
"A conduit does not become a stair because the clerk has lost the page."
— Third Concordance, Annex 4
Against this, the Gap in the Stairwell of Presumed Ascent is cited by the opposing school, which reads the word "Presumed" in the floor designation as an admission that the Concords themselves accept undocumented ascent as a category. Neither side has produced the manuscript the argument turns on; it was last signed out to a clerk of the threshold register and is now the subject of a separate inquiry.
The second dispute concerns counting. Whether a climb that is interrupted and resumed constitutes one Ascent or two determines the fees, the register entries, and — at certain floors — whether the climber is entitled to the use of the landing. The Descent and Ascent Protocols direct that the count be continuous, but add in the same paragraph that continuity is a matter for the attestor's discretion. The Clerk of the Threshold Register, whose grievance on this point is recorded in a marginal note of considerable length, observes that the attestor's discretion has never once been exercised in favour of the climber.
Practically, the office advises climbers to carry their aperture slips on their person and not in a bag. The advice is not doctrinal.
See also
-
MS 6042.93
Librarian Anselm
Librarian Anselm is a designation of uncertain reference used in the Tower's records for at least eleven distinct offices, instrum…
-
MS 4653.07
Translocation
Translocation is the sanctioned movement of persons, materials, or information between two points of the Tower along a route appro…
-
MS 9937.15
Builder’s Annex to Ordinance 707
The Builder's Annex to Ordinance 707 is the engineering schedule appended to Ordinance 707 governing the permissible sound carry o…
-
MS 6617.23
Ordinance 4 Annex C Document
The Ordinance 4, Annex C Document is the operative annex to Ordinance 4 governing the composition of long-form instruments within …
-
MS 7336.63
Seventh Concordance, Temporary Maintenance Clause 882
The Seventh Concordance, Temporary Maintenance Clause 882 (colloquially, the "Riser Resolution") is a foundational engineering ord…
-
MS 3667.33
Ordinance 8902 Alpha1
Ordinance 8902 Alpha1 is a single-clause instrument of the Librarian order, ratified on 14 March of the year 1142 by the Registry …
Referenced by
- MS 0271.31 Descent and Exploration
Readers also asked
Gradient of Ascent/Descent: what is it for?
The Gradient of Ascent/Descent is the primary continuous helical ramp traversing Central Atrium 5, as well as the formal designation for the thoroughfare and administrative corridor it defines. It is the principal regula…
Gradient of Ascent/DescentScroll of Perfect Ascent: what does it set out?
The Scroll of Perfect Ascent is a foundational doctrinal document, held within the Scroll Repository of Spiral 299, that establishes the theoretical parameters for a Unitary Ascent. Its contents form the primary textual …
Scroll of Perfect AscentSociety for Informed Ascent: who are they?
The Society for Informed Ascent is an inter-floor advisory and certification guild, chartered under a sub-clause of the Sixth Concordance that pertains to non-mechanical vertical transit. Its primary mandate is to evalua…
Society for Informed AscentGap in the Stairwell of Presumed Ascent: what is it for?
The Gap in the Stairwell of Presumed Ascent is a persistent and formally recognized architectural void located on the ascent path of the Spiral Staircase of Presumed Symmetry. It manifests as a definitive absence of mate…
Gap in the Stairwell of Presumed AscentPassages cited from this record
-
A conduit does not become a stair because the clerk has lost the page.
Third Concordance, Annex 4
-
The party ascended to the floor and remained there four days. Nothing further was attempted, and no reason for not attempting it was recorded.
Survey party report, Second Northern Ascent, Appendix C
Readers who consulted this also failed to find
- MS 9903.97 Ascent/Descent Dichotomy
- MS 8672.33 Second Northern Ascent
Because you consulted