The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Builder’s Annex to Ordinance 707

MS 9937.15 · Documents and ordinances

The Builder's Annex to Ordinance 707 is the engineering schedule appended to Ordinance 707 governing the permissible sound carry of the Gilded Quire. It is not an ordinance in its own right, and the Librarians have twice declined to elevate it to one, holding in the Second Recension of the Annexes that a document "which fixes tolerances may not fix doctrine" (Recension II, note 14). The Annex is therefore binding on construction and silent on everything else, a distinction builders have tested on at least eleven recorded occasions.

The Annex runs to forty-one clauses and three folding plates, of which the second plate is missing from every surviving copy. The Bureau of Weights and Carries maintains that the plate was never issued; the Constructivist Guild maintains that it was issued four times and withdrawn three.

Origin and ratification

Ordinance 707 was ratified in the building season of the ninth Metathesis, in response to the acoustic complaints that followed the construction of the Gilded Quire's western gallery. The Annex was appended later in the same season, allegedly in a single night, by a drafting party of six under the direction of Master Builder Veyre of the Fifth Bench. Veyre's own account, preserved in the Bench Ledgers, Volume 19, records: "We were asked for a number. We supplied a number, and then supplied the conditions under which the number might be thought to hold, and then the conditions under which the conditions might be reviewed."

Ratification was irregular. Ordinance 4, Annex C provides that no annex to an ordinance may take effect until an Ordinance Clarifier has certified its relation to prior instruments, and the Clarifier appointed at the time, Clarifier Onnec, did not certify the Builder's Annex until the following winter, by which point the Quire's eastern buttresses had already been built to its tolerances. Onnec's certificate survives and reads, in full, "Certified. Proximately."

Sound carry and the ±3 measure

The central provision is Clause 9, which fixes the Quire's permissible sound carry at no more than three measures of attenuation per hundred spans of gallery, measured at the Aperture of the Seventh Span under conditions specified in Clause 10. Clauses 10 through 14 then specify the conditions, and disagreement begins at Clause 11, which requires that measurement be taken "in air of the ordinary kind, not less than one hour after the extinguishing of the lamps."

The Ordinance of Stillness had already fixed its own figure — two measures and a half — and the two instruments have never been reconciled. Concordance 707.4 attempts the reconciliation and, in the view of most readers, worsens it:

"Where two carry limits obtain to a single structure, the lower shall be read as advisory and the higher as historical, except during the fourth quarter, when neither shall be read and the structure shall be held to whatever it was built to."

— Concordance 707.4, clause 3

The Doctrine of Decimal Gradation, defended by Elara V in her tenure as Master Builder, was advanced partly to settle the question, on the reasoning that a limit expressed in tenths is a limit and a limit expressed in halves is a preference. The Constructivist Guild adopted the doctrine in its Bench Sessions of the Year of Nine Doors and has since applied it to six other annexes, none of them acoustic.

The Orchard's objection

Clause 27 exempts the Whispering Stairwell and the two floors immediately above it from the Annex entirely, on the ground that sound in that shaft "belongs to the shaft and not to the Quire." The exemption was negotiated by the Keeper of the Ninth Approach and is the reason the Settlement of the Whispering Stairwell could proceed on Floor 9,044 without reopening the Annex. Manifestational techniques applied there resolved contradictions in the builder's scrolls that had stood since the Quire's western gallery was raised.

The Orchard of Small Registers, which occupies the eastern face of the same shaft, has petitioned four times against Clause 27 on the curious ground that its seedlings germinate according to the Quire's carry and not the shaft's. The fourth petition, filed by Register-Keeper Annis Vole, is the only one written in the form of a table, and the only one the Librarians have read aloud.

Amendment history

The Annex has been amended nine times. Amendments 1 through 4 were typographical. Amendment 5, the Cadence Amendment, lowered the permissible carry at the request of the Order of the Unquiet Hours and was reversed within a season when the Quire's own bells fell below the audibility threshold of the Aperture of the Seventh Span. Amendment 7 extended the Annex's tolerances to cover stone that had been re-laid, a phrase on which three separate disputes now turn. Amendment 9 is not in the record; it is listed in the Register of Amendments as "made, and unmade, in the same sitting" (Register of Amendments, folio 212).

Since the ninth amendment, a maintenance note has been posted at the foot of the Annex in every scriptorium that holds a copy. It reads: "Do not measure in the rain."

Textual tradition

Three recensions of the Annex circulate. The Long Recension includes Clauses 38 through 41, which concern the pouring of the western footings and are held by the Bureau of Weights and Carries to have been drafted for a different building altogether. The Short Recension stops at Clause 34 mid-sentence. The Builder's Working Copy, annotated in at least four hands, is the only witness to Clause 40 and is kept under seal on the floor from which it was recovered, whose number is disputed and whose name is not.

Collation is further complicated by the fact that the Annex is customarily copied out beside Ordinance 17, Annex B, and copyists have a long habit of carrying the Marking schedules across the gutter. The Scriptorium of the Twelfth Landing issued a standing instruction against this in the term following the Dispute of the Two Ords, which did not resolve the question and did produce the widely cited ruling that a marginal note in a builder's hand is "evidence of the builder, not of the building" (Ruling of the Two Ords, clause 1).

See also

Referenced by

Readers also asked

Whispering Stairwell: where is it?

The stairwell serves as the primary vertical transit between the sub-annexes of Floor 881, though its utility is routinely questioned due to its acoustic properties. It is constructed from a veined grey stone (identified…

Whispering Stairwell
Ordinance 707: what does it set out?

Ordinance 707, formally titled the Ordinance of Ratified Silence, is a foundational document governing the ratification and archival status of Ordinances deemed too ontologically sensitive for standard promulgation. Its …

Ordinance 707
Long Recension: how is it conducted?

The Long Recension is the collective designation for a programme of textual revision undertaken across the Tower's administrative floors over a period never satisfactorily agreed, though most authorities place its denses…

Long Recension
Constructivist Guild: who are they?

The Constructivist Guild is a sub-guild within the Theoretical Jurisprudence Guild, specializing in the material codification and architectural realization of legal precepts and abstract ordinances. Unlike its parent bod…

Constructivist Guild

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.