The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

The Repository Question-Walls

MS 5848.67 · Objects and instruments

Definition and scope

The Repository Question-Walls is the collective designation for the load-bearing surfaces of the Repository of Unanswered Questions upon which question-forms are inscribed, mounted, or otherwise consigned. The term is administrative rather than architectural: it distinguishes those walls which carry inscribed question-forms from the surrounding triple-laminated Dampcrete envelope, which carries only weight. Under the criteria for Secure Repositories, the two functions are never discharged by the same surface.

The Question-Walls occupy the interior faces of the Repository's four principal bays and extend, in fragmentary runs, along the connecting corridors. Their total inscribed area is recorded as 1,944 square fathoms, though the Office of Structural Returns has measured 2,011 square fathoms on three separate occasions and has been instructed twice to withdraw the discrepancy.

Structural status

The Question-Walls are held to be Conceptual Load-Bearing Walls in the ordinary case: their integrity is assessed by Conceptual Load Testing against the unreal subject loads of the questions they bear. The higher a question's classification, the greater the conceptual load its mounting wall is said to sustain. This produces the familiar anomaly whereby a wall bearing several hundred Petrovich Bequest question-forms registers as lightly loaded, while a single Origin Question mounting requires bracing against an adjoining wall of comparable argumentative mass.

A minority position, associated with the nineteenth recension of the Treatise on Phantom Load-Bearing Walls, holds that the Question-Walls are not load-bearing at all but are instead surfaces of discharge — that they receive load rather than resist it. This position has never been adopted, partly because adopting it would require reclassifying every Secure Repository in the Tower as a foundation.

The Question of Rhetorical Status

Whether the Question-Walls are themselves rhetorical is the oldest unresolved matter touching the Repository. The Concordance on the Standing of Walls records, without resolving, a disagreement older than the document concerning whether Rhetorical Load-Bearing Walls are walls at all. Two annexes of the same Concordance reach incompatible conclusions; both were sealed, and the seal on Annex 4 was subsequently broken by parties unknown.

"A wall whose function is discharged by argument remains a wall for all purposes of maintenance, taxation, and burial."

— Concordance on the Standing of Walls, Annex 2

The counter-annex, unsigned, states only that "the proposition refutes itself upon being read aloud twice." The Scriptorium of the Grand Harmonic Repository has been asked to arbitrate on four occasions and has replied each time with a copy of its own founding charter.

Inscription practice

Question-forms reach the Question-Walls only after validation by the Register of Unanswered Questions. Validated forms are cut into Living Stone and set into prepared recesses; unvalidated forms found affixed are removed quarterly by the Clerks of the Standing Ladder, who deposit them in the antechamber crate marked for reconsideration. The crate has not been emptied since the tenure of Clerk Marn Halversen, who maintained that emptying it would constitute an answer.

Mounting depth is limited to one hand-span by the Eleventh Ordinance of the Repository, a rule introduced after an incident in Winter 3,441 in which an over-deep inscription on the north bay transmitted its question to the adjacent corridor, where it was answered by a passing archivist and had to be struck from the record along with the archivist's remarks.

Floor allocation and the Interstice 7402 question

The Question-Walls do not occupy a single floor. They extend across a vertical run whose numbering remains disputed: the Office of Floor Numbering assigns them to Floors 401 through 406, while the Repository's own waybills cite Floors 407 and 412. Neither sequence admits of reconstruction. Interstice 7402 lies, according to two sources, within this run; according to a third, it lies beside it, and the third source has been cited by both sides of the dispute as decisive.

The walls adjoin, at their eastern terminus, a stretch of Conceptual Load-Bearing Walls whose structural function is discharged by argument alone. Visitors are permitted to lean on the Question-Walls but not on the adjoining argument, on the grounds that leaning on an argument constitutes agreement with it.

Cross-references

The Question-Walls are distinct from the Aperture Theta question-mount, which processes rather than bears, and from the walls of the Repository of Anticipated Forms, which bear questions not yet asked and are therefore, by the standard test, lightly loaded indeed.

See also

Referenced by

Readers also asked

Interstice 7402: where is it?

“The space between two floors is just another floor—the question is who signed the forms.”

Interstice 7402
Secure Repositories: where is it?

The Secure Repositories are a designation applied to distinct chambers or entire floors within the Tower where sensitive or volitional materials are sequestered under enhanced custodial protocols. Their establishment is …

Secure Repositories
The Origin Question: how is it conducted?

The Origin Question is the unresolved procedural contention regarding the original source of the material used to construct the first volume of the First Concordance. The Question is formally defined as a Class 5 Open Qu…

The Origin Question
Conceptual Load-Bearing Walls: how is it conducted?

A conceptual load-bearing wall is a non-material structural member integral to the Tower's architecture, engineered to sustain the metaphysical weight of unrealized or contradictory concepts housed within a given floor o…

Conceptual Load-Bearing Walls

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.