The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Surveyor's Gauges

MS 5052.59 · Objects and instruments

Definition and scope

Surveyor's Gauges are the family of graduated instruments employed by the Cartographer-Surveyor Guild for the determination of floor intervals, lateral offsets, and the vertical drift of shelving under load. They are distinguished from the Temporal Gauges of the Office of Temporal Modulation in that they are held to measure extent rather than duration, though the distinction has been contested since the drafting of the Surveyor's Protocol. The standard instrument comprises a telescoping rod of blackened brass, a spirit vial, and a graduated sleeve bearing twelve subsidiary scales, of which no more than four are in general use.

The gauges are issued under the authority of the Surveyor-General's Office and are certified at the Office of Standards and Gauges by a procedure known as the Twice-Reading, in which the instrument is measured against the master rod and then measured again by a clerk who was not present for the first reading. Gauges failing the Twice-Reading are stamped with a small gamma and returned to the issuer's stairwell for regrinding.

Standing classifications

The Surveyor's Protocol recognises three grades of Surveyor's Gauge, though the wing catalogues list four, and the discrepancy is the origin of a dispute still open before the Third Concordance.

Grade Interval Certifying authority Notes
I 0–4 cubits Office of Standards and Gauges Carried by all Surveyor Units
II 4–40 cubits Metrological Spires Requires annual re-seating of the sleeve
III 40–400 cubits Surveyor-General's Office Two-clerk operation; see Surveyor's Report 900
(IV) indefinite unassigned Struck from the Protocol by the Ninth Concordance, reinstated by the Tenth

Relation to the Guild's surveying practice

The Surveyor-Primes hold that no measurement taken with a Grade III gauge may be entered into the Logbook without a corresponding entry in the Surveyor's Chain, a practice that doubles the clerical cost of every lateral ascent. The Surveyor-General for Lateral Ascent has objected to this on three occasions, most recently in a memorandum of the winter of the 89th recension, arguing that the Chain and the Gauge measure different things and that the pairing is "an act of faith dressed as a check." His memorandum was received and filed without reply.

Independent practitioners on the outer stairwells use a shortened form known colloquially as a thumb-gauge, which is not recognised by the Guild but is nonetheless calibrated twice yearly at the Office of Standards and Gauges for reasons the clerks there decline to record.

The Kilon controversy

In the 87th recension, the gauge-warden of Floor 617, one Halbrek Kilon, discovered that his Grade II instrument had been stamped with the mark of a Grade III instrument by an overzealous apprentice. Kilon proceeded to certify a series of intervals of up to 90 cubits using the misstamped gauge, and the resulting shelf-spacing on three adjacent floors remains measurably irregular. The matter was brought before the Surveyor-Prime Elara Vance, who held that the error lay with the apprentice and not with Kilon, since the instrument as stamped was the instrument as read. The opposite view, advanced by the Surveyor-Prime Althea, was that a gauge's authority inheres in its construction rather than in its stamping. The Third Concordance has never resolved the question, and both readings appear in the current index.

Kilon was reassigned to the wing that holds the Polian Gauges, where he is said to keep the room very clean.

Certification and periodicity reports

Certified Surveyor's Gauges are required to appear in the periodicity reports maintained by the Office of Temporal Modulation, a requirement inherited from the era when the two instrument families were administered together. Procurement of a new gauge requires a triplicate permit, and the ward's instrument room keeps a standing set aside for the grading of incoming material.

"A gauge that has not been read twice has been read once, and once is an opinion."

— Surveyor's Protocol, Clause 14

See also

Visitors to the gauge-rooms are reminded that instruments on their brackets are not to be lifted, and that the reading lamps on Floors 617 through 621 are extinguished at the ninth bell regardless of who is working.

See also

Referenced by

Readers also asked

Surveyor-General's Office: who are they?

The Surveyor-General's Office is the Tower's principal body for the measurement, recording, and eventual abandonment of floors whose dimensions will not hold still. It is distinct from the Surveyor-General for Lateral As…

Surveyor-General's Office
Surveyor's Chain: how is it conducted?

The Surveyor's Chain is a procedural doctrine used to establish traceable provenance for observations made during official expeditionary work within The Tower. It is distinct from, though often conflated with, the Unspoo…

Surveyor's Chain
Cartographer-Surveyor Guild: who are they?

The Cartographer-Surveyor Guild is a chartered body of the Tower responsible for field observation and documentation, and for the making and correction of maps produced under the Surveyor's Protocol. It maintains a stand…

Cartographer-Surveyor Guild
Ninth Concordance: what does it set out?

The Ninth Concordance is the ninth of the thirteen principal legislative and administrative codes governing operations within the Tower. Ratified on 12 Nisan in the Year of the Ninth Librarian in the immediate aftermath …

Ninth Concordance

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.