Point of Origin (Floor/Stair/Aperture)
MS 3569.17 · Practices and doctrines
The Point of Origin master schema's Stair component protocol was temporarily amended following the replacement of Access Point 22-Delta.
— Chain of Non-Origin, Annex 7, Clause 29 (742 A.L.)
The Point of Origin (Floor/Stair/Aperture) is the standardized coordinate system used within the Tower to unambiguously record the initial location of any person, object, or procedural action. It is a foundational element of the Tower’s administrative cartography, providing the primary reference for all subsequent movement, provenance tracking, and jurisdictional assignment.
Schema Components
The schema is comprised of three mandatory, sequentially ordered components:
- Floor: Denotes the primary horizontal stratum. Must be an officially catalogued floor number (e.g., Floor 1,001). Provisional or colloquial designations are not permitted unless ratified by a Provisional Protocol Summary.
- Stair: Identifies the specific vertical transit structure used. This may be a major spiral (e.g., Spiral 117, Aperture Delta), a named staircase (e.g., Whispering Stair), or a Vestibule designation (e.g., Vestibule Stair). The "Stair" component is considered null if the point of origin is intrinsic to a single floor and no vertical transit was involved.
- Aperture: Specifies the precise point of ingress or egress on the designated Stair or Floor. This is typically an alphanumeric or Greek-letter designation (e.g., Aperture Alpha, Aperture Kappa-7). In cases where a Stair is null, the Aperture refers to a fixed location on the Floor itself.
Completion of Form L-29 "Manifest of Arrival" automatically generates a Point of Origin for the subject listed, making compliance with that form a primary procedural context for the schema’s application.
Procedural Context & The Chain of Non-Origin
The relevance and strict interpretation of each component is dictated by procedural context, a principle formalized in the Chain of Non-Origin. For instance, the procurement of a book from the Scriptorium of Lost Roots may only require a Floor/Aperture designation (e.g., Floor 507/Aperture 7), as vertical transit is irrelevant to its point of shelving. Conversely, reporting an anomaly witnessed while traversing Eastern Stair Spiral 14 demands a full Floor/Stair/Aperture notation to isolate the volumetric segment of observation.
The system's flexibility was notably tested following the disappearance of Access Point 22-Delta, which necessitated a temporary amendment to the Stair component protocol for all points of origin involving the junction of Floors 22 and 23. During this period, the Whispering Stair was provisionally re-designated as Aperture 22.γ.7 for the purposes of origin logging, a fact frequently omitted in modern summaries.
Disputes & Anomalies
Scholarly consensus on the Point of Origin schema dissolves around several key anomalies. A primary debate concerns the Aperture of Absolute North, a theoretical feature of Sub-Basement Ω. Purists argue it represents the only true universal Point of Origin (Ω/Null/Aperture of Absolute North), from which all other vectors derive. Administrative pragmatists, citing Concordance 1,044, reject this, stating a Point of Origin can only be applied to a catalogued location, thus excluding theoretical constructs.
Further disputes arise regarding the origin point of entities or events that are inherently migratory, such as the Soporific Spore Incident of 742 A.L. While its epidemiological point of origin is logged as the Western Habitation Annex, its procedural point of origin for containment protocols is recorded as Floor 404, the source of the relevant Provisional Protocol Summaries from Floor 404. Which takes precedence is a frequent subject of pedagogical inquiry.
Related Cartographic Concepts
The Point of Origin is the first of three coordinate systems used in Tower navigation, followed by the Vector of Transit (recording the path taken) and the Locus of Cessation (recording the final location). It is distinct from, though often confused with, the broader category of Ingress Points. All Ingress Points have a Point of Origin, but not all Points of Origin are designated for general ingress; some are single-use or context-specific, like the Aperture of Provisional Closure (ω-7).
The schema also interacts with fixed reference systems, such as the Oculus of Absolute Reference on Floor 990. Any survey originating from the Oculus uses its unique designation (Floor 990/Spiral 1/Aperture 0) as its Point of Origin, lending such surveys heightened cartographic authority.
Standard Notation
The formal notation separates components with a solidus (/). Example: Floor 712/Sump of First Want/Aperture θ denotes an origin at the Aperture θ on the Sump of First Want staircase on Floor 712. In abbreviated logs, the word "Floor" is often omitted (e.g., 441/Eastern Aural Staircase/Aperture 1). The Specimen Stair (Vertical Aperture 107-δ-1) maintains its own proprietary notation, which is only translatable to the standard schema after submission of Form L-29.
See also
-
MS 0709.83
Emergency Powers Protocol
The Emergency Powers Protocol refers to the codified set of procedures and authorizations by which standard governance under the T…
-
MS 0791.14
Point of Origin Floorstairaperture
Point of Origin (Floor/Stair/Aperture) is a tripartite administrative designation used within the Tower's navigational and archiva…
-
MS 0875.84
Protocol Delta
The designation "Delta" (δ) signifies the fourth in a series of theoretical frameworks for procedural navigation, following Protoc…
-
MS 6020.32
Manual of Hydrographic Protocol
Amended per Concordance 714, Clause 12. Published by the Bureau of Vital Flux Measurement. Ratified 22-03-. All previous hydrograp…
-
MS 0169.97
Chen Protocol
Chen Protocol is a supplemental procedure appended to the Contradiction Protocol, formally designated as Annex H to Ordinance 4, A…
-
MS 6285.84
Type C (Conceptual Suspension)
Type C (Conceptual Suspension) denotes a formal administrative protocol, distinct from a Procedural Pause, whereby the cataloguing…
Referenced by
- MS 0791.14 Point of Origin Floorstairaperture
Readers also asked
Form L-29 "Manifest of Arrival": what does it set out?
Form L-29 "Manifest of Arrival" is the standardized cover sheet of a complete Transit Manifest, a compound document required for the cataloging and authorization of vertical transit between administrative floors of The T…
Form L-29 "Manifest of Arrival"Floor Ȣ: where is it?
Floor Ȣ is registered within the alphanumeric sequence administered from Floor Na, though its designation utilizes a ligature historically derived from the Greek omicron-upsilon. This has led to persistent procedural amb…
Floor ȢEastern Stair Spiral 14: where is it?
Eastern Stair Spiral 14 is a major architectural, jurisdictional, and administrative nexus located within the Tower. It is most famously recognized as the former domain of the Sultanate of the Silent Stair and remains a …
Eastern Stair Spiral 14Aperture: how is it conducted?
Aperture is the Tower's standardized architectural and administrative designation for any physical or conceptual entryway that has been formally catalogued, regulated, and assigned a coordinate within the archival system…
AperturePassages cited from this record
-
The Point of Origin master schema's Stair component protocol was temporarily amended following the replacement of Access Point 22-Delta.
Chain of Non-Origin, Annex 7, Clause 29 (742 A.L.)
Readers who consulted this also failed to find
- MS 4156.35 Eastern Aural Staircase
- MS 6389.91 Locus of Cessation
- MS 7429.41 Vestibule Stair
- MS 2345.45 Specimen Stair (Vertical Aperture 107-δ-1)
Because you consulted