The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Office of Auditory Compliance

MS 4794.29 · Guilds, orders and offices

The Office of Auditory Compliance is an administrative body charged with the reconciliation of sound actually occurring within the Tower against sound authorised to occur. It is not to be confused with the Office of Auditory Consistency, which governs the permissible shape of phonemes, nor with the Office of Acoustic Consistency, which holds a separate and older charter over resonance in enclosed volumes; the two offices have not spoken since the Aperture Question of 411. The Office of Auditory Compliance occupies Rooms 6 through 11 of the Auditory Annex of Floor 347, shares its east wall with the local permitting office of the Spire of Auditory Phantoms, and reports, in matters of doctrine, to the Auditory Permit Office on Floor 9001.

Its founding instrument is Auditory Annex 12-B, issued by the Acoustic Compliance Bureau, which established the office in order that no auditory phenomenon should be both heard and unaccounted for.

Mandate

The Office maintains the Ledger of Heard Events, a running register in which every sound reported by a Warden, an usher, or a sufficiently insistent resident is entered against the permit that authorised it. Most entries reconcile without difficulty. Those that do not are held open and styled unmatched, a designation that persists until either a permit is found or the sound is formally declared to have been the building.

The office does not issue permits, a restraint imposed upon it by Fourth Concordance, Annex 9, which found that an office both permitting and auditing sound "will hear what it has permitted and nothing else." Clerks of the Office are accordingly forbidden to attend demonstrations of any sound they will later assess.

Twice yearly the Office conducts a sweep of the Annex with brass tuning-pastilles, confirming that the rooms still ring at their recorded pitches. Rooms that have drifted are reported to the Office of Vertical Logistics, which owns the walls.

The Hum

The greater part of the Office's labour concerns The Hum. Whereas operational oversight of The Hum was delegated to the Auditory Permit Office, its day-to-day reconciliation falls to this Office, and the arrangement has produced four decades of friction. The Office's position, stated in a memorandum of Archivists' Winter, Year 12 of the Current Recension, is that oversight without reconciliation is "a signature without a sound behind it."

"The Hum is heard by all and permitted by one. The Office does not dispute the permit. The Office merely observes that no one has yet produced the sound it describes."

— Memorandum of the Office of Auditory Compliance to the Auditory Permit Office, Archivists' Winter, Year 12

The Bureau of Metric Compliance has twice attempted to settle the matter by measurement and twice withdrawn, on the grounds that any instrument sensitive enough to record The Hum also records the clerk holding it.

Dispute over the eastern bound

The Office's jurisdiction is bounded by Aisle Gamma-7, whose eastern limit the Fourth Concordance fixed at a point three apertures nearer the core than the Acoustic Compliance Bureau now allows, as recorded in Auditory Annex 12-B. The Office has declined to amend its floor plan. Its clerks continue to reconcile sounds occurring in the disputed three apertures and to stamp the resulting entries provisional, a practice the Bureau has protested without effect since the Concordance of Bounds, Clause 6 left the question of provisional stamps unaddressed.

In the winter of Year 19 a clerk, Marn of the Ninth Desk, reconciled the same footfall eleven times because it fell within the disputed strip and neither office would accept the entry. Marn's subsequent note — that the walker had crossed the boundary only twice — is preserved in the Annex reading room and is the most cited document in the dispute.

Relationship to the Auditory Permit Office

Formally the Office is subordinate; practically it is not. The Auditory Permit Office handles initial classification and issues permits for intentional sound-generation studies, after which the Office of Auditory Compliance must verify that what was generated resembles what was described. Permits are frequently written loosely. The Index of Auditory Phenomena records at least forty instances of a permit authorising "a sustained tone" that produced, on the day, something the Warden of the Vestibule of Auditory Phantoms declined to name in writing.

Where a permitted sound is not heard at all, the Office enters a negative confirmation. These are filed in grey folders and are not discussed at audit.

Holdings

The Office's Room 8 contains the following, as of the last inventory:

  • One hundred and six grey folders of negative confirmations, Years 3 to 41.
  • The Ledger of Heard Events, in nine recensions, the earliest water-damaged above the entry for Year 2.
  • A boxed set of brass tuning-pastilles, two missing, believed lent.
  • The Marn correspondence, unbound.

Visitors are asked to leave their bells at the door.

See also

Referenced by

Readers also asked

Auditory Annex 12-B: what does it set out?

Auditory Annex 12-B is the founding instrument of the Office of Auditory Compliance, issued by the Acoustic Compliance Bureau in the eleventh recension of the Bureau's standing orders. It is a document of nine clauses an…

Auditory Annex 12-B
Office of Vertical Logistics: who are they?

The Office of Vertical Logistics (OVL) is an administrative body within The Tower responsible for the regulation, safety certification, and spatial compliance of all physical objects in vertical transit. Established by A…

Office of Vertical Logistics
Fourth Concordance: what does it set out?

The Fourth Concordance is a foundational Tower document, now extant only in fragmentary quotations and secondary references. Its authority was formally superseded by the ratification of the Fifth Concordance, which was d…

Fourth Concordance
Bureau of Metric Compliance: who are they?

Bureau of Metric Compliance is the administrative office charged with the verification of measured quantities upon those floors where the metric in question has not yet been surrendered to Metric Caging or declared unsta…

Bureau of Metric Compliance

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.