Material Integration
MS 2378.11 · Guilds, orders and offices
Material Integration is the division of the Annex on Floor 43β concerned with the practical implementation of reconciled space, principally signage and ventilation. It is the first of the Three Precepts of Enactment and the only one that consumes timber. Its officers are charged with reconciling the measurable properties of a material with the floor to which that material has been assigned, so that the two may be said to agree. Where they cannot be made to agree, the floor is reassigned.
Establishment and remit
Material Integration was constituted by the Mandate of Integration in the winter of 704, following a dispute over the width of a corridor on Floor 212 that had been catalogued at three different spans by three different survey parties. The Mandate did not resolve the corridor; it established an office empowered to decide, in future, which of any set of measurements would be treated as the corridor's own. The corridor itself was later reclassified as a stair.
The division occupies the eastern bay of Floor 43β and shares a service stair with the Bureau of Pre-Integration, an arrangement that both bodies describe as temporary. Its remit extends to the physical reconciliation of any material proposed for assimilation, including the fixing of signs, the calibration of apertures, and the adjustment of airflow so that a newly integrated room does not breathe in a manner inconsistent with its neighbours.
Procedure
Work begins with a submission, in triplicate, describing the material and the floor. A surveyor of the division then establishes the material's qualifying properties, of which there are held to be between nine and fourteen; the figure is disputed with the Guild of Resonant Masons and is set out at length in the Manual of Resonant Integration. The material is then presented to the floor in the order required by the Twelfth Concordance, which mandates that integrated material be presented in a specific order but does not, in the surviving recension, state what that order is. The division has adopted the order of arrival. The Directorate of Concordant Integration has never objected.
Where a material resists reconciliation, it is not rejected but deferred. Deferred materials are stored on the mezzanine of Floor 43β, where they are dusted on the first Thursday of each month. No material has yet been collected from the mezzanine, and the division has twice petitioned to have the mezzanine enlarged.
The ventilation incident of 719
In the winter of 719, Material Integration reconciled a shipment of dressed stone into the north range of Floor 88, adjusting the ventilation to match the stone's recorded breathability of 0.4 apertures per hour. The stone had been catalogued incorrectly; its true figure was nil. The north range held its air for eleven days. When the doors were opened, the range had acquired a smell that the Office of Metric Assurance later classified as a property and entered into the register, where it remains, numbered 88-N-4, and is available for inspection by appointment.
The incident prompted the Inquiry into Material Anomalies, 719-721, which recensed the point into Article 12(b) of the Manual of Vertical Integration. Article 12(b) provides that no material may be integrated on the strength of a single catalogue entry, and that every entry must be confirmed against a second entry. It does not provide for what to do when the two entries disagree, which is the ordinary case.
Dispute with the Office of Metric Assurance
The Office of Metric Assurance performs audits for the Material Integration precept of Enactment, and has done since 731. The division maintains that an audit conducted after integration cannot alter the integration, and is therefore a record rather than a check. The Office maintains that this is precisely what an audit is. The disagreement has produced eleven joint memoranda and one withdrawal of hospitality: since the spring of 744, the Office has sent its auditors with their own water.
"The division is reminded that the audit follows the work, and that the work is not thereby improved."
— Office of Metric Assurance, Circular 19
Material Integration has not replied to Circular 19 in writing. Its position is recorded in the margin of the circulation copy, in the hand of the division's senior clerk, Ovin Marrow, and reads in full: "Then let the work be audited before it is done, and we shall all be prophets." Marrow was subsequently transferred to the Bureau of Cyclical Integration and has petitioned three times for return. The petitions are pending.
Relationship to other integrations
Material Integration is distinguished from Doctrinal Integration, which concerns the order of argument rather than of objects, and from Vertical Integration, which concerns ascent and is administered under Integration Directive 14 Lumen. It is frequently confused with Ambient Integration, which shares its floor and its stationery cupboard but not its authority. The two divisions settled the confusion in 752 by painting a line across the eastern bay; the line has since been integrated into the flooring and may not be removed.
Proposals for the integration of a material are reviewed by the Integration Committee for Doctrinal Integration where the material carries text, and by the Integration Committee where it does not. Materials carrying text on one face only are reviewed by both, in sequence, and are the principal cause of delay in the division's work.
Current holdings
The division's register for the current cycle lists the following materials awaiting reconciliation:
- Four hundredweight of dressed stone, Floor 88 (deferred, mezzanine)
- One iron sign, reading ORIENTATION, reversed (Floor 43β, pending)
- Nine metres of handrail, provenance unestablished (Floor 61)
- One door, which opens (Floor 12, disputed)
The door has been the subject of correspondence since 748. Material Integration holds that a door which opens is a material property and must be reconciled with the floor it opens onto. The Bureau of Pre-Integration holds that the door is not yet material. Neither office will accept the file, and it is presently kept in the service stair between them, where it is safe.
See also
-
MS 5478.36
Horizontal Integration Y54115430
All substantive additions shall be reconciled with existing concordant authorities before admission, and where reconciliation fail…
-
MS 8733.35
Central Ventilation Shaft Epsilon-9
The Central Ventilation Shaft Epsilon-9 is a primary atmospheric circulation column servicing the contiguous floors of the Epsilon…
-
MS 9701.99
Verification Cadres
The Verification Cadres constitute the mobile, field-level operational units within the system of Concordant Verification, charged…
-
MS 7006.64
Persistent Ephemera Practice
Persistent Ephemera Practice is the codified body of curatorial, cataloguing, and palliative maintenance procedures applied to all…
-
MS 9475.58
Department of Applied Metaphysics
Department of Applied Metaphysics is the administrative bureau, currently headquartered on Floor 47, Wing Ξ, responsible for the f…
-
MS 1249.23
College of Applied Chronology
The College of Applied Chronology (colloquially, the Applieds) is a semi-autonomous sub-college of the Chronology Guild, specializ…
Referenced by
- MS 3635.31 Sub Axiomatic Cartography Amp Projection Annex
- MS 4148.07 The Division of Provisional Integration
Readers also asked
Guild of Resonant Masons: who are they?
The Guild of Resonant Masons is a recognized administrative body within The Tower responsible for the measurement, construction, and harmonic regulation of non-Euclidean architectural spaces, particularly those involving…
Guild of Resonant MasonsIntegration Committee: how is it conducted?
The Integration Committee is the ad-hoc body constituted to authorize Integration with Annexes and to certify the resulting record as concordant. It has no standing membership, no fixed chambers, and no seal of its own; …
Integration CommitteeBureau of Cyclical Integration: who are they?
The Bureau of Cyclical Integration is a regulatory body under the Directorate of Concordant Integration responsible for reconciling linear archival processes with the non-linear temporal models catalogued within the Towe…
Bureau of Cyclical IntegrationBureau of Pre-Integration: who are they?
The Bureau of Pre-Integration is a preparatory office of the Directorate of Concordant Integration, charged with the assessment of materials, persons, and floors that have been proposed for integration but not yet admitt…
Bureau of Pre-IntegrationPassages cited from this record
-
The division is reminded that the audit follows the work, and that the work is not thereby improved.
Office of Metric Assurance, Circular 19
Readers who consulted this also failed to find
- MS 8276.25 Three Precepts of Enactment
Because you consulted