The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

List of Approved Architectural Materials

MS 2727.33 · Documents and ordinances

Scope and Standing

The List of Approved Architectural Materials is the principal schedule of substances permitted for construction, facing, suspension, and repair throughout the Tower. It is maintained by the Office of Architectural Resonance and issued in fascicles, each fascicle superseding its predecessor without formally revoking it. The current running edition is the Forty-First Recension, though several floors continue to work to the Thirty-Fourth on the strength of a Concordance ruling that has never been withdrawn.

The List does not describe what a material is. It describes what a material may be used for, under which conditions, and with which filings. A substance may appear as approved on one line and prohibited three lines later, provided the contexts differ sufficiently; the Office considers this a feature of a mature schedule.

Structure of the Schedule

Each entry carries a designation of the form List of Approved Architectural Materials#Item nn, an alphanumeric assay reference, a permitted-use clause, and one or more exclusions. Designations are assigned on receipt of the sample, not on approval, which is why the numerals run in no recoverable order. The Office has repeatedly declined to renumber, citing the cost of correcting standing cross-references in the Manual of Ceremonial Adhesion and the Manual of Architectural Transitions.

The exclusions are frequently the more informative half of an entry. Item 44, 'Doubtful Slate', is approved for the walls of Floor 450.5 and for no other application recorded in the schedule; its assay note, in the hand of a long-dead recorder, reads only consents reluctantly. Items in the 110s govern pigments and are almost entirely exclusions. A small cluster of entries in the 300s governs mortar, of which only Luminous Mortar has a permitted-use clause broad enough to cover general stack work.

Approval of a material for use in any corridor is contingent upon the coating regime approved under Ordinance 889-B, which the Office administers alongside the List. Practitioners are advised that approval of a substrate confers no approval whatsoever upon its finish, and that the converse also holds.

Contested Entries

Two long-running disputes attach to the schedule. The first concerns the status of 'provisional' materials — those entered with a two-year lapse clause that has, in several instances, gone unenforced for over a century. The Office holds that a lapsed approval is void; the Bureau of Static Metrics holds that lapse without notice is a form of notice, and continues to accept submissions against entries that the Office considers dead. The Twelfth Concordance was invoked to settle the matter and instead produced a third position, which is that lapse is a property of the shelf rather than of the entry.

The second dispute concerns apertures. Materials used in the framing of a shelf aperture must be entered on the Master Shelf Coordinate List before they are entered on the List, or after, or simultaneously; three successive rulings specify three different orders, and no ruling has been withdrawn. In practice, framers apply to whichever office responds first, and the resulting inconsistencies are reconciled during audit rather than at the point of construction.

Assay and Admission

Admission to the schedule begins with a sample submitted to the Office in a sealed tray, accompanied by a statement of intended use and the name of the proposing party. The sample is assayed for density, behaviour under low light, response to ceremonial framing, and what the assay clerks record as disposition. A negative disposition is not necessarily fatal; several approved materials are noted as sullen, guarded, or disinclined toward corners.

Rejected samples are retained for one cycle of shelf rotation and then released to the general supply, at which point they become indistinguishable from unapproved stock. This has caused at least two documented instances of a rejected material reappearing in a corridor as a finished surface, correctly cited, and approved under a new designation.

Related Holdings

The List intersects with Supply of Approved Media, which governs the reading stock shelved against materials of the same designation, and with Custodial Protocols, which specify the cleaning agents permitted upon each approved surface. Surfaces approved for the Neutral Reading Room carry a further restriction that no polishing compound bearing a fragrance may be applied, a clause that dates from an incident the Office declines to date.

Materials intended for a rite rather than a structure fall under the Manual of Ceremonial Adhesion and are cited there, not here, except where the same substance appears in both schedules — in which case both citations are correct and neither is sufficient.

See also

Referenced by

Readers also asked

Manual of Architectural Transitions: what does it set out?

Manual of Architectural Transitions is the principal codification of the Tower's interior passageways, thresholds, and vertical seams, administered by the Architects' Guild under the provisions of Concordance 5 and revis…

Manual of Architectural Transitions
Ordinance 889-B: what does it set out?

Ordinance 889-B, "Regarding the Prevention of Auditory Echoes in Corridors Marked with Spiral Sigils," as ratified under the emergency provisions of Ordinance 707. Amended twice; superseded in part by Ordinance 712b. See…

Ordinance 889-B
Manual of Ceremonial Adhesion: what does it set out?

The Manual of Ceremonial Adhesion is the standing instruction of the Librarians for the fixing of any ceremonial object to any other surface, and is the senior authority on the subject in all matters not expressly reserv…

Manual of Ceremonial Adhesion
Neutral Reading Room: how is it conducted?

The Neutral Reading Room is an administrative annex within the Central Reading Room, functionally defined as the designated precinct for the review and processing of materials assigned a Neutral Tag. It is not a fixed ar…

Neutral Reading Room
Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.