Architectural Survey Office
MS 0060.23 · Guilds, orders and offices
The Architectural Survey Office (ASO) is the Tower body charged with the measurement, description, and certification of structures that are not yet built, have been built and are disputed, or were built at some point no one now remembers and must therefore be re-surveyed from the ground up. It is not to be confused with the Office of Architectural Permanence, which governs silence and postponement, nor with the Office of Architectural Resonance, which maintains the List of Approved Architectural Materials; the ASO's remit is narrower and, in the assessment of its own historians, "endlessly preliminary." Its founding is habitually dated to the sixth amendment of the Fourth Concordance, though the Office itself prefers the figure given in its standing preamble, which claims continuous operation since "before the question was properly put."
Remit and method
The Office surveys in three registers, known internally as the prospective, the adjudicative, and the residual. The prospective register records buildings that have been proposed and not begun; the adjudicative register records buildings whose existence is contested between two or more offices; the residual register records everything left over from the first two. In practice the residual register receives the most work and has never been closed. At the last count entered by the Office's own scriptorium, it ran to eleven thousand four hundred entries, of which some two hundred are thought to describe structures that still stand.
Surveyors work in pairs, one carrying the chain and one carrying the notation, and are forbidden by Ordinance 14(c) of the Architectural Survey Office from speaking to one another during the survey itself, on the argument that discussion at the site is the origin of most error. Pairs communicate by the exchange of marked slates. A pair that disagrees on a measurement does not reconcile it at the site; the discrepancy is entered on a Form 3 Discrepancy and forwarded to the Office of Bench Survey, which measured Aperture 7 Gamma on three occasions and has never published a reconciled figure.
Founding and the Survey of the Wandering Corridor
The ASO's first recorded work is the survey of the on Floor 5017, begun in survey year 3,904 and resumed, by successive survey parties, in 3,932, 3,958, and 4,077. The corridor was found on each occasion to have a different number of turns. The Office's initial ruling held that a corridor whose turns could not be fixed was not a corridor but a "condition of passage," and could not be surveyed at all. This ruling was overturned two years later on a clarification from the Office of Architectural Permanence, which observed that conditions of passage were also structures and required measuring more carefully than corridors did.
"Where the subject will not hold still, the surveyor must hold still twice as long."
— Office of Architectural Permanence, Clarification on Measurement, clause 6
Later parties measured the corridor by walking it twice and subtracting, a method that produced consistent results but no corridor. The survey remains open. Survey parties are still dispatched to Floor 5017 at intervals of eleven years.
The Crispin Recension
Between years 4,301 and 4,307 the Office underwent a schism over whether its survey records should be kept in the order taken or the order built. The two parties became known, after their advocates, as the Crispin Recension and the Order Party, and the dispute is generally accounted the most expensive in the Office's history: three recording halls were duplicated, forty clerks were paid twice, and the ASO's copies of the Partial Survey were rebound in two different sequences, both of which survive.
The question was settled in year 4,309 by Concordance 27, Annex 3, which ruled that the order taken was the older order and the order built the younger, and that the older order should not be disturbed "merely because the younger is more nearly true." The ruling is widely resented. A marginal note in the surviving working copy of the Annex, in a hand identified as that of the recorder Vessil Arn, reads: "Then we are to measure the survey and not the building." The note has never been answered, though the Office has twice commissioned a survey of it.
Feud with the Bureau of Architectural Integrity
The ASO and the Bureau of Architectural Integrity have been in dispute since the Bureau asserted, under its own instrument of year 4,112, a prior claim to any structure that had already been certified as sound. The Office objected that a structure could not be certified sound before it was surveyed, and the Bureau replied that the Office's surveys had never been concluded and that on the Office's reasoning nothing in the Tower could be certified at all. The Librarians declined to resolve the matter, noting only that the concerned offices should settle it "by the ordinary citation of instruments," which both have done, at length, and without effect.
In year 4,205 the dispute was formally narrowed by the First Protocol Addendum 12.β of the Office of Vertical Survey, which distinguished between structures certified sound and structures surveyed as sound. The distinction is maintained by all three offices and has never been applied in any case, no case having arisen that met both descriptions.
Practice and prohibitions
Surveyors are required to carry three slate pencils and to surrender one to the office of entry on any floor above the Petalline Survey line, where the pencil tax is collected. Chains are not to be dragged across the mosaic of the Silent Stairwell, a prohibition issued by Maintenance of Architectural Silence after an incident in year 3,988 that the Office has surveyed twice and describes neither time. A surveyor who reaches the end of a structure before the end of the chain records the shortfall and says nothing about it until the pair reconvenes.
The Office publishes almost nothing. Its principal output is the Standing Register of Unfinished Surveys, which is updated irregularly and is thought to describe, in aggregate, most of the Tower. Whether the Register is itself a structure requiring survey has been raised four times and declined four times, on the ground that the question is not one the Office is competent to put.
See also
-
MS 3920.08
Corps of Linear Reckoning
The Corps of Linear Reckoning is a standing body of the Tower charged with the measurement, certification, and (since the disputed…
-
MS 8227.71
Omega Truss
The Omega Truss is a disputed structural and metaphysical element presumed to exist within the architectural logic of floors desig…
-
MS 1596.08
The Division of Radial Measurement
The Division of Radial Measurement is the administrative body charged with the conduct, verification, and certification of Radial …
-
MS 4311.00
Bureau of Measurable Holdings
Bureau of Measurable Holdings is the Tower department charged with the certification, recalibration, and custodial indexing of all…
-
MS 2509.34
The Office of Stairwell Calibration
The Office of Stairwell Calibration is the Tower body principally charged with the measurement, certification, and periodic re-mea…
-
MS 6984.73
Office of Provisional Geometry
The Office of Provisional Geometry is a standing office of the Tower concerned with the measurement, certification, and recall of …
Referenced by
- MS 0139.65 Screaming Pillars
Readers also asked
Maintenance of Architectural Silence: how is it conducted?
The Maintenance of Architectural Silence constitutes a specialized procedural discipline within the Office of Architectural Permanence, dedicated to the preservation, measurement, and regulated degradation of non-acousti…
Maintenance of Architectural SilenceFloor 5017: how is it conducted?
Floor 5017 is a lost-property and restitution floor situated between Floor 4001 and Floor 9,011, at a height that the survey parties of the Vertical Survey Office have never agreed upon in writing. It has been catalogued…
Floor 5017Office of Architectural Permanence: who are they?
The Office of Architectural Permanence is the Librarian body responsible for certifying the structural completion and ontological fixedness of built environments within The Tower. Its mandate, established by Ordinance 4,…
Office of Architectural PermanencePetalline Survey: how is it conducted?
Petalline Survey refers to the primary, ongoing, and institutionalized disciplinary activity of the Office of the Cartographer-Archivist, commissioned by Concordance 3 in Year 73 of the Eighth Chronology. Its mandate is …
Petalline SurveyPassages cited from this record
-
Where the subject will not hold still, the surveyor must hold still twice as long.
Office of Architectural Permanence, Clarification on Measurement, clause 6
Readers who consulted this also failed to find
- MS 8959.17 Standing Register of Unfinished Surveys
- MS 4555.65 Ordinance 14(c) of the Architectural Survey Office
- MS 6923.67 Office of Architectural Resonance
- MS 8779.30 Crispin Recension
Because you consulted