The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Concordance Tower

MS 4403.56 · Practices and doctrines

Concordance Tower is the designation formally reserved, under Concordance 801, for whichever structure is at any given moment the sole lawful issuer of Concordances. The designation is not a courtesy title and does not travel with any particular building. It is a status, conferred by holding, and it has been held by at least eleven structures since the practice of Concordance-issuing began, though the count is contested (see Disputed Holdings, below). In ordinary usage within the Tower, "the Concordance Tower" refers to the currently issuing structure; in the Concordance of Bounds, the phrase is defined more narrowly as a demarcation, not a place, a distinction that has caused considerable friction between the Bounds office and the Seals Recension.

Origin and the question of the First Tower

The designation originates with The First Concordance, Clause 3 of which reserves the right of issuance to a single "tower of record," without naming one. The omission is generally read as deliberate. The Second Concordance attempted to remedy it by naming a specific structure and was struck through in the recension of Tower Year 40, the strikethrough itself now being the authoritative text; the surviving clause reads only "the tower, whichever it is." Clerks have copied that phrase into the front matter of every recension since, which is why Concordance 742 still carries it in its preamble despite being about seals.

Whether The First Concordance intended a permanent structure or a rotational office is the oldest unresolved question in the archive. The Precedent Concordance cites the rotational reading at Annex 2 and the permanent reading at Annex 9, twenty pages apart, without acknowledging the contradiction.

Ritual of designation

When a structure becomes Concordance Tower, the outgoing issuer surrenders its seal to the Recension and the incoming structure receives the Metrological Accord weights — nine iron standards, none heavier than a loaf — as tokens of office. No other ceremony is prescribed. The towers themselves are generally ordinary Tower fabric: stairwells, landings, a room with a lockable door. None has been found to have unusual architecture, though the designation does tend to make occupants give directions by it.

"Let the instruments be carried, and let no one be told the way by anyone unsealed."

— Concordance 801, Annex 3

A persistent housekeeping instruction attached to all Concordance Tower holdings, and repeated verbatim in every recension, requires that the landing outside the issuing room be swept before any Concordance is sealed, and forbids storage of the brush on that landing.

Disputed holdings

The Winter of Floor 404

In the winter of the year recorded only as Tower Year , the structure on Floor 404 issued forty-one Concordances in nine days while a rival structure on the adjoining landing issued forty-two. Both claimed the designation. Neither seal was surrendered. Concordance 45, Annex Delta was promulgated to settle the matter and instead established that a structure may be Concordance Tower for the purpose of the documents it issues, which permitted both issuers to continue and effectively ended the practice of physical designation for thirty-one years. The repair is customarily credited to the Seals Recension, though the Sectorial Re-Concordance records a different clerk.

The Rival's objection

Rival Concordance was issued by a structure that has never been named Concordance Tower and has argued, in a memorial annexed to its own text, that the designation is meaningless without a fixed site. The Ninety-Eighth Concordance replied, briefly, that the objection was itself a Concordance and therefore could only have been issued from the Concordance Tower. The argument has satisfied no one and is reprinted in full in every Clerk's primer.

The Tower Hour difficulty

Because the designation may move, the question of which building's working cycle defines the Tower Hour required attention. The Ninth Concordance fixed the Tower Hour as one twenty-fourth part of a Tower working cycle but did not specify whose. In practice the issuing structure's cycle governs, which means the Tower Hour has changed length on every transfer, by amounts large enough to matter to bakers and small enough to be argued about by clerks. The Fifteenth Concordance and its companion recension disagree on whether this is a defect or the intended mechanism; the companion recension says only that the hour "follows the Tower, as is proper."

Symbols and use in citations

Documents issued from the Concordance Tower carry the aperture mark from the Concordance of Aperture Regulation in the upper corner of the first leaf. Citing the Tower itself, rather than a named Concordance, is permitted only when the citation is general; the Third Concordance, Annex VII and by extension Third Concordance require that any operative clause be cited by number. In practice, bewildered petitioners cite "the Concordance Tower" and are sent back to name the document, a procedure that has been tightened twice and remains the most frequent cause of complaint at the issuing desk.

The current holder of the designation is the structure on Floor 404, which resumed the office in the year following the settlement of the Concordance of Simultaneous Holdings, and which has not surrendered its seal. The Recension notes that the sweep outside the issuing room has not been logged since the changeover.

See also

Referenced by

Readers also asked

Concordance of Bounds: what does it set out?

The Concordance of Bounds is the forty-one-leaf instrument governing the demarcation of floors, aisles, spirals, and jurisdictions within The Tower, and the standing authority to which nearly all later bounding disputes …

Concordance of Bounds
Concordance of Aperture Regulation: what does it set out?

The Concordance of Aperture Regulation is the primary legal instrument governing Aperture Regulation within the Tower, a living document comprising over 700 clauses distributed across 12 primary annexes. It defines apert…

Concordance of Aperture Regulation
Concordance of Simultaneous Holdings: what does it set out?

Seventh Concordance, Annex 12: “A holding is not a thing; it is a space between designations, made durable by the act of its registration.”

Concordance of Simultaneous Holdings
Ninth Concordance: what does it set out?

The Ninth Concordance is the ninth of the thirteen principal legislative and administrative codes governing operations within the Tower. Ratified on 12 Nisan in the Year of the Ninth Librarian in the immediate aftermath …

Ninth Concordance

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.