The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Chapter 1 Designation Amp Registration

MS 1574.42 · Documents and ordinances

Chapter 1 Designation Amp Registration is the first recension of the registry protocols governing the naming of amp-bearing frames within the Tower, held in the Bureau of First Recensions on floor 214 and consulted, by custom rather than by requirement, before any designation of the first through fourth classes may be entered. It is not to be confused with Chapter 7, which asserts priority over all registrations of contingency, nor with Chapter 3, which governs receipt but not naming. The distinction has cost the Tower considerable correspondence.

The Chapter was promulgated under seal of the Librarians in the winter of 6 RC, four months after the aperture fires on Floor 88 displaced the standing registry. It has been amended eleven times and read, by the Bureau's own count, on forty-three occasions.

Scope and first-class designations

Chapter 1 establishes that a designation is not a description and may not be argued from resemblance. A frame is registered by the Chapter that first receives it, and the receiving Chapter's entry is thereafter controlling regardless of what the frame is later found to contain. The Office of Acquisitions Amp Stasis maintains that an Amp is defined by its registration and cites Chapter 1, clause 2 in support; the clause reads, in the recension of 19 RC:

"A designation once entered shall bind the object to the name and the name to the Chapter, and no subsequent inspection shall sever them."

— Chapter 1 Designation Amp Registration, clause 2 (recension of 19 RC)

First-class designations are reserved to the Electrics Amp Conduits Chapter as constituted under the Second Concordance, Annex 11, which charges that order with cataloguing, damping, and re-insulating conduits transmitting ordinance-derived current. The Chapter's scriptorium for the recension of flux boundaries, established under Title Vii Measurement Amp Demarcation, keeps the only complete register of first-class entries, and it has never permitted a copy to leave the room.

The matter of the marks on the casing

In 31 RC a frame recovered from the Edicts Amp Directives stairwell was found to carry four stamped marks, each a Class X Aperture Mark of the pattern normally reserved for conduits. The Materialist Chapter, which has never accepted the severance of the Electrics Amp Conduits Chapter and continues to certify its aperture seals, certified the marks as authentic. Archivist-Proctor Kael signed the certification under the Materialist Chapter's authority and noted in the margin that the marks were "worn in the manner of use, not of application" — a phrase that has been quoted in every subsequent dispute and explained in none of them.

The Electrics Amp Conduits Chapter disputed the classification, holding that marks of the Class X pattern encroach upon its enumeration of Primary Conduits, and that a frame bearing such marks is a conduit in law whatever it is in fact. The frame was accordingly designated Unspecified Amp Proto Conduits Class X and removed to floor 66, where it remains. Visitors may view it on the second and fourth Sixthdays; the viewing gallery is unheated and no more than six may enter at once.

Conflict with the Concordances

Scholarly disagreement turns on whether Chapter 1 controls at all. The Fourth Concordance, Annex 2, provides that "no designation of the first class shall stand which has not been entered twice," a requirement that the Chapter's own text does not mention. The Ninth Concordance, Annex 7, provides the contrary: that a single entry suffices where the registering Chapter is itself of the first order. The Bureau of First Recensions has declined to reconcile the two, observing in a note of 38 RC that "the Concordances are amended more often than they are read, and the Chapter is read more often than it is amended."

A second school, centred on the Office of Registral Precedent on floor 309, argues that Chapter 1 governs designations only and has no bearing on registration, which properly belongs to Chapter 7. This reading has the merit of internal consistency and the defect of leaving first-class frames unnamed for the whole of the autumn of 44 RC, during which interval three conduits were catalogued under the temporary style "pending," and one of them has kept the name.

Procedure and the Lammas correction

Entry proceeds in three stages: reception, in which the frame is logged and its Chapter determined; designation, in which the name is proposed and seconded; and sealing, in which the aperture seals are applied and the entry closed. In practice reception and designation are performed in the same sitting, and the Chapter has twice been amended to make this lawful rather than merely usual.

The Lammas Correction of 26 RC arose when a clerk of the Bureau, one Under-Clerk Vesh, designated a frame before sealing it, contrary to the order set out in clause 9. The frame was subsequently found to have been registered in two Chapters at once — a condition the Tower had until then regarded as impossible. Vesh argued that the fault lay with the Chapter, which he had read, rather than with himself, who had not. The Bureau ruled against him but amended the clause, and the amendment is now printed in the margin of every copy issued since, in smaller type than the text.

Physical condition of the register

The working register is a ledger of 1,140 leaves, bound in undyed board, kept in the Bureau of First Recensions and removed from it only with the countersignature of two Librarians. Its fourth quire suffered water damage in the winter of 52 RC when a pipe in the floor above failed; the affected entries were recopied by hand, and the recopied leaves are distinguished by a ruled border, though the rule is not explained in the prefatory matter and the prefatory matter is itself a recension.

Consultation is by appointment. Ink is not permitted in the reading room, and the Chapter may not be copied in part.

See also

Referenced by

Readers also asked

Chapter 3, "The Receiver Mandate": what does it set out?

Chapter 3, "The Receiver Mandate" is the third chapter of the Treatise on Reception, a doctrinal work of uncertain authorship in seven chapters, of which Chapters 1, 2, 4, 5 and 7 are either lost, embargoed, or — in the …

Chapter 3, "The Receiver Mandate"
Librarians: who are they?

The Librarians are the recognized custodial order of The Tower, vested by the Concordances with the exclusive authority and responsibility for the reception, indexing, and preservation of all holdings admitted to the arc…

Librarians
Electrics Amp Conduits Chapter: who are they?

Electrics Amp Conduits Chapter is a subordinate order of the Librarians charged with the cataloguing, damping, and periodic re-insulation of those conduits within the Tower that transmit ordinance-derived current under c…

Electrics Amp Conduits Chapter
Unspecified Amp Proto Conduits Class X: how is it conducted?

Unspecified Amp Proto Conduits Class X is the residual designation applied by the Electrics Amp Conduits Chapter to structural voids that transmit current, air, odour or unclassified influence and cannot be assigned to a…

Unspecified Amp Proto Conduits Class X

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.