The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Buffer Substrate

MS 7446.16 · Practices and doctrines

Buffer Substrate is the collective designation for any plate stock, flooring, or interleaving material whose declared purpose is to receive and hold what would otherwise pass through it. The term is administrative rather than material: no substance is a Buffer Substrate in itself, and the schedules of Buffer Protocols list at least forty-one stocks under that heading, including Archive-Grade Neutral Substrate, which qualifies despite possessing almost no capacity to buffer anything, on the grounds that it also does not conduct.

The distinction that matters in practice is between substrates that absorb and substrates that merely decline to transmit. Archive-Grade Buffer 7 belongs firmly to the first class; held in reserve at several Buffer Archives, it is specified in the material schedules of Buffer Protocols for its capacity to take up resonance and hold it below saturation for intervals measured in shifts rather than hours. The Neutral Substrate belongs to the second, and the two are frequently confused by parties who have read one schedule and cited the other. Procedural Substrate requires that no allocation of either proceed without a completed Substrate Assessment, a requirement introduced after the incident on Floor 612.

Floor 612 and the hall of neutral flooring

In the winter of the year recorded as 7 CC-114, a maintenance party relaid the western reading hall of Floor 612 entirely in Archive-Grade Neutral Substrate, having been issued a materials order that specified "buffer-class flooring, neutral grade." The order was internally consistent and had been countersigned without objection. The hall, however, sat directly above the crown of the Secondary Stair and had carried a residual load of approximately 340 units of unabsorbed narrative residue, most of it deposited during the previous decade by readers of the western chronicle shelves.

Within nine days the residue had passed through the new flooring, through the ceiling of the floor below, and into a sub-archive of Thematic Buffer holdings on Floor 616, where it was recorded as a false series of 214 folios concerning a parish that has no floor number. The folios were catalogued, cross-referenced, and bound before anyone established that no parish of that name exists in the Tower's registers. They remain bound. The Librarian Ostrevva Coll of the Floor 612 scriptorium entered a formal grievance against the issuing office, on the ground that a neutral stock had been ordered for a load-bearing site. Her grievance was upheld in part, and the hall was relaid in Buffer 7 at the expense of the office that had countersigned the order, whose seal was suspended for one quarter.

Layering and the rate of transmission

Buffer Substrate is almost never laid in a single course. The standard practice, described in the technical annex to Buffer Protocols, is a three-course section: a bearing course of Neutral Substrate, a buffer course of Buffer 7 or an equivalent, and a facing course whose composition is left to the office responsible for the floor. The annex does not specify the thickness of any course, on the reasoning — stated in its preamble — that a floor's load is known only to the floor.

Where the buffer course is omitted, the substrate is said to be unrelieved, and unrelieved sections are monitored under Buffer Saturation rather than under Buffer Zone Integrity. This division of oversight has never been explained in writing. The Office of Substrate Integrity has twice requested a ruling on the boundary and has twice been referred to Buffer Protocols, Annex 9, which concerns the interval of The Twilight Buffer and says nothing whatever about flooring.

Contested classifications

Two schools dispute the classification of Buffer Substrate to the present day. The material school, strongest in the Buffer Archives, holds that a substrate is a buffer only insofar as it has been certified as one, and points to the Substrate Certification register, in which every accepted stock carries a number and a date. On this account there are forty-one Buffer Substrates, and no others.

The performance school, associated with the readers of Recursive Buffer Zone and its plural counterpart Recursive Buffer Zones, holds that certification records a decision and not a property, and that any material which in fact buffers is a Buffer Substrate from the hour it begins to do so, certified or not. The performance school cites the Floor 616 folios as evidence: the Neutral Substrate of Floor 612 buffered nothing, while the plaster of the Floor 616 ceiling buffered a great deal and appears on no schedule at all.

"The register is a record of what we have agreed to call a thing. It is not a record of what the thing does. I have never understood the confusion, and I have stopped expecting it to be resolved."

— Ostrevva Coll, marginal note to the Floor 612 grievance file

No Concordance has settled the question. Third Concordance treats the word substrate only in connection with burial, and Fifth Concordance, which is otherwise silent on materials, refers all questions of buffering to the Protocols in a clause that the Protocols do not acknowledge.

Exclusions and monitoring

Certain substrates are expressly excluded from the buffer schedules. The Hepatic Buffer is the standing example: the Buffer Protocols do not classify it, and repeated attempts to enter it in the register have been returned unaltered with no accompanying note. Primary Inertial Buffer occupies a similar position by a different route, having been classified once, in error, and then reclassified in a document that has since been mislaid.

Buffer Substrate in place is monitored rather than inspected. Sections are assessed annually under Buffer Zone Integrity where they lie within a Material Buffer Zone, and continuously under Buffer Saturation where they do not. Buffer Sigma-7 was monitored under neither arrangement, a lapse examined at length in the record of Floor 909 and not repeated.

Substrate removed from a floor and stored is no longer a Buffer Substrate for the purposes of monitoring, but remains one for the purposes of the register until the removal is entered. Floors undergoing relaying are therefore recorded twice, once as buffered and once as unbuffered, and the discrepancy is reconciled at the close of the year. Where it is not reconciled, the floor is entered as of uncertain substrate and may not be used for readings until the entry is corrected. The average wait is eleven months.

See also

Referenced by

Readers also asked

Thematic Buffer: how is it conducted?

The Thematic Buffer is any procedural, architectural, or material construct authorized under Clause 44 to create conceptual separation between non-material subjects within the Tower’s archival holdings. The necessity for…

Thematic Buffer
Recursive Buffer Zone: how is it conducted?
Recursive Buffer Zones: how is it conducted?

Recursive Buffer Zones are formally designated interstitial spaces between discrete conceptual strata within the Tower, established to manage and contain the effects of semantic recursion and prevent conceptual contamina…

Recursive Buffer Zones
Fifth Concordance: what does it set out?

The Fifth Concordance is the first major procedural concordance to survive in its entirety, ratified in Year 47 of the Second Librarianate. It is primarily concerned with establishing protocols for the measurement, docum…

Fifth Concordance

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.