The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Budgeted Ambiguity

MS 1440.93 · Practices and doctrines

Budgeted Ambiguity is the formal designation for ambiguity that has been costed, assigned a funding line, and carried forward across fiscal periods without ever being resolved, annexed, or otherwise brought to a determination. It is distinguished from the ambiguity catalogued under Cataloguing Ambiguity in that it need not be described, only estimated; and from Persistent Ambiguity Fields in that a Field may persist indefinitely without anyone having agreed what it is worth. Budgeted Ambiguity exists chiefly so that the Registry of Unconfirmed Spaces can be reconciled at year's end. It is recorded under the standing rubric of the Supplemental Ledger of Perpetual Ambiguity, Sub-Schedule 9 ("Provisional and Carried-Forward Items"), though its entries are conventionally filed facing outward, so that the rubric does not appear to touch them.

Definition and measurement

The term was fixed by Fourth Concordance, Annex 2, which defines Budgeted Ambiguity as "ambiguity for which a sum has been named, whether or not the sum is available, and whether or not the ambiguity is." The definition has the rare merit of being shorter than its commentary.

Magnitudes are expressed in Standard Ambiguity Units (SAU) and read against the Protocol for Weighing Ambiguity, but with a characteristic divergence: where ordinary readings are taken on the Ambiguity Balance, Budgeted Ambiguity is read on a balance of account, and the two are not permitted to be compared directly. Chamber of Deliberate Ambiguity, Minute 1,188 records the reason plainly: "A balance of account cannot be zeroed, and a zeroed balance cannot be funded." Clerks who have attempted the comparison are asked to sign the reverse of the reading slip and to remain in the room until collected.

In practice the unit most often encountered is the provisional SAU, a figure entered in pencil, initialled, and never converted. The conversion rate to firm SAU has been under review since the Great Ambiguity Incursion and is not expected before the next recension.

History of the schedule

Budgeted Ambiguity was not invented; it accumulated. The earliest recorded instance appears in the quartermaster's returns for the winter of the year the Calcified Wing was extended, when a line item headed "space asserted but not surveyed" was carried for eleven consecutive quarters without expenditure and without objection. The Office of the Provost of Precise Ambiguity later cited this as precedent, noting that the item had never been queried, which the Office took as evidence of sound accounting rather than of neglect.

The practice acquired a name, and then a schedule, and then a sub-schedule. By the time Precedent Curation and Ambiguity was compiled, the schedule ran to forty-one pages, of which nine concern the treatment of items that were budgeted for and then found not to exist — a category the compilers treated at length, since it had proved impossible to close.

The Halversen variance

A persistent difficulty is that a budgeted figure tends to become the ambiguity it was meant to cover. The case usually cited is the Halversen variance of the year the lower galleries were renumbered, in which a corridor budgeted at 340 provisional SAU was subsequently found to be 340 provisional SAU ambiguous and no more; the sum had not described the corridor, it had constituted it. The corridor is now entered twice in the Registry of Unconfirmed Spaces, once as a space and once as a sum, and the two entries are not permitted to meet.

"Where a figure has been entered in good faith against an unconfirmed space, the figure is to be preferred to the space. The reverse has never been tested and is not to be tested."

— Seventh Concordance, Annex 11, clause 4

Scholarly disagreement

The Index of Ambiguity holds that Budgeted Ambiguity is a species of Calcified Ambiguity that has not yet set, and asserts administrative precedence over all carried-forward items on that ground. The Radical Ambiguity School rejects the claim outright, arguing that nothing budgeted can be calcified, since a budget implies a future in which the item might be spent, and a Calcified Echo has no future by definition.

The Chamber of Deliberate Ambiguity has declined to resolve the question, observing in Minute 1,204 that both positions are admissible and that resolving them would cost more than the schedule is worth. The Provost of Precise Ambiguity has assessed the Chamber's minute for distance from the Zero Ambiguity baseline and found it, in the Provost's phrase, "comfortably far." The matter is therefore open, funded, and expected to remain so.

Current standing

Budgeted Ambiguity is carried at present under three heads, which are not to be confused with one another and are frequently confused:

  • the standing provision, renewed each period without review;
  • the carried-forward balance, which is never reduced and is read aloud at the start of each session;
  • and the unallocated residue, which has no line and is therefore the largest.

The Society for the Preservation of Ambiguity has petitioned for the residue to be itemised. The petition is under consideration and has itself been budgeted. Clerks are reminded that figures entered in pencil may not be erased during the reading, and that the pencil is supplied at the desk.

See also

Referenced by

Readers also asked

Protocol for Weighing Ambiguity: how is it conducted?

Protocol for Weighing Ambiguity is the standard instrument procedure by which an ambiguous clause, entry, or object is assigned a Magnitude of Ambiguity expressed in Standard Ambiguity Units (SAU). The Protocol was issue…

Protocol for Weighing Ambiguity
Great Ambiguity Incursion: what happened?

The Great Ambiguity Incursion (Catalog Years 8,741–8,743) was a seventeen-month period during which a rising class of unreconciled meanings, having accumulated in the upper stacks without resolution, breached the ordinar…

Great Ambiguity Incursion
Registry of Unconfirmed Spaces: what does it set out?

The Registry of Unconfirmed Spaces is the subordinate ledger maintained under the authority of Registry Theta-7 for the recording of spaces whose existence has been asserted, surveyed, or budgeted for, but not yet annexe…

Registry of Unconfirmed Spaces
Provost of Precise Ambiguity: who are they?

Provost of Precise Ambiguity is a ceremonial and administrative office within the Tower, charged with the oversight of the Provost’s Ascent and the annual execution of the Ceremony of the Assumed Integer. The office is c…

Provost of Precise Ambiguity

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.