Auditory Taxation
MS 3102.31 · Practices and doctrines
Definition and scope
Auditory Taxation is the levy imposed upon sound in passage, assessed by the Spire of Auditory Phantoms and collected under the general authority of the Resonance Taxation Schedule. It is distinct from resonance taxation in that it attaches to the sound itself rather than to the goods producing it, and from the levies administered by the Auditory Permit Office in that it is assessed after the fact rather than granted beforehand. The practice is understood to be coextensive with the Auditory Phase, though the Grand Ledger of Auditory Potential records collections from periods preceding the current phase by a considerable margin.
The taxable unit is the audible event. Silence, however prolonged, is not assessable; nor is sound produced entirely within the body of the listener, a distinction settled by Concordance 47 and reaffirmed after the incident on Floor 347 discussed below.
Assessment
Assessment proceeds by Auditory Confirmation, which establishes that a sound occurred, followed by a reading of its magnitude against the tables in the Manual of Auditory Demarcation. The Spire maintains that magnitude alone is insufficient, and that duration, source count, and the presence or absence of an intended hearer must all be recorded. This position has produced a considerable secondary literature, most of it authored by the Spire itself.
Sounds originating from goods in transit are assessed twice: once under Volumetric Assessment as attributable to the object's spatial extent, and once under Auditory Taxation as an event in its own right. The Fifth Prefecture has twice objected to this on the grounds that it double-counts the same energy, and twice been overruled by reference to Ordinance 88124, whose provisions on provisional classifications the Spire reads as broadly applicable. The Fifth Prefecture reads them narrowly. The dispute is recorded, unresolved, in Annex 11 of the Grand Ledger of Auditory Potential.
Exemptions
Three exemptions are in force. Sound generated in the course of an official Auditory Confirmation is exempt, as is sound produced within a designated Vestibule of Auditory Phantoms where the standing exemption has been renewed annually since the Floor 212 ruling. The third exemption, for sounds of which the hearer was demonstrably unaware, is contested; the Spire holds it void under Concordance 47 while the Office of Auditory Consistency continues to honour it, and has honoured it fourteen times since 1946.
A fourth exemption was proposed in 1958 covering the sound of falling objects. It was rejected on the grounds that falling objects are already assessed under Volumetric Assessment and that the proposal came from the Salt Guild, which has no standing in auditory matters.
Collection and dispute
Assessments are entered in the Grand Ledger of Auditory Potential and appealed to the Auditory Permit Office, which forwards them, unaltered and unaddressed, to the Spire. The Spire maintains that the Office's forwarding constitutes a ruling. The Office maintains that it is merely administrative. Roughly one appeal in six is therefore considered closed by one party and open by the other indefinitely, a condition the Spire describes as "quietly settled" in its annual return.
The best-documented dispute concerns Clerk Dorrit Aldane, who in the winter of 1943 assessed a single sustained tone on Floor 347 at eleven hundred separate taxable events on the basis that the tone was heard eleven hundred times by eleven hundred clerks. The Spire reversed the assessment, holding that the event was one and the hearers merely instances. Aldane's rejoinder, appended to the Ledger as Annex 7, argues that eleven hundred confirmations cannot be one confirmation, and concludes: "A bell rung in an empty corridor and a bell rung in a full one are not the same bell, and the Ledger knows this." Annex 7 has been cited in support of both sides of the question since.
The Floor 347 incident
On 9 January 1971, the winter heating on Floor 347 failed, and the resulting contraction of the corridor produced a sound lasting four hours and twenty minutes. Assessment yielded a figure so large that the Spire declined to enter it, on the grounds that a single event of that duration approached the definitional limit of the Auditory Phase itself. The Office of Auditory Consistency entered it anyway, at half value, under the disputed third exemption. The entry remains in the Ledger, annotated "contested since entry." Floor 347 has since been heated to a constant nineteen degrees.
Scholars of the Tower disagree, and have long disagreed, on whether Auditory Taxation is a tax on sound or a tax on hearing. The Spire's official position, stated in the Manual of Auditory Demarcation, is that hearing is merely the mechanism by which sound is rendered taxable. The opposing view, associated with the Salt Guild and never formally adopted, holds that the Tower cannot tax what no one perceives, and that a sound unheard is legally indistinguishable from silence. Under this reading the entire schedule is a tax on listeners, which would make the Spire, and not the Fifth Prefecture, the authority taxing persons rather than phenomena. Both readings are supported by Concordance 47. Neither has been preferred.
See also
-
MS 8215.04
Cognitive Load Tax
The Cognitive Load Tax is a levy assessed on the sustained reasoning effort conducted within a floor, corridor, or enclosed shaft,…
-
MS 2700.95
The Spire of Auditory Phantoms
The Spire of Auditory Phantoms is a non-designated vertical annex of Foundational Spire 12-Kappa, located on Floor 9001. Its prima…
-
MS 9757.55
Auditory Resonance Drill
Auditory Resonance Drill is a standardized emergency procedure codified under Eighty-Ninth Concordance Annex 4-D, designed to iden…
-
MS 9051.28
Seventeenth Concordance, Clause 17.404.1a
The clause was appended to the Seventeenth Concordance during the final reviews of the Seventeenth Amendment, ostensibly to resolv…
-
MS 4586.13
The Vestibule of Auditory Phantoms
Architecturally, the Vestibule is defined by its "arrested sonic field," a condition maintained by a lattice of baffles constructe…
-
MS 4148.74
Resident Phantoms
Resident Phantoms are those phantasmal entities whose manifestation is bound to a fixed address within the Tower rather than to a …
Referenced by
- MS 4045.86 Auditory Permitting
- MS 1602.45 Auditory Binaurals
Readers also asked
Grand Ledger of Auditory Potential: what does it set out?
The Grand Ledger of Auditory Potential (GLAP, Tower Designation: Ledger-413-α) is the canonical and exhaustive register of all phenomena whose existence is contingent upon or validated by the principle of Auditory Confir…
Grand Ledger of Auditory PotentialManual of Auditory Demarcation: what does it set out?
The Manual of Auditory Demarcation is the foundational instrument of the Tower's auditory governance, authored by High Librarian Valerius and first registered in the Fourth Recension of the Manual of Boundary Integrity. …
Manual of Auditory DemarcationAuditory Permit Office: who are they?
The Auditory Permit Office (APO) is the administrative body, operating under the auspices of the Spire of Auditory Phantoms, responsible for the initial classification, triage, and permitting of intentional and potential…
Auditory Permit OfficeSpire of Auditory Phantoms: where is it?
The Spire of Auditory Phantoms is a non-designated vertical annex of Foundational Spire 12-Kappa on Floor 9001, catalogued under the administrative jurisdiction of the Silent Choirs. It is the primary repository for unre…
Spire of Auditory PhantomsReaders who consulted this also failed to find
- MS 1233.09 Resonance Taxation Schedule
- MS 1921.43 Concordance 47 (Auditory Proscripts)
- MS 4767.32 Dorrit Aldane
Because you consulted