Annex 7b
MS 9108.23 · Places and structures
Annex 7b (written in the registers without a hyphen, though the Office of Designation has twice recommended regularising it to 7-B) is a service annex occupying the eastern half of the seventh landing of the Lateral Annex 7 stack. It is chiefly known as the seat of the Annex Steward for Annex 7-C, who is formally responsible for it under the terms of Clause 4, Annex C. The annex comprises four receiving rooms, a lobby of no fixed dimensions, and a stair well whose lower flight terminates at a landing that has not been surveyed since the winter of the Third Recension (year 4,112 by the Librarians' count).
Its hyphenation is a matter of some feeling. Second Concordance, Annex D renders the designation as 7-B throughout, in thirty-one places; Seventh Concordance, Annex Q renders it as 7b, in a single place, and in every other place declines to name it at all. The Clerks' Collation Office adopted the un-hyphenated form in year 4,207 on the grounds that it matched the door plate, and the plate has not been replaced.
Position and access
Annex 7b is reached through the Staging Annex, which provides access to Annex V and, by a corridor laid in year 4,044, to the annex's lobby. The route is passable in one direction only between the sixth and ninth hour, on the authority of a standing order of the Lateral Annex 7 Stewardship, renewed each quarter-return without debate. A hand-lettered notice in the lobby, of uncertain date, reads: "Returning parties will wait until the ninth hour. Do not knock."
The annex has never appeared on a publicly posted floor plan. Visitors are advised in the lobby that this is intentional. The Licensing Board of the Lateral Annexes has ruled twice (4,318 and 4,361) that this does not constitute a defect, because the annex is not a public way.
Administration
Administration of Annex 7b is not vested in its own office but delegated, and the delegation is where most of the difficulty has arisen. The Annex Steward for Annex 7-C formally oversees Annex 7b, a mandate delegated from the Annex Steward body for Annex 7-γ. The same steward holds operational custodial responsibility for Annex 4, Annex Ξ, and Annex Gamma7, and administrative responsibility for Annex 37-Ω and the Immovable Annex. It has been the position of the auditors of the Ninth Ledger Room that no single steward can hold six such charges with due care, and their report of year 4,389 recommended that oversight of 7b be severed and vested in a separate office.
The recommendation was accepted, minuted, and then suspended pending clarification of whether a severed office would still be an Annex Steward office, which would require a fresh delegation from Annexe 7-γ, which in turn would need the consent of the steward it was intended to relieve. No further record of the suspension exists.
"The Custodian of 7b shall hold the keys of 7c as if they were 7b's own, and shall not, on any account, admit a party bearing no seal."
— Second Concordance, Annex D, clause 14
The matter of the keys
The clause above is the origin of the annex's most persistent irritant. The keys to Annex 7-C are hung in 7b's lobby, behind a grille, while the steward who must sign them out is ordinarily to be found in 7-C. In practice the keys are fetched by the junior porter and signed for at the end of the day, an arrangement the Registry of Seals and Keys has never authorised and has three times condemned, most recently in year 4,402: "the practice is universally followed, which is not an answer." No alternative arrangement has been proposed that any porter will agree to, and the grille has stood open since 4,397.
A deputy's ticket, dated 4,455 and found pasted into the lobby register, records the following inventory of the annex as it stood at the close of that year:
- four receiving rooms, of which one is entered from 7-C and two are entered from each other;
- one lobby, 11 paces by 9, with a bench;
- thirty-one keys behind the grille, of which twenty-eight correspond to doors presently known;
- one hand-bell, rung for the ninth hour;
- one locked cupboard, marked 7b, whose contents are entered in a register kept inside the cupboard.
Disputes of record
The principal scholarly disagreement concerns whether Annex 7b is the parent or the child of its own designation. The Historical Annexes Seminar holds, on the strength of the door plate and the 4,207 collation, that 7b is an original holding of the Lateral Annex 7 stack, and that Annex 7-C was cut from it in year 3,988 — a view supported by the fact that 7-C's eastern wall is thinner than its other three. The opposing school, associated with the late Librarian of the Seventh Landing and continued by her amanuensis, maintains that 7b was a vestibule of 7-C elevated to annex status for reasons now lost, and points to the delegation from Annex 7-γ, which names 7-C first and 7b second, "as is customary where the second is the lesser."
The Concordance of Floor Names, Third Issue declines to resolve the matter, noting only that "7b and 7c are mutually situated" — a formula which the Office of Designation has since admitted was drafted to end the argument and has instead furnished both sides with a citation.
Later history
In year 4,441 a party of four surveyors descending the annex's stair well returned after nine days with a list of forty-one doors and no conclusion, and were refused a second commission on the ground that they had lost the bell. The stair well has since been measured at the top only.
Annex 7b does not appear in the schedules of Annex Ω.1 or of Annnex Theta-45, which the Registry of Seals and Keys has noted without comment in each of the last eleven years. It is not proposed to correct the omission.
See also
-
MS 3979.89
UnboundĠStacks
"Where the designation is written with the accretion, the accretion shall be read as part of the designation; where it is written …
-
MS 6794.46
The Silent Bourse
The Silent Bourse is the formal designation for Floor 188 of the Tower and, by extension, for the exchange mechanism housed there.…
-
MS 3149.44
Maintenance Shaft
Maintenance Shaft is the generic designation applied by the Office of Shaft Registers to any vertical service conduit of secondary…
-
MS 4502.39
Grey Stacks
The Grey Stacks is the collective designation for a run of forty-one shelf tiers occupying the western half of Floor 1188 (the Num…
-
MS 0838.35
Clerk-Archivist Tem
Clerk-Archivist Tem is a designation of the grade immediately below Archivist Second-Class in the Tower's cataloguing service, hel…
-
MS 0281.52
The Silent Aviary
The Silent Aviary is the common designation for an unnumbered gallery situated between Floor 617 and Floor 618, occupying the serv…
Referenced by
- MS 5340.03 Office of Definitive Measures
- MS 8657.02 The Chamber of Silent Measures
- MS 6941.62 Annex 7C
- MS 1520.05 Office of Designation
- MS 1292.67 Annex Σ-4
- MS 2974.33 Annex Steward for Annex 7-C
- MS 0939.28 Clerks' Collation Office
- MS 1882.69 Concordance of Annex Registers
- MS 1980.46 Annex 9
Readers also asked
Annex 37-Ω: where is it?
Annex 37-Ω is a volumetric annex located in the lower mid-spire of the Tower, designated for the cataloging and regulatory containment of ambient silence. Unlike conventional Annex spaces which store physical or document…
Annex 37-ΩThird Recension: how is it conducted?
Third Recension is the designation given to the second great revision of the Tower's documentary corpus, and to the historical period of that revision's administration. Its boundaries are fixed by the closure of the Seco…
Third RecensionAnnex: how is it conducted?
Annex is, within the archival schema of The Tower, the foundational unit for the categorization and physical containment of unreal subject matter. An Annex is defined by the Seventh Concordance as "a discrete administrat…
AnnexAnnex 7-γ: where is it?
Annex 7-γ is a small, persistent annex located on the 170th-floor mezzanine, formally designated for the cataloguing of imminent oversights. It is administrated by the Annex Steward assigned to Annex 7-C as a secondary h…
Annex 7-γPassages cited from this record
-
The Custodian of 7b shall hold the keys of 7c as if they were 7b's own, and shall not, on any account, admit a party bearing no seal.
Second Concordance, Annex D, clause 14
Readers who consulted this also failed to find
- MS 1173.78 Registry of Seals and Keys
- MS 8191.50 Historical Annexes Seminar
- MS 3847.62 Lateral Annex 7 Stewardship
- MS 9523.25 Concordance of Floor Names, Third Issue
Because you consulted