The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Type a Allocated Junctures

MS 2001.20 · Practices and doctrines

Definition and scope

Type-A (Allocated) Junctures are those Buttress Junctures at which the buttress material is fully manifested and its support is quantifiable in standard Density Units. They constitute the largest single classification recorded in the Chronology of Contested Junctures, accounting for 61 percent of entries between Year 301 and Year 388, a proportion that has declined steadily since the promulgation of the Fourth Concordance and its narrower reading of "fully."

The classification rests on two conditions, both of which must be satisfied and neither of which is defined in the same terms twice. The first is manifest presence: the buttress must be present at the juncture at the moment of survey. The second is measurability: a Density Unit reading must be obtainable and stable to within 0.4 DU over one Tower Standard Hour. A juncture meeting the first condition but failing the second is recorded as a Type-R and referred to the Office of New Supports. A juncture meeting neither is presumed absent unless a prospective buttress files otherwise, in which case it becomes a Type-H and passes to the Committee for Ontological Review.

Survey procedure

Allocation surveys are conducted by visiting the juncture with a calibrated gauge and remaining present for the full hour of stability. This is the procedure as written. In practice the visiting party rarely remains for the full hour, and the recorded figure is frequently the reading taken at the moment of arrival, annotated afterwards with whatever adjustment the senior surveyor considers defensible.

The gauge itself is an object of long contention. The Type-3 Entropic Potential Gauge, standard issue since Year 341, is calibrated against a reference mass held on Floor 1206, which the Office of New Supports has been unable to relocate since Year 377. Readings taken in the intervening period are therefore certified as accurate to 0.4 DU against a value no one currently in post has verified. The Office has responded to two separate challenges to this arrangement by issuing identical letters stating that the reference mass "remains where it was placed," which is technically unhelpful.

Contested boundaries with adjacent types

The boundary between Type-A and Type-R has produced more litigation than any other classification line. The difficulty is decay: a buttress that reads 12.6 DU at arrival may read 11.9 at the second hour and 9.4 at the fourth. When does allocation end and remnance begin? The Third Concordance proposed a fixed floor of 8.0 DU. The Fourth Concordance repealed it and substituted a rate-of-decay test. The Fifth Concordance restored the fixed floor at 7.5 DU and simultaneously authorized the rate-of-decay test in an annex whose applicability has never been settled.

"A juncture is allocated on Tuesday and remnant on Thursday, and the buttress has not moved. The buttress is not the thing that changed."

— Supervisor Halvern, memorandum to the Office of New Supports, Year 379

A parallel dispute concerns Type-A Drift, in which a juncture originally surveyed as Type-A migrates measurably relative to its anchor points over a period of years. Drift does not change the classification; it changes the location. Since the Buttress Junctures are warp-strung and anchored at the selvedge, a drift of even a few spans obliges the fabric to be restrung or the survey to be reissued. Both have happened. Neither has been popular.

There is also the question of partially allocated junctures — those where one flank of the buttress reads cleanly and the other does not. The Committee for Ontological Review has twice declined to rule, on the grounds that a partial allocation is neither Type-A nor Type-R and that creating a new Type to accommodate it would require amending the Staircase Survey, which currently assigns no landing to the matter.

Relation to fiscal assessment

Support quantified at a Type-A juncture is assessed in SFU-A, defined as one SFU-1 maintained for one Tower Standard Year, with coefficients allocated within the temporal framework of the Tower Financial Cycle. Because the DU reading determines the SFU-A coefficient, and because the DU reading is taken once per survey, a buttress that decays between surveys continues to generate fiscal returns at its arrival value until the next cycle.

The Office of New Supports regards this as a clerical convenience. The Office of Fiscal Concordance regards it as an error of 4,100 SFU-A annually and has requested a mid-cycle resurvey every year since Year 362. Its requests are logged.

Notable instances

The most frequently cited Type-A juncture is the one recorded at Floor 9873, where the Staircase Survey allocated a landing specifically to permit gauge access. The landing has since been found to serve a different stair, and the gauge must now be lowered on a line from the adjacent floor — an arrangement the Office of New Supports describes as "working as intended" and every surveying party since Year 369 has described otherwise.

Second in citation is the juncture on Floor 317, the subject of the Contested Chronology entered in Year 394, where the buttress was found to be allocated to two floors simultaneously. The dispute was resolved by assigning the buttress to Floor 317 and the support to Floor 316, a division that satisfies no one and has not been reopened.

Cross-references

See also Type-B, Type 1, Type II lumen-sconce, Type Γ: Referential Anomaly, Paradox Contamination Type Vii C Practice, and the standing annotation attached to Buttress Sigils concerning sigils struck at allocated rather than manifested junctures.

See also

Referenced by

Readers also asked

SFU-A (Allocated): how is it conducted?

SFU-A (Allocated) is a theoretical unit of account within the administrative schemata of The Tower, representing the total resource expenditure required to sustain one SFU-1 for one Tower Standard Year. It is an abstract…

SFU-A (Allocated)
Type Γ: Referential Anomaly: how is it conducted?
Type II lumen-sconce: what is it for?
Fourth Concordance: what does it set out?

The Fourth Concordance is a foundational Tower document, now extant only in fragmentary quotations and secondary references. Its authority was formally superseded by the ratification of the Fifth Concordance, which was d…

Fourth Concordance

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.