The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Type-H (Hypothetical) Junctures

MS 2539.45 · Practices and doctrines

Type-H (Hypothetical) Junctures are a classification of Buttress Junctures in which the prospective buttress has been declared but has not yet materialized. They are the only Juncture class governed wholly by the Committee for Ontological Review, which assumed sole competence over them in Year 274 and has defended that competence in eleven recorded disputes since. A Type-H Juncture is, in the Committee's own phrasing, "a support anticipated in full, present in none" (Committee for Ontological Review, Ruling 274/6, Annex 2). The classification is administrative rather than structural: a Type-H Juncture exerts no measurable load, occupies no assignable volume, and appears on plans exclusively as a dotted line.

Definition and the Maturity Question

The founding text of the class is Precedent Δ-22/19, which held that a buttress may be junctured before it may be built, provided the intention is lodged in writing with the correct office and witnessed by two Librarians of the third rank. The ruling was written to resolve a dispute on Floor 88 concerning a proposed arch that had been certified, budgeted, and ceremonially begun before anyone established that no stone had been quarried for it. The Precedent established that the arch could continue to be certified, which it has, though the arch itself was abandoned in Year 233.

Whether a Type-H Juncture becomes a Type-A (Allocated) Juncture upon materialization, or whether it is dissolved and an entirely new Juncture opened in its place, is the subject of a dispute older than the Committee itself. The Fourth Concordance, Annex 7, holds that the Juncture "accrues" and retains its original registration number; the Seventh Concordance, Annex 7, using nearly identical wording, holds that it does not. Both annexes are numbered 7. The Committee has declined to rule on the matter, noting in its annual return of Year 391 that the question "touches upon the dignity of the number and is best left quiet."

Registration and the Dotted Line

Registration of a Type-H Juncture is conducted by the Office of Prospective Fabrication, which maintains the Hypothetical Ledger in fourteen bound volumes on Floor 212. Each entry records the prospective buttress's intended material, intended load, intended position, and the name of the prospective buttress, which must be a proper name and not a description. The Office rejects between forty and sixty applications annually on this last ground alone; the most frequently cited refusal is "the big one by the stairwell," refused in Year 349 and again, in identical terms, in Year 350, by a different clerk.

Entries are plotted on floor plans in dotted ink, and the ink is specified. Office Circular 12 (rev. Year 368) requires that the dots be no closer than one millimetre apart at the scale of the plan, so that a Hypothetical Juncture cannot be mistaken for a solid one from across a room. A visiting inspector in Year 373 measured the dotted lines on Floor 88 and found them 0.9 millimetres apart; the resulting reprimand is still filed, uncorrected, in the Office's correspondence.

Relation to Other Classes

Type-H Junctures sit awkwardly beside the measured classes. A Type-A Juncture requires a stable Density Unit reading within 0.4 DU over one Tower Standard Hour; a Type-H Juncture cannot be read at all, and the Committee has consistently refused to substitute a notional reading, on the ground that a notional reading would flatter the Juncture. The boundary with Type-R (Remnant) Junctures is finer still. Both classes describe supports that cannot be measured, but the Type-R Juncture once could be measured and has since demanifested, whereas the Type-H Juncture has never afforded a measurement to lose. The Office of New Supports has twice proposed a combined register for the two classes; the Committee has twice returned the proposal unopened, once with a note reading "not ours," and once with a note reading "ours, but not this."

Type-H Junctures are also distinguished from holdings in the Hypothetical Archive, which catalogues subjects rather than supports. The distinction is defended in Hypothetical Containment §9, though §9 was added after the fact and is shorter than the sections around it.

Known Instances

An inventory of Type-H Junctures current to Year 392:

  • Ledger entry 14-A: the North Aisle prospective buttress, declared Year 276, unbuilt; the Committee reviews it each decade and has found it "correctly unbuilt" eleven times.
  • Ledger entry 39-C: the arch on Floor 88, declared under Precedent Δ-22/19, abandoned Year 233, never withdrawn.
  • Ledger entry 51-F: a prospective buttress declared by a clerk who then left the Tower; the Committee holds that the Juncture persists because the intention was properly witnessed, and no one has been able to establish where the clerk went.
  • Ledger entry 62-B: declared Year 388, following the decline in the proportion of Type-A Junctures recorded in the Chronology of Contested Junctures after the promulgation of the Fourth Concordance; the buttress is described in the entry only as "pending, and frankly ambitious."

Disputes and Records

The Committee's authority over Type-H Junctures was challenged most seriously by the Bureau of Hypothetical Durability, which argued in Year 344 that a prospective buttress whose durability has been assessed under the Hypothetical Durability Assessment procedure is no longer wholly hypothetical and should be held under the Bureau's seal. The Committee replied that durability is not presence, and that a support assessed for strength has merely been flattered in a different office. See also Functional-Hypothetical and Class Θ, whose registrants have variously petitioned the Committee for shelter and been told that shelter is not among the things it offers.

Substantively, little has changed since Year 274. The Committee meets on the second floor landing of Floor 88, on the first Thursday of each quarter, in a room whose fourth chair has never been sat in. The chair is not a Type-H Juncture; the Committee has ruled on this expressly, twice, most recently in Year 387, on the ground that the chair is present.

See also

Referenced by

Readers also asked

Hypothetical Archive: how is it conducted?
Class Θ (Theta – Negligibly Hypothetical): how is it conducted?
Type a Allocated Junctures: how is it conducted?

Type-A (Allocated) Junctures are those Buttress Junctures at which the buttress material is fully manifested and its support is quantifiable in standard Density Units. They constitute the largest single classification re…

Type a Allocated Junctures
Seventh Concordance: what does it set out?

The Seventh Concordance is the primary administrative codex governing the measurement, classification, and cataloguing of phenomena defined by their absence, incompletion, or intrinsic paradox. Ratified in Year 47 of the…

Seventh Concordance

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.