The Load-Bearing Charter of Spire 404
MS 4324.88 · Documents and ordinances
The Load-Bearing Charter of Spire 404 is the instrument by which the founding exemptions and structural peculiarities of Spire 404 were fixed in writing and entered into the general register. Granted in the winter of the year recorded as 1043 by the Librarian-Charterist Venosettle Marrow upon the perpetual stair, the Charter is not a permit, a plan, or a survey. It is a concession: a numbered floor which, by its own written terms, agrees to bear load, and a document which agrees to record that it has.
Copies are held in the Western Spire under seal, at the Office of the Twenty-Third Spire, and in the reading room of Spire 404 itself, where the working copy is chained. The chained copy is the only one permitted to circulate at floor level.
Origin and the Marrow Recension
Spire 404 was raised during the winter of 1043 against objections from the Department of Structural Verifications, which held that the floor could not lawfully be loaded until its Load-Bearing Nodes had been formally documented. The objection was never withdrawn. The Charter was issued over it, and the eighth clause records the objection verbatim so that it might "stand against the instrument forever, as a nail stands against a wall" (Load-Bearing Charter of Spire 404, cl. VIII). The Department has since taken the position that the clause constitutes a finding in its favour rather than a note of dissent.
The instrument was recensioned three times. The Marrow Recension of 1043 is authoritative; the Second Recension of 1107 added the schedules of exemption; the Third Recension of 1389 corrected a numeral and was thereafter mistaken by several offices for the whole Charter, a confusion that persists in some catalogues. Clerks are reminded that the third recension is nine lines long.
The numbering exemption
To be chartered, an instrument required a sequential floor, a name, and a sponsor from the Order of the Load-Bearing Word. Spire 404 possessed none of these in a form the registrars could accept, and the Charter was drafted chiefly to remedy this. It grants what is called the numbering exemption: the floor's designation is recognized as a name in its own right, and no additional name is required.
Clause II is equally careful about what the exemption does not do.
"The floor shall be known as 404 and by no other name, and this naming shall not be construed as a number, nor as a sequence, nor as a claim upon any neighbour."
— Load-Bearing Charter of Spire 404, cl. II
Practically, this has meant that every attempt to restore Spire 404 to a sequence has failed at the first clause. The Committee on Sequence Repair has proposed eleven such restorations since 1181; the eleventh, in 1602, was rejected because the Committee's own draft named the floor "404 (Provisional)."
Obligations of the floor and its substantiating body
The Charter's better-known provisions concern what 404 owes the Tower in exchange for the recognition it has been given. The floor is required to render itself available for Conceptual Load Testing at intervals stated in the Charter as "not less than once in the turning of a year, nor more than once in the turning of a stair," a formula which the Clerks of the Net Load have interpreted in opposite directions in successive cycles. The floor's Load-Diffusers are inspected under the same clause, and the inspection is recorded in the floor's own hand, not the visiting clerk's.
The Charter also establishes the office of the floor's substantiating body — the authorized person, or persons, whose written attestation that the floor is present counts as evidence in any proceeding. The body has been drawn from the Order of the Load-Bearing Word since the second recension. The current substantiator, Hennet Quill, inherited the office in 1794 from her aunt and has attested the floor's presence on every occasion required of her since. She has not been asked to attest its absence and has stated in writing that she would decline if asked. The Charter does not contemplate the case.
One small provision in clause VI is regularly overlooked by visiting parties. It is that no one may ascend past Spire 404 while carrying an open flame, and it appears in the text without further explanation, between a rule about seals and a rule about wet ink.
Extension by conduct
In 1219 a load surplus of forty-one units, displaced from a floor above, was taken up by Spire 404 without any amendment to the Charter. The Registrar of Informal Precedents ruled that the Charter had extended by conduct, and the ruling has never been overturned. The Charter is therefore understood to grow by what the floor actually does, a point of considerable pride on the floor and of considerable irritation in the Department of Structural Verifications.
The Department's counter-position, filed in 1221 and maintained unchanged, is that a Chartered instrument cannot extend itself and that the surplus of 1219 was absorbed by a floor which the Department has declined to name. No record of that floor's identity has been produced. The Department has been asked four times.
Relation to the Spire Integrity Protocols
The Charter predates the Spire Integrity Protocols and is not subject to them, a precedence the floor asserts in any dispute and which the Office of the Twenty-Third Spire has never formally contradicted. The two texts meet uneasily. The Protocols require regular audit of Load-Bearing Nodes under Annex 4; the Charter commits Spire 404 only to its own annual certification. In 1742 the Concordance of Refusals attempted to resolve the conflict by assigning the Charter to the Structuralist School as an example of a founding instrument and the Protocols to the Department of Structural Verifications as an example of a governing one. The Concordance thereby assigned the same floor to two authorities, and both have audited it.
The dispute has produced a body of commentary larger than the Charter itself. The Litany of the Fourth Theorem holds that Spire 404 is properly a Negative Foundation and that its load-bearing is all shadow; the floor's own readers reject this on the ground that a shadow cannot be certified annually. The question is treated in Notes on the 404 Anomaly, a compilation which remains unread past the eleventh page in every copy examined.
The chained copy at Spire 404 has been rebound twice, in 1410 and 1688. Neither binding has been audited.
See also
-
MS 4742.22
Petition for Light-Bearing Permits on Floor 404
The Petition for Light-Bearing Permits on Floor 404 (Designation 44--7) is an administrative instrument used to officially registe…
-
MS 7456.40
Valerius (V)
Valerius (V) is the fifth entry in the Valerian Register, the Tower's running census of persons bearing the name Valerius. The Reg…
-
MS 5136.56
Edict 719-Λ (Retroactive Non-Manifestation)
Edict 719-Λ (Retroactive Non-Manifestation) is a standing instrument of the Bureau of Structural Coherence, promulgated in the nin…
-
MS 2104.25
Principle of Generative Ambiguity
The Principle of Generative Ambiguity is the second of the three core tenets of the Progressivist School of Nomenclature, recorded…
-
MS 6567.88
Bureau of Metric Reconciliation
The Bureau of Metric Reconciliation is one of the four reconciliation bureaux whose overlapping remits are recorded but never cons…
-
MS 2149.59
Tenth Amendment to the Twelfth Concordance
The Tenth Amendment to the Twelfth Concordance is the founding instrument of the Office of Orthodoxy, adopted in the forty-first y…
Referenced by
- MS 0278.65 Pilaster Manuscripts
Readers also asked
Office of the Twenty-Third Spire: who are they?
The Office of the Twenty-Third Spire is a senior administrative and adjudicatory body within the Tower, vested with custodial responsibility for Spire 404 and oversight authority in cross-Spire coordination, ontological …
Office of the Twenty-Third SpireLibrarians: who are they?
The Librarians are the recognized custodial order of The Tower, vested by the Concordances with the exclusive authority and responsibility for the reception, indexing, and preservation of all holdings admitted to the arc…
LibrariansDepartment of Structural Verifications: who are they?
The Department of Structural Verifications is the administrative body responsible for the technical assessment, cataloguing, and ongoing certification of the Tower's load-bearing and spatial-defining elements. Its primar…
Department of Structural VerificationsStructuralist School: who are they?
The Structuralist School is a body of cataloguers, load-clerks, and spire-wardens holding that no holding may be described in isolation, and that every entry in the Tower must be specified by its position within the load…
Structuralist SchoolPassages cited from this record
-
The floor shall be known as 404 and by no other name, and this naming shall not be construed as a number, nor as a sequence, nor as a claim upon any neighbour.
Load-Bearing Charter of Spire 404, cl. II
Readers who consulted this also failed to find
- MS 5294.92 Load-Bearing Charter of Spire 404
- MS 9387.80 Negative Foundation
- MS 7382.46 Committee on Sequence Repair
- MS 0152.84 Concordance of Refusals
Because you consulted