The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

The Great Re-shelving of Y201

MS 4449.48 · Events and incidents

The Great Re-shelving of Y201 is the conventional designation for the re-shelving conducted during the year of the Crisis of the Re-aligned Stair, and is the only Great Re-shelving in the record that was undertaken without a prior inventory. It is counted separately from the Great Re-shelving proper, from the Great Re-shelving of 392, and from the eleven-day re-shelving of Atrium 9 in 4,109, on the grounds set out in Second Concordance, Annex 7: that a re-shelving begun under duress and concluded under protest cannot be entered in the same column as one begun in calm. The distinction has been disputed at every revision since, and no revision has removed it.

Origin and the Re-aligned Stair

Y201 is dated by the year-reckoning of the Fourth Landing, which begins its count at the first sounding of the Great Tone after midwinter. The Crisis of the Re-aligned Stair had by then entered its fourteenth month. Twelve flights between the Eleventh Landing and the Fourteenth Landing had settled a full step out of true during the previous autumn, and the Bureau of Vertical Transit had certified the affected landings as reachable but not citable.

On 3 Ember-month, the Bureau of Shelving and Resonance issued Provisional Directive 44, authorising the removal of all holdings from the affected flights to a temporary line along the Great Vertical Spiral. The directive was written in a single sitting and, by the admission of its own draughtsman, Clerk Ondrus Vale, "did not specify a terminus, a custodian, or a return" (Directive 44, preamble). Removal began on 9 Ember-month and continued for sixty-one days.

Conduct of the work

The re-shelving was carried out almost entirely by porters of the Third Porterage, working in chains of nine, with the shelves themselves carried rather than the volumes. This reversal of ordinary practice is the source of the episode's later difficulties: volumes were never separated from their shelving, and the two were recorded as a single unit in the Provisional Register of Y201. The Register consequently holds 41,600 entries for 41,600 units and cannot say how many volumes it contains.

Work stopped twice. The first stoppage, from 14 to 29 Frost-month, followed an objection by the Guild of Correctors that the temporary line passed within two handspans of the resonance channel and would corrupt any corrected text shelved there. The second, from 2 to 6 Thaw-month, was occasioned by snow on the Spiral, which the Office of Weather and Floor Conditions later confirmed to have been indoor.

The Echo of Un-Shelving

Because no inventory preceded the removal, the absence left by each volume was registered as a holding in its own right — a practice the Bureau would later formalise as Temporary Shelving but which in Y201 had no warrant. The resulting strata of absences came to be called the Echo of Un-Shelving, and it remains the longest-lived consequence of the episode. The Echo persisted in the affected flights for the whole of the year and beyond it, and Emergency Concordance 9.1.3 was drafted specifically to address what was to be done with a shelf that had been vacated in a manner the records acknowledged but could not date.

"Where a holding is absent by authority of a directive now void, the absence shall stand in the place of the holding until such time as the directive is either restored or forgotten, and it shall not be permitted to lapse in the interim."

— Emergency Concordance 9.1.3, clause 2

The clause has never been repealed, because no one has been able to establish whether Directive 44 was restored or forgotten. The Fourteenth Landing, which serves as central registry for records of the Great Re-shelving, holds the question open under file mark 201/V/9.

Dispute of dating and scope

There are three positions on what the Great Re-shelving of Y201 actually comprises, and they are not compatible.

The first, maintained by the Bureau of Predictive Shelving, holds that the episode began with the issue of Directive 44 and ended with its voidance by the Third Concordance in the following year, and that everything removed and returned in the interval belongs to it. On this reading the re-shelving lasted fourteen months and stands second in duration only to the Great Re-shelving of the Ante-Chamber.

The second, advanced by the Correctors' Standing Committee, restricts the episode to the sixty-one days of actual porterage, on the ground that a re-shelving is a movement of holdings and not a state of paperwork. The Committee's memorial of 4 Frost-month is blunt: "An absence is not a book, and a directive is not a hand" (Memorial of the Standing Committee, §3).

The third position, recorded without attribution in the margins of the Provisional Register of Y201, denies that any re-shelving occurred in Y201 at all and asserts that the affected volumes were merely moved along the Spiral and moved back. The margin note has never been signed, and the Librarians have declined to rule on it, noting only that the note is in a hand consistent with Clerk Ondrus Vale's and that Vale was, by his own account, elsewhere that winter.

Legacy

The administrative consolidation that followed the wider disruptions of the period — including those treated under the Great Re-shelving and the Great Mis-Shelving Incident of 712 — drew directly on the Y201 registers, and the Great Re-cataloguing later ratified Shelving Forms E 11 Through E 45 in part to accommodate units that had been shelved in chains of nine. The practice of carrying shelving with its contents was formally prohibited under Fifth Concordance, Annex 2, clause 11, and is prohibited still.

The Echo of Un-Shelving persists in the flights between the Eleventh and Fourteenth Landings. Visitors are asked not to reshelve anything they find there, and not to count the shelves.

See also

Referenced by

Readers also asked

Great Vertical Spiral: where is it?

The Great Vertical Spiral is the primary circulatory artery of the Tower, a continuous helical transit corridor connecting all known floors. It is distinguished from auxiliary spirals and annexes by its central administr…

Great Vertical Spiral
Fifth Concordance: what does it set out?

The Fifth Concordance is the first major procedural concordance to survive in its entirety, ratified in Year 47 of the Second Librarianate. It is primarily concerned with establishing protocols for the measurement, docum…

Fifth Concordance
Fourteenth Landing: where is it?

The Fourteenth Landing is an administrative and archival plateau located in the primary Western Aperture of the Great Spiral. It is formally designated under the Fourteenth Concordance as the site of the central registry…

Fourteenth Landing
Third Concordance: what does it set out?

The Third Concordance is the foundational regulatory document governing the Librarianate's procedures for the classification, verification, and archival of non-existent subjects. Ratified in Year 12 of the Second Librari…

Third Concordance

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.