The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Structural Schema

MS 0689.05 · Practices and doctrines

A Structural Schema is a required component of a Proposal Packet and the instrument by which a petitioner demonstrates that a Proposed Floor possesses internal arrangement rather than mere extent. Under Annex γ of the Twelfth Concordance, no Proposal Packet may be opened at the Desk of Destination until a Structural Schema has been attached, sealed, and countersigned by a Librarian of the second grade or above. The schema does not describe what the floor contains. It describes the manner in which the floor's contents are held to depend upon one another, and it is on the strength of that dependency, not on the contents, that a floor is admitted to the register.

The distinction is older than the form it produced. The Third Concordance, in its treatment of uninhabited landings, held that a floor exists wherever the stair meets a surface; the Seventh Concordance later revised this to require that the surface support something which could be displaced, and therefore that the surface have a structure. The drafting committee of the Twelfth inherited the second position and gave it documentary form. A Structural Schema is thus, in the words of the form's own marginal note, "a floor's argument that it could have been otherwise" (Twelfth Concordance, Annex γ, marginal gloss 4).

Composition

A Structural Schema is drawn on ruled stock in three registers. The lower register records the floor's load-bearing features and their stated intervals. The middle register records the dependencies between those features — which of them would fail if another were removed, and in what order. The upper register, which is frequently left blank and may lawfully be left blank, records dependencies that the petitioner anticipates but cannot yet demonstrate.

Blank upper registers are common and are not treated as defects. The Principle of Generative Documentation holds that an approved schema brings into being what it describes, so a petitioner who conjectures a dependency in the upper register and is later found to have been right is entitled to file a Binding Citation against the floor itself, which the floor is obliged to honour. Petitioners who conjecture wrongly are recorded in the Master Typology of Lacunae under Category 11(b), "anticipated structure, unrealised", and pay the standard fee for correction of a Proposal Packet.

Relationship to other schemata

The Structural Schema is frequently confused with the Diagram-Schema, which accompanies it and which records the same dependencies pictorially rather than discursively. The two are not interchangeable, though a floor whose Diagram-Schema is correct and whose Structural Schema is missing will pass scrutiny in the chambers of several Librarians, and has done so at least nine times since the Twelfth was ratified. The Taxonomy of Ornate Objects draws on the Structural Schema where a floor's ornamentation exceeds its structural purpose; a floor so classified is required to file a supplementary register explaining why the ornament does not itself bear load.

Structural Schemata are also required where a floor's contents are transferred between origin and destination, in order that the Origin/Destination schema may verify that what arrives is what was sent. The verification is formal: it confirms that the received arrangement answers to the filed arrangement, and does not confirm that either is good.

The Kestrel Dispute

Between the winters of the years recorded as 4,118 and 4,126, the office of the Sixth Recension and the clerks of the Lateral Stacks conducted a dispute over whether a Structural Schema could be amended after approval. The Lateral Stacks, which file under Annex Epsilon, held that an approved schema was fixed and that any later change required a fresh Proposal Packet with three copies of the Preliminary Concordance Alignment Statement. The Sixth Recension held that the schema described a floor which had, in the interval, been rebuilt, and that to require a fresh packet was to demand the petitioner describe a floor that no longer existed.

The matter turned on a single case: a floor designated only as 9-Kestrel, whose middle register had been filed in the winter of 4,119 with an acknowledged error in its second dependency. The petitioner, Clerk Ada Merrow, corrected the error in the following spring and was fined for amending a sealed instrument. She appealed on the ground that the instrument had been sealed against a floor that had since lost a staircase.

"The schema is not the floor, and the seal is not the schema. But a seal set upon a schema of a floor that is no longer there has been set upon nothing, and nothing may be amended."

— Sixth Recension, ruling of 4,124, clause 6

The ruling satisfied neither office. The Lateral Stacks continued to refuse amended schemata until 4,131, when the Proposed Nineteenth Concordance was circulated with a clause expressly permitting post-approval amendment where the floor's removal is recorded in the same register. The Nineteenth has not been ratified. Its clause is nonetheless cited routinely, and the clerks of the Lateral Stacks have been instructed to accept it as persuasive. Clerk Merrow was reimbursed her fine in the form of a credit against future filings, which she did not use.

Filing practice

Schemata are filed in the lower register of the Infinite Registry and are retrievable by floor designation, by petitioner, or by the number of dependencies declared. Retrieval by dependency count is discouraged; the count is frequently disputed and the index has not been reconciled since the Categorizational Arbitration of 4,097. Petitioners are asked not to bind schemata in cloth, as the cloth retains the impression of the seal and confuses the sorting racks. Ink corrections are permitted in the middle register only, and only where initialled in the margin by the petitioner and one witness.

The Axiomatic Lattice is not consulted in the preparation of a Structural Schema and should not be cited in one. A schema which cites the Lattice is returned unopened.

See also

Referenced by

Readers also asked

Desk of Destination: who are they?

The Desk of Destination is the administrative fixture charged with receiving, verifying, and closing out all transfers whose terminus has been declared under the Origin/Destination schema. It is conventionally cited as t…

Desk of Destination
Twelfth Concordance: what does it set out?

The Twelfth Concordance is a core administrative document governing the classification and containment of subjects possessing non-Euclidean properties, the reconciliation of dimensional anomalies, and the protocols for L…

Twelfth Concordance
Seventh Concordance: what does it set out?

The Seventh Concordance is the primary administrative codex governing the measurement, classification, and cataloguing of phenomena defined by their absence, incompletion, or intrinsic paradox. Ratified in Year 47 of the…

Seventh Concordance
Third Concordance: what does it set out?

The Third Concordance is the foundational regulatory document governing the Librarianate's procedures for the classification, verification, and archival of non-existent subjects. Ratified in Year 12 of the Second Librari…

Third Concordance

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.