The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Registry of Tolerances

MS 7668.62 · Documents and ordinances

The Registry of Tolerances is a living document maintained by the Office of Vertical Logistics that catalogues dimensional, mass, and resonant limits within The Tower. It is the largest single instrument of measurement in the archive, presently bound in two hundred and forty-one folio volumes held on Floor 88, and it is revised on a schedule that no surviving clerk has been able to state without consulting it. Unlike the Manual of Acceptable Tolerances, which sets thresholds, the Registry records them: it does not say what ought to be permitted, only what has been observed to hold, and for how long.

Entries are organised by the object measured, the floor on which the measurement was taken, and the margin within which the object has been known to vary without incident. A typical entry reads: Staircase 14 (north flight), tread depth, 28.4 cm, variance ±0.2 cm, stable since the Winter Recension; three hundred and eleven observations. The Registry contains some nine hundred thousand such lines. It is consulted, on average, four times a day.

Origin and the question of the first volume

The Registry's first volume is dated to the year of the Second Concordance, though the Office of Vertical Logistics has never produced the volume itself, only a fair copy of it made eleven years later by a scribe whose name is recorded as Ellery Vant. Vant's copy carries a marginal note in a hand now identified as his own: "the original is said to be below." No expedition has located it, and the Office of Dimensional Standards has ruled, without explanation, that the question of the original's whereabouts is "not a measurement."

Volume I establishes the practice that governs all subsequent volumes: every tolerance is entered with the date and hour of its last confirmation, and any entry not reconfirmed within the Registry Cycle is struck through in red and marked lapsed. Roughly a fifth of the Registry is currently struck through. This is considered normal.

Relationship to the Three Tolerances

The Registry is the working ledger of the Three Tolerances, and its structure follows that framework's classificatory spine as set out in the Manual. Point 5 of the Three Tolerances — the stairwell measurement standard — is reproduced in full at the head of every volume, at the insistence of the Stairwell Commission, which has twice threatened to withdraw from the Registry entirely over its abridgement in the 41st and 63rd editions. The Commission's objection in 63 was that the table of permitted variations had been set in a smaller type than the accompanying prose, and that this constituted a "silent amendment of the standard." The Office conceded the point, reset the table, and did not alter a figure.

Resonant tolerances in the Registry are cross-referenced to the Concordance of Tolerances, which sets the resonance tolerance for establishing Sympathetic Links. In practice the two documents disagree. The Concordance permits a sympathetic link where the resonant deviation does not exceed one part in four hundred; the Registry, at Volume 119, records links successfully established at one part in three hundred and twelve, and adds, without comment, that the parties were "later separated."

The Vant grievance

Ellery Vant's descendants served the Registry for six generations, and the family's grievance against the Manual of Acceptable Tolerances is the longest-running dispute in the Office's records. It began in the winter of the Ninth Recension, when the Manual's administrators moved the tolerance for drift in figures across recensions from a fixed standard to a graduated one. The Vants held that the change retrospectively invalidated forty years of their entries, and petitioned for their restoration.

The petition was refused on the grounds that revocation proceedings must adhere to the protocols outlined in the Manual of Acceptable Tolerances, and that the Vants had filed under the wrong protocol. A second petition, filed correctly, was refused because the first had established that the entries were not revocable. The third petition — filed by Vant's great-granddaughter Alder Vant in the same month as the second refusal, which she maintained was a clerical necessity — was accepted. The entries were restored. They were then struck through again eleven days later for having lapsed during the dispute. Alder Vant's response is recorded in the Office's minute-book in full: "Then the Registry is a list of what we have stopped looking at."

"The Registry does not record what is true. It records what was checked, and when, and by whom. Where those three agree, the matter is settled."

— Office of Vertical Logistics, Standing Instruction 7

Incidents

The Registry has twice been closed to consultation. The first closure, of nine days, followed the discovery that an entry in Volume 156 described a door on Floor 210 whose height was recorded as varying by up to four centimetres between observations, with no note of explanation. The entry was sealed rather than corrected, and the sealing is noted in the margin as "pending." The second closure, of one afternoon, was for cleaning.

During the Western Atmospheric Spiral calibration crisis, the Registry's resonant entries for the Spiral were found to have been copied forward, without reobservation, for nineteen consecutive cycles — a fault traceable to a single clerk, Marden Osp, who had inherited the task from his predecessor and understood it to consist of transcription. Osp was not disciplined; the Office ruled that the Registry's own instructions had been ambiguous, and amended them. The amendment is the longest entry in the Registry and concerns itself entirely with the Registry.

Use and restriction

The Registry may be consulted by any Librarian in good standing, by written application delivered to the Floor 88 desk before the eleventh hour, and by no one else. Measurements taken by an applicant may not be entered by that applicant; entry is the work of the Registry clerks alone, who will not accept a figure they have not themselves reobserved, and who have been known to hold a measurement for a full cycle on this account. The delays are recorded. They are not tolerances.

See also

Referenced by

Readers also asked

Stairwell Commission: who are they?

The Stairwell Commission is a standing body of the Librarians charged with the measurement, naming, licensing, and doctrinal interpretation of the Tower's stairwells. It is among the oldest offices whose seal survives, t…

Stairwell Commission
Ninth Recension: what does it set out?

The Ninth Recension is the collective designation for the body of amendments, consolidations, and administrative reforms promulgated under a single seal between A.T. 1469 and A.T. 1476, and the only recension in the Towe…

Ninth Recension
Office of Vertical Logistics: who are they?

The Office of Vertical Logistics (OVL) is an administrative body within The Tower responsible for the regulation, safety certification, and spatial compliance of all physical objects in vertical transit. Established by A…

Office of Vertical Logistics
Manual of Acceptable Tolerances: what does it set out?

The Manual's foundation is the Axiom of Recursive Validation, which states that the instrument used to verify a tolerance must itself be certified within a tighter tolerance band. This creates a nested hierarchy of measu…

Manual of Acceptable Tolerances

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.