The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Phase One (Baseline Sustenance)

MS 6955.53 · Practices and doctrines

Phase One (Baseline Sustenance) is the resting state of the Ventilation System, characterized by neutral pressure and flat resonance, in which the Tower sustains ambient conditions sufficient for the preservation of archival stacks. It is not a procedure but a condition: the Tower in Phase One is doing nothing in particular, and doing it to specification. The state is continuous across most floors, interrupted only by expeditions, structural works, and the occasional collapse of a stack into the floor beneath it.

Phase One is distinguished from the seven-phase phenomenological calibration of Phase One: Calibration, with which it is frequently confused in casual citation. The confusion is old enough that the Office of Recorded Conditions maintains a standing note on the distinction, affixed to the door of its reading room: "Phase One is where the air is. Calibration is what we do to it." The note is unsigned, as the Office has never confirmed its authorship.

Conditions of the resting state

Neutral pressure in Phase One is defined as 1004 millibars at the reference mark on Floor 204, with a permitted drift of two millibars in either direction before an incident is logged. Flat resonance is measured in the standard fashion by Spectral Baseline Capture, which returns a reading of negligible amplitude during true Phase One and a reading of no amplitude at all during Phase One Identification Amp Quarantine. The difference between negligible and none is the subject of a standing dispute between the Quarantine Authority and the Office of Recorded Conditions, and has been since the Authority's founding.

Temperature is not regulated in Phase One, but is maintained. The Office of Sustenance holds that this maintenance falls within its remit under Concordance 44, which obligated the Office to provide for all classified entities, and the Office has argued without success that ambient warmth is a form of provision. The Office of Sustenance Integrity has taken no position, being chiefly occupied with culinary paradoxes and with the Department of Sustenance and Illumination, which was placed within its purview by the same Concordance.

Relation to Baseline Establishment

Phase One is the operational precondition of Baseline Establishment. Readings taken during the Instrumentation phase are captured against the absolute temporal baseline supplied by the Central Chronometer, and those readings are worthless unless the Ventilation System is in Phase One at the moment of capture. The Axiom of Recorded Baseline states the matter plainly: a reading taken in motion records only the motion. Accordingly, the Declaration phase of Baseline Establishment cannot begin until the Ventilation System has held Phase One for no fewer than eleven hours, as set out in the annexes to Concordance 19.

"No Baseline Irrational shall be declared into a moving room."

— Concordance 19, Annex 2, clause 6

In practice the eleven-hour hold is frequently interrupted. The winter of the Year of the Third Recension saw Phase One broken on eleven separate floors in a single week by a resonance event later attributed to a mis-shelved atlas on Floor 1871, and the Baseline Irrational declared that season was subsequently annulled and redeclared, twice, at considerable expense to the Office of Recorded Conditions.

Administration and the dispute of 2%

Day-to-day oversight of Phase One is divided. The Ventilation Authority operates the ducts and holds the pressure; the Office of Sustenance holds that the air thus moved falls within its provisioning remit; the Office of Recorded Conditions holds the log. No body holds the whole of Phase One, which the Concordance Commission has repeatedly declined to remedy, observing in its Fourth Review that divided custody of a condition is what keeps the condition honest.

A persistent minority reading holds that Phase One is not a state of the Tower at all but a nomenclature of convenience, and that what is called Phase One is simply the Tower standing still. This reading was advanced most fully in the Marginalia on Phase One attributed to the clerk Aurelian Stope, who argued that the Ventilation System had been in Phase One continuously since the sealing of the lower shaft and that all recorded interruptions were errors of the log rather than events in the ducts. Stope's reading was formally considered by the Concordance Commission in its Eleventh Review and rejected in a single sentence, without reasons, which the Commission's secretary later described as "the shortest recension we have made."

The disagreement is not altogether settled. The Quarantine Authority continues to log interruptions that the Office of Recorded Conditions will not confirm, producing two annual counts of Phase One breaches that differ by approximately two percent. The discrepancy has been reviewed four times and is now carried forward as a fixed item in both offices' accounts, in the manner of a bad debt.

Maintenance

Stacks in Phase One are inspected on a rota of ninety-one days. Inspectors are reminded that the resting state applies to the stacks and not to the inspectors, who are expected to remain awake and to climb the ladders without assistance. Lamps are carried in the left hand only, so that the right remains free to steady the ladder; the rule is posted at the head of every spiral and is enforced.

Floors found in Phase One are recorded in the day-book as quiescent, and floors found otherwise are recorded as occupied, whatever the cause. The day-books of the Office of Recorded Conditions hold some forty thousand entries recording floors occupied by no one, the majority of them on Floor 913.

See also

Referenced by

Readers also asked

Spectral Baseline Capture: how is it conducted?

Spectral Baseline Capture is the officially sanctioned process through which ambient resonance and spectral potential within a designated archival zone are initially quantified and permanently recorded as a formal Spectr…

Spectral Baseline Capture
Department of Sustenance and Illumination: who are they?

The Department of Sustenance and Illumination is an administrative bureau within the Office of Archival Integrity responsible for the codified intersection of nourishment and light. Established under Annex D of Concordan…

Department of Sustenance and Illumination
Ventilation System: what is it for?

The Ventilation System is the comprehensive network of mechanical and pneumatic apparatuses, along with their associated administrative protocols, responsible for the air circulation, humidity control, and atmospheric cl…

Ventilation System
Quarantine Authority: who are they?

Quarantine Authority denotes the designated administrative body or statutory framework vested with the power to impose, regulate, and terminate a formal Stasis Quarantine within The Tower. As established by Inventory and…

Quarantine Authority

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.