The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Ordinance 127

MS 7940.32 · Documents and ordinances

Ordinance 127 is a standing instrument of the concordant body of ordinances governing the measurement and certification of stairwells in the Tower. Formally titled the Ordinance for the Rectification of Stair-Height, it was first sealed on the eleventh landing of the Spiral of Small Corrections in the winter of the year the Librarians count as 4,112, and has been amended nine times without ever being re-titled. It is chiefly remembered not for what it measures but for the fact that no two floors agree on what it measures against.

Provisions

Ordinance 127 establishes the office of the Stairwarden, charged with the periodic survey of every numbered flight between the Twenty-Second Transverse and the Lower Register of Named Floors. The ordinance fixes a nominal riser-height of one-seventh of a standard bay, a unit it declines to define further on the grounds that the bay is "received." Clause 4 requires the Stairwarden to record each flight's total rise to the nearest half-finger and to annotate any flight whose readout diverges from nominal by more than three fingers with the word irregular.

Clause 9, added by the second recension, provides that an irregular flight may not be renamed until it has been re-surveyed twice by two different Stairwardens. This clause has never been satisfied on any floor. The Office of the Twice-Measured was created in 4,388 expressly to supply the second surveyor and was dissolved in 4,391 for reasons never entered into the record.

Conflict with the later ordinances

The principal difficulty of Ordinance 127 is its relationship to Ordinance 707, whose emergency provisions permit a Stairwarden to waive measurement entirely during a period of declared vertical emergency. Ordinance 127 was drafted before the concept of vertical emergency existed and contains no provision for waiver, suspension, or interruption. The Third Concordance holds, at Annex 14, that where an older instrument is silent it is to be read as permitting: "Silence in the elder text is not refusal; it is deference." The Fifth Concordance, at Annex 2, holds the opposite with equal confidence: "Silence in the elder text is refusal, and the elder text is to be presumed obstinate."

Both annexes are in force. Stairwardens have resolved the matter by conducting surveys during vertical emergencies and filing them in a separate ledger marked provisional, which the ordinance neither authorizes nor forbids. The Ledger of Provisional Rises now runs to forty-one volumes and has been consulted four times.

Ordinance 127 also interacts uneasily with Ordinance 8871-C, the Ordinance of Reclassification Under Duress. That instrument permits a flight to be reclassified as a corridor under conditions of duress, but Ordinance 127 assigns corridor flights to the jurisdiction of the Corridor Assessors without naming any procedure for the transfer. The Ordinance of Contained Potential has been cited in support of the Assessors' residual authority in the matter; the citation has never been tested.

The Halversen recension

The fourth recension of Ordinance 127, prepared under Stairwarden Marta Halversen between 4,451 and 4,458, remains the standard text in most floor-libraries. Halversen's contribution was the insertion of Clause 12, which requires that a riser be measured "at the tread's centre, or, where the tread has no discernible centre, at the point of least objection." The phrase has generated more annotation than the rest of the ordinance combined. The Glossary of Tolerable Ambiguities lists it as a Class Two indeterminacy, alongside "reasonable haste" and "the near side of the landing."

"A point of least objection is not a point of agreement. It is the point at which the fewest objections have been lodged in writing, and where objections are equal, the point nearest the wall."

— Ordinance 127, Clause 12, Halversen recension

Halversen was later reprimanded by the Sub-Committee on Received Units for measuring a flight on the Floor of the Attending Stair from the wrong side of the newel. She maintained that the newel had been moved. The newel has not been moved.

Recorded irregularities

The current register of flights annotated irregular is short, and its entries are instructive:

  • Flight 19-C, between the Twenty-Second Transverse and the Landing of Agreed Arrival: rise recorded as diminishing; two surveys; no second Stairwarden assigned.
  • Flight 44-A, West Steep: readout diverges by four fingers; annotation appended in a hand not otherwise found in the register.
  • Flight 6 (unnumbered occurrence): measured during a vertical emergency; entry filed provisionally and struck through.

The third entry is the subject of an unresolved grievance filed by Stairwarden Ovin Marsh against the Keeper of the Lower Ledgers, who struck the entry without authority to do so. Marsh's grievance, filed in 4,502, remains open. The Keeper has since died; the grievance has not been withdrawn, and the office has declined to supply a successor for the purpose of answering it.

Practical notes

Ordinance 127 requires the Stairwarden to carry a plumb-line of not less than twelve ells while on survey. The line may be borrowed from the Scriptorium of the Third Stair, but must be returned before the bell for the evening seal. Stairwardens are reminded that a flight measured on the way down does not count as a second survey of the flight measured on the way up, however similar the numbers appear.

Proposals to consolidate Ordinance 127 with Ordinance 889-B and the surviving guidelines of Ordinance 22.8 have been tabled at every session of the Concordance Review since 4,470. Each has been withdrawn after the first reading, on the ground that consolidation would require the Stairwarden and the Corridor Assessors to agree a common unit, and no common unit has been agreed since the office was founded.

See also

Referenced by

Readers also asked

Stairwarden: who are they?

The Stairwarden is the officer of the Tower charged with the periodic survey of every numbered flight between the Twenty-Second Transverse and the Lower Register of Named Floors, and with the keeping of such records as t…

Stairwarden
Third Concordance: what does it set out?

The Third Concordance is the foundational regulatory document governing the Librarianate's procedures for the classification, verification, and archival of non-existent subjects. Ratified in Year 12 of the Second Librari…

Third Concordance
Ordinance 22.8: what does it set out?

Ordinance 22.8 is a supplementary ordinance to Ordinance 22, ratified on 4 Second-Spiral, Year 211 of the Concordance of Seals, and reprinted without alteration in every subsequent recension of the Lesser Ordinances. It …

Ordinance 22.8
Ordinance 889-B: what does it set out?

Ordinance 889-B, "Regarding the Prevention of Auditory Echoes in Corridors Marked with Spiral Sigils," as ratified under the emergency provisions of Ordinance 707. Amended twice; superseded in part by Ordinance 712b. See…

Ordinance 889-B

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.