The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Moratorium on Physical Incursion

MS 7185.55 · Practices and doctrines

The Moratorium on Physical Incursion is the standing prohibition on the entry of persons, instruments, or measured quantities into any floor, vault, or stairwell designated as unentered by the Librarians. It is distinct from the several moratoria on physical inspection — notably Clause Omega-7 of the Fourteenth Concordance and the inspection protocols of Vault Omega-9 — in that it forbids approach rather than examination. Under the Moratorium, a sealed floor may be described, surveyed at a distance, and argued about at length; it may not be walked on. The distinction is maintained with some ferocity by the Office of Thresholds, which holds that the two classes of moratorium have been confused in every major incident since the Void Incursion of Year 43.

Origin and text

The Moratorium was issued in Catalog Year 22,911, two years after the Great Ambiguity Incursion and in the same session that sealed the western spiral. Its operative clause is short enough to be quoted in full at most hearings:

"No foot, wheel, cord, plumb, or portion of a body shall cross a threshold marked unentered, nor shall any object be thrown across it in the hope of learning what lies beyond."

— Moratorium on Physical Incursion, Clause 1

Clause 2 extends the prohibition to sound, on the reasoning that a shout returns an echo and an echo is a measurement. Clause 3 exempts the Librarians themselves, an exemption that has never been exercised and which the Office of Thresholds has petitioned four times to have struck.

The marking of thresholds

Thresholds are marked in red ochre by the Scriptorium of Seals, which maintains the only register of unentered floors. The register is not a list of floor numbers, since Floor Numbering is not sequential and has been revised eleven times; it is instead a list of doorframes, each described by its position relative to the nearest stairwell and by the direction in which it opens. Clerks are required to record the direction of opening because, as the Scriptorium's standing instruction of 22,914 puts it, "a door that opens outward has already decided something."

Ochre is renewed every nine years. Where renewal has been missed, the threshold is treated as unmarked and therefore passable, a rule that produced the Incident of the Ninth Landing in the winter of 22,947, when a survey party of six entered a floor that had been sealed for thirty-six years because the ochre had weathered to the colour of the surrounding stone. The party returned. Their report is filed under seal and is itself unentered.

Relation to Moratorium 77

The two instruments are frequently cited together and are not related. Moratorium 77 governs the unbinding of provisional syllogisms and says nothing about bodies or thresholds; the Moratorium on Physical Incursion governs bodies and thresholds and says nothing about syllogisms. The confusion arises from a copying error in the Eleventh Concordance, Annex 2, where the scribe, having run short of space, abbreviated both as Mor. Phys. The error was corrected in the Twelfth Concordance and reintroduced in the Thirteenth by a different scribe working from the uncorrected text.

Scholars remain divided on whether the Moratorium binds the Silent Librarians, who ratify all moratoria applicable to their jurisdiction but who have never been observed to approach a threshold. The Commentary of the Fourth Recension holds that silence constitutes assent; the Office of Thresholds holds that silence constitutes silence. Neither position has been tested, because testing it would require an approach.

Amendment and the standing suspension

No amendment to the Moratorium has taken effect since the Moratorium of Amendment suspended all further amendments to moratoria issued under Moratorium 77. The suspension was drafted on the assumption that the two instruments were related — an assumption drawn from the abbreviation error described above — and has never been corrected, because correcting it would require an amendment, which the suspension forbids. Clause 2 of the Moratorium of Amendment requires that existing amendments be consolidated and read aloud to a quorum of Librarians before any further amendment may proceed. The consolidation has been read aloud twice, in 22,951 and 22,968; on both occasions the quorum was found to be one short, and the reading was struck from the record.

The Librarian-Regent of a neighbouring jurisdictional floor retains the power to issue an edict overriding a moratorium on inspection, but no corresponding power exists for incursion. The asymmetry is deliberate and is defended in the Seventh Concordance, Annex 9, on the ground that "a document may be unsealed and resealed; a floor, once walked on, is walked on."

Practical notes

Visiting surveyors are reminded that the Moratorium applies to the whole of a threshold, including its sill, and that leaning across a sill while keeping both feet in the corridor is not an exception. Instruments may be extended across a threshold only if they are not expected to return. The Post-Incursion Ledger of Unaccounted Volumes records 214 such instruments since Year 43, of which 209 are listed as presumed measuring and five as presumed measured.

Copies of the Moratorium are held at Annex Omega, where they are available for consultation under the moratorium on physical inspection that governs that repository. Readers wishing to consult the original should note that it is kept on an unentered floor.

See also

Referenced by

Readers also asked

Moratorium of Amendment: what does it set out?

The Moratorium of Amendment is the standing suspension, currently in its forty-first recension, of all further amendments to moratoria issued under Moratorium 77. It is not itself a moratorium in the ordinary sense — it …

Moratorium of Amendment
Post-Incursion Ledger of Unaccounted Volumes: what does it set out?

The Post-Incursion Ledger of Unaccounted Volumes is the primary document of record for the Void Incursion of Year 43, maintained on Floor 719 under the seal of the Office of Post-Ratification Affairs. It exists to answer…

Post-Incursion Ledger of Unaccounted Volumes
Eleventh Concordance: what does it set out?

The Eleventh Concordance is a foundational administrative document ratified in Year 45 of the Third Librarianate, primarily concerned with establishing procedural guidelines for the cataloguing of non-entities and govern…

Eleventh Concordance
Annex Ω: what does it set out?

Annex Ω was an addendum to the Tenth Concordance ratified on 14 Spiral, Year 412 of the Third Cataloguing Era. It formally initiated the undertaking known as The Partial Survey and established the methodological and repo…

Annex Ω

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.