The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Drain of Oblivion

MS 3050.29 · Objects and instruments

The Drain of Oblivion is a floor-drain aperture on Floor 302, set flush in the paving of the eastern transit arcade and measuring 41 centimetres across at the lip. It is the only aperture on record whose closure has never been lawfully completed, and the only one for which the required authorisations are four in number, mutually exclusive in sequence, and — by the reading of the Central Registry — impossible to hold simultaneously. It is catalogued under Object Class 7 (Apertures, Unsealed) and has been so catalogued since the register was opened.

What the Drain drains is not disputed. Everything that passes the lip is catalogued in order of arrival, and the ledger of arrivals is kept in a hand that is not the Registrar's. The dispute concerns only who may stop it.

Authorisation and its accumulation

The Drain was first sealed, briefly, in Year 189, under a provisional writ issued by the Architect-Superior and countersigned by no one. The writ was found defective in Year 191 and the seal lifted. Since that finding, the Registry has required four authorisations, drawn from four offices that by their own charters may not convene in the same chamber:

Each office has, at various times, issued its authorisation. None has issued it in the same decade as the last. The Registry's position, stated in a marginal note of Year 344, is that the Drain is therefore "fully authorised and wholly unsealed, which is the ordinary condition of the Tower."

The Vex recension

The most sustained attempt to close the Drain was mounted by the clerk Arlo Vex, who between Years 337 and 341 assembled three of the four authorisations in a single portfolio and carried them personally to Floor 302. The fourth, the cartographic return, was withheld by the Guild on the ground that its surveyor had been unable to establish where the arcade ended. Vex's account of the refusal survives in the Registry's correspondence file:

"I was told the floor had not been measured to its conclusion, and that a return could not be sealed upon a floor of unknown extent. I asked whether the Drain might be sealed pending the measurement. I was told that the measurement could not proceed through a sealed drain."

— Arlo Vex, letter to the Central Registry, Year 341

Vex petitioned under Form I-7 in Year 342 and was refused on the technicality that the Drain's contents were already catalogued and could not therefore be vacated. He did not petition again. The portfolio itself was later filed under the Notice of Vacancy procedure and has not been retrieved.

Scholarly disagreement

Two recensions of the authorisation requirement are in circulation and cannot be reconciled. The Third Concordance, Annex 6, requires the four authorisations to be presented "together, and in one hand." The Doctrine of Irreversible Vacancy, a later commentary widely cited on Floor 300 and below, holds that the authorisations are cumulative rather than concurrent, and that an authorisation once granted remains in force until formally withdrawn — which none of the four offices has ever done.

The practical consequence is considerable. Under the Doctrine, the Drain is already sealed and has merely not noticed. Under the Concordance, it cannot be sealed at all. The Librarians have declined to resolve the question, noting in Year 366 that both readings are "internally sound and externally inconvenient" (Registry minute, series D, folio 88). A third position, advanced by the Gutterwell Folios and largely disregarded, holds that the Drain is not an aperture but a record of one.

Relation to other oblivion works

The Drain is frequently confused with the Drain of Unfinished Thought, three floors above it, and with the Oblivion Sump on Floor 5017. The confusion is administrative rather than hydrological: the three works share no conduit, though all three are named in the same schedule of the Central Registry and are therefore filed together. The Drain of Oblivion drains; the Sump receives; the Drain of Unfinished Thought does neither, and is catalogued as a wall.

Residues recovered from the Drain during the clearing of Year 358 were conveyed, per standing instruction, to the Furnace of Quiet Oblivion on Spiral 7. The conveyance record notes that the residues arrived already labelled.

Maintenance and current standing

The Drain is cleared quarterly by the floor's own maintenance party, a procedure that requires no authorisation and has never been interrupted. Cleaning is performed on the second and fourth rest days, between the hours of six and eight, and the arcade is closed to transit while the grille is lifted. Persons wishing to observe the clearing must present themselves at the western stair before six and may not speak while the grille is open.

The seal itself — an iron disc of 39 centimetres, cast in Year 189 — is held in the Sable Cabinet and has been examined twice in the present century. Both examinations found it in good condition. It has never been fitted.

See also

Referenced by

Readers also asked

Expeditionary Cartographers' Guild: who are they?

No map can be complete, but any map can be improved. The duty of the expeditionary cartographer is not to reach an end, but to ensure the next iteration is marginally less wrong than the last.

Expeditionary Cartographers' Guild
Form I-7 ("Petition for Epistemic Vacancy"): what does it set out?

Form I-7 ("Petition for Epistemic Vacancy") is the scheduled instrument by which a subject formally declares that nothing is known about a matter, and requests that the archive be permitted to know nothing about it in an…

Form I-7 ("Petition for Epistemic Vacancy")
Architect-Superior: who are they?

The Architect-Superior is the senior administrative official of the Unbuilt Wing, vested with executive authority over its holdings, staff, and classification protocols. The position exists by virtue of The Tenth Concord…

Architect-Superior
Central Registry: who are they?

The Central Registry is the primary administrative and citational nexus for all active codified law within The Tower, located at Spiral 117, Aperture Beta. It is the physical and conceptual counterpart to the Central Reg…

Central Registry

Passages cited from this record

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.