The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Department of Vertical Integrity

MS 8675.57 · Guilds, orders and offices

The Department of Vertical Integrity is the Tower office concerned with whether a thing is upright, and whether it is upright in the manner it was certified to be. It is among the oldest of the integrity departments and the only one whose founding instrument is a drawing rather than a text. The Department occupies Floors 211 through 214 of the western riser, though its inspecting staff spend most of the year on other floors, since the objects of its attention are wherever something is standing.

It is frequently confused with the Department of Structural Integrity, which oversees the Bureau of Structural Integrity and grants Structural Integrity Waivers, and with the Department of Stack Integrity, which measures Conceptual Integrity. The Department of Vertical Integrity holds no view on whether a thing bears load or whether it makes sense; it holds a view only on whether a thing is plumb. These distinctions are set out at length in Seventh Concordance, Annex 2, which the Department has never fully accepted.

Mandate

The Department certifies verticality in three grades — Declared, Maintained, and Observed — and records each certification in the Plumb Register, a bound series kept on Floor 212 and corrected in red ink by successive Registrars. A Declared vertical is one asserted by the builder and not yet tested. A Maintained vertical is one tested within the past nine years. An Observed vertical is one a Department inspector has seen with their own eyes and entered in the field notebook with the date, the hour, and the weather.

Certification is not the same as correction. The Department does not straighten anything. When an inspector finds a column out of true, the finding is recorded, the holder is notified, and the column is entered in the Register of Declinations, where it may remain for decades. The longest-standing entry, a lamp standard on Floor 63 leaning 4 degrees 12 minutes from the vertical since the winter of 1411, is still certified Declared and has outlasted six Registrars.

The Aperture Dispute

Disagreement persists over whether light wells and apertures fall within the Department's purview. The Department of Vertical Integrity has always held that an aperture is a vertical only by absence, and that certifying an absence is the work of the Department of Vertical Cartography, which maintains the official axis. The Cartographers, for their part, contend that cartography records the axis and does not vouch for it, and have twice returned the Department's filing without reading it.

"A hole is not a column. It may be vertical; it cannot be upright."

— Registrar Emeric Vaunt, marginal note to the Plumb Register, Floor 212

The Department of Vertical Arbitration has been invoked on the question three times and has declined jurisdiction each time, on the ground that the dispute concerns no holding on any particular floor. The Bureau of Vertical Integrity, an older body often mistaken for the Department, has taken the opposite position in its own filings, arguing that apertures are verticals of the first order because nothing obstructs them. The two offices share a corridor and do not share a tea hour.

Notable Findings

The Department's most cited finding remains the Bellwether Survey of 1388, in which inspectors tested every column on Floors 40 to 60 with a plumb line of braided cord and a brass bob of fixed weight. The Survey found 61 columns in tolerance, 12 out of tolerance, and one column on Floor 48-A that could not be tested because the floor's logistical codes had not been settled. The Bureau of Vertical Integrity has cited this last result in every filing since, maintaining that Floor 48-A should not possess independent logistical codes until its verticals have been certified; the Department has never ruled on the matter and does not intend to.

In 1562 the Department suspended its own certification of a spiral stair on Floor 307 after an inspector observed that the newel post had been replaced with one of a different timber. The suspension stood for eleven years while the question of whether a stair can be upright was argued. It was resolved by the observation that a stair is neither upright nor recumbent but proceeds, and the certification was reissued as Maintained on the understanding that the word applied to the newel post alone.

Practice

Inspectors work in pairs, one to hold the cord and one to read the bob, and are required to record the reading before the weather. A plumb line may not be borrowed between inspectors, and any bob found in a coat pocket at the end of a shift is entered in the Lost Instrument Ledger whether or not it is returned the same morning. The Department's cord is supplied by the Department of Metrical Integrity and is inspected for stretch at each quarter-day.

The Department publishes its findings annually as the Schedule of Leanings, distributed to the integrity departments and to anyone who asks at the counter on Floor 211. It contains no recommendations.

See also

Referenced by

Readers also asked

Seventh Concordance: what does it set out?

The Seventh Concordance is the primary administrative codex governing the measurement, classification, and cataloguing of phenomena defined by their absence, incompletion, or intrinsic paradox. Ratified in Year 47 of the…

Seventh Concordance
Department of Structural Integrity: who are they?

The Department of Structural Integrity is a regulatory body charged with certifying that new architectural modifications within the Tower do not compromise its fundamental stability. Operating under the authority of Clau…

Department of Structural Integrity
Department of Vertical Arbitration: who are they?

“Verticality implies hierarchy; arbitration requires equity. A department that names itself for both serves neither.”

Department of Vertical Arbitration
Bureau of Vertical Integrity: who are they?

The Bureau of Vertical Integrity is a standing body of the Tower charged with confirming that the vertical axis is being honoured in all matters submitted to it for confirmation. The Bureau does not build, survey, measur…

Bureau of Vertical Integrity

Passages cited from this record

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.