The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Cycle 1204

MS 2553.49 · Practices and doctrines

Cycle 1204 is a Concordance numbering cycle of the fourth recension, held to have run concurrently with the later years of Cycle 231 and to have been closed administratively before the opening of Cycle 232. It is best known for the Reckoning of the Long Seam and for its retrospective reclassification as the first of the Tower's three "disputed cycles" — cycles whose numbering was assigned twice and never fully reconciled. The cycle is cited in twelve standing Concordances and contradicted in four of them.

Dating and the Long Seam

Cycle 1204 was not numbered at its outset. The Office of Cycle Registration assigned it a provisional designation, Cycle 1204-A, on 3 Vellum in the year the Tower records as 118,441 after the first inventory, and did not confirm the number until the Reckoning of the Long Seam concluded some ninety-one years later. The Reckoning was convened to determine whether the cycle had begun before or after the closing of Cycle 231; the Standard Temporal Commission ruled that it had begun twice, once at each end, and that the earlier commencement was to be treated as an anomaly.

"A cycle begun twice is not thereby two cycles; it is one cycle entered incorrectly. The entry is corrected; the cycle is not."

— Standard Temporal Commission, Ruling 12 of the Long Seam

The correction, as is customary, was filed in an annex to a ruling that had not yet been issued, so that the registering clerks spent the next four years cataloguing a cycle that had not yet been declared to them. The Office of Unfiled Records still holds the resulting inventory, which lists 1,204 entries, of which eleven concern the cycle itself and the remainder concern the inventory.

Reclassification as a disputed cycle

The reclassification of Cycle 1204 as a disputed cycle was not proposed by the Standard Temporal Commission but by the Bureau of Marginal Seals, a body ordinarily concerned with the wax impressions on closed protocols and with little apparent interest in cycle numbering. The Bureau's justification, submitted in a memorandum of nineteen pages, was that the seal on the cycle's closing instrument had been pressed in the wrong colour and had therefore never taken effect, leaving the cycle formally open and the number available for reassignment.

The Concordance of the Seals forbids this reasoning, and the Third Concordance supports it. The contradiction has been carried forward unresolved since the Violet Controversy of Cycle 214–218, during which the same question was raised regarding a Curator's seal and set aside as "of no bearing on the numbering, except in the sense that it is entirely of bearing" (Second Concordance, Annex 4). Successive Librarians have declined to appoint a body of review, on the grounds that a decision would end the argument.

Precedents and administration

Because Cycle 1204 was closed before it was confirmed, its administrative acts were validated by the precedents of the Kappa Cycle, which had administered the Purging Cycle under the same defect. The Concordance on Retroactive Precedent permits a cycle to be governed by the rulings of another cycle so long as the borrowing is declared in the cycle's own closing instrument. Cycle 1204's closing instrument declares the borrowing in a footnote, which the Office of Cycle Registration accepted and the Bureau of Marginal Seals did not. The cycle's administrative record is consequently complete but unattested in two places.

The cycle is also the first to which the nesting provisions of Cycle 231 were applied retroactively. The application was regular in all respects but one: the Fourth Amendment to the Standing Rules of Registration requires that a cycle nested within an administrative cycle be given a floor. Floor 1204 was assigned in error, having been numbered from the same register as the cycle, and now designates both a floor and a cycle; the floor's name, Floor 1204, has not been separated from the cycle's in any subsequent recension.

Floor 1204

Floor 1204 is a single north lightwell and a landing, catalogued as a floor under the numbering directive of Concordance 11. Its holdings consist chiefly of the cycle's records, which the Tower keeps there under the ordinary prohibition on moving records between the floor of their cycle and the floor of their number. The well is not railed on the eastern side, and the floor's own maintenance note of Cycle 4,217 records that the railing is to be avoided as a matter of clerical safety, on the ground that it has never existed.

  • Eleven sealed registers of the Long Seam.
  • The Bureau of Marginal Seals' memorandum, second copy, unstamped.
  • One unrailed railing (nonexistent).

Scholarly assessment

The Concordance of the Third Recension gives Cycle 1204 a duration of 91 years, 3 months and 4 days. The Concordance of the Fourth Recension gives 91 years, 3 months and 4 days, and notes, in the same entry, that the cycle could not have lasted that long. The discrepancy is not an error; the two recensions are in agreement, and the Tower has declined to regard agreement as a resolution.

Attention has lately shifted to the cycle's relation to the 126th Cycle and its successors, the 127th Cycle and 128th Cycle. Under the Concordance on the Ordering of Cycles these three are numbered sequentially, and a cycle numbered 1204 cannot intervene among them. The Bureau of the Cycle's Account therefore holds, against the Standard Temporal Commission, that Cycle 1204 did not intervene at all and that its records are those of an unnumbered interval. The Commission has not replied; its reply is expected to be numbered 1204.

Cycle 1204 has no successors in its own line. The Office of Cycle Registration has confirmed that the number 1204 will not be reissued, and that any subsequent cycle arriving at the number is to be entered as Cycle 1204 and filed apart. The provision has never been applied, and the standing register for its application runs to four volumes.

See also

Referenced by

Readers also asked

Cycle 232: how is it conducted?

Cycle 232 is the Administrative Cycle provisionally succeeding Cycle 231 within the Central Chronology of the Tower, ratified on 3 Script by the Standard Temporal Commission and presently held in abeyance pending the res…

Cycle 232
Cycle 231: how is it conducted?

Cycle 231 is the tenth principal calendrical period of the Tower's Standardized Chronology, directly following Cycle 230 and preceding Cycle 232. Spanning 717 standard Tower years, it is chiefly noted for the formalizati…

Cycle 231
Purging Cycle: how is it conducted?

"A cycle is that which begins and ends. A purging is that which is done within it. The two are not to be entered in the same column."

Purging Cycle
126th Cycle: what happened?

The 126th Cycle was an Administrative Cycle officially convened on 7 Fletching and concluded on 14 Vellum in its final year. Spanning 689 standard Tower years, it was the first cycle to be governed under the revised Spir…

126th Cycle

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.