Containment Theory Determination
MS 7117.48 · Documents and ordinances
The Containment Theory Determination is the standing instrument by which the Silent College assigns an interim Containment Theory classification to any phenomenon placed under Silence Protocol pending full survey. It is not, despite frequent confusion in the secondary literature, a determination about a containment theory; it is a determination that a containment theory must be assigned, and assigned in a particular form, before a surveyor may proceed. The document is issued on Form CT-2, is valid for one hundred and eleven days, and must be reissued rather than renewed. The College has never explained the number.
The Determination is administered from the College's Surveyor's Annex on floor 208 and is filed in triplicate with the Bureau of Counterfactual Logistics, though the Bureau has repeatedly stated in writing that it does not want the third copy.
Origin and the question of priority
The Determination descends from the curatorial settlement of Determination 44, which recognised that interstitial phenomena required a classifying authority distinct from the authority that described them. Determination 44 anticipated Procedural Determination 87-γ on precisely this question, and the College has always read the earlier instrument as assigning it the classifying role. The Sequencers dispute this, on the ground that a classification is a kind of precedence and that precedence is theirs to issue under the terms of Sequencers Determination 899 Balpha. The two offices have not resolved the matter and appear to have agreed not to.
What is not in dispute is that the Determination must be cross-referenced against the master echo typology map of The Echo Theory wherever the subject phenomenon is acoustic, and against the calibration tables of the Theory of Sympathetic Vectors wherever it is not. In practice most surveyors fill in both, on the reasoning that a phenomenon may be acoustic later.
Form and completion
Form CT-2 runs to four leaves. The surveyor records the phenomenon's designation, its Silence Protocol number, the floor of observation, and a provisional Containment Theory classification drawn from the closed schedule at Annex 2. The schedule is closed, which is to say no new classifications may be added to it; the College's position is that the existing ones have proved sufficient, and that phenomena which do not fit are fitting badly.
Annex 3 requires the surveyor to state, in not fewer than forty words, why the assigned classification is preferable to the one immediately above it in the schedule. This clause has caused more reissues than any other. Archivist-Proctor Vela recorded in the Annex register that in the winter of the year before last, a surveyor on floor 63 submitted eleven successive Forms CT-2 for a single resonance, each arguing the classification one step further down the schedule, and was eventually instructed to assign the phenomenon to no classification at all and to describe it instead. The description ran to two hundred pages and was never read.
Relation to Echo Theory and containment practice
Containment Theory is the framework under which the Silent College is understood to interpret the silence of The Quiet Forge and to administer the Silent Cypress protocol, and the Determination is the instrument that keeps the framework current. It is therefore the natural companion of Echo Theory, which remains the dominant framework within the Tower for the explanation of non-standard acoustic phenomena and the standard against which all containment actions are measured. Surveyors are reminded that a determination does not authorise containment. It authorises the classification that authorises the survey that will recommend containment. Sequencing these steps incorrectly voids the determination, and there is no appeal, though there is a form for it.
"No instrument of classification shall be construed as an instrument of action, nor any action deferred by its absence be construed as an action taken."
— Determination 188, Clause 6
Determination 188 is cited so often in this connection that the College's scriptorium keeps it set in standing type. Whether it supports the College's reading or the Sequencers' is the subject of the dispute described above.
The Threnody objection
The most sustained challenge to the Determination came from Aris Threnody, whose Determination on Inferred Holdings argued that a Containment Theory classification is itself an inferred holding and therefore cannot be assigned by the same office that will later hold it. Threnody's argument was accepted in part and rejected in part. The College now records the classification in a separate hand from the surveyor's, a practice known as the second hand, which has in practice meant the same clerk writing more slowly.
Threnody's further submission — that the schedule at Annex 2 should be opened — was rejected on the ground that the schedule has never been closed by any instrument the College can now locate, and that reopening something not closed would be irregular. A note appended to the Annex register in a later hand observes only that the question has been referred, and that the referral stands.
Inventory of the Annex cupboard
The Surveyor's Annex cupboard, inventoried on the last day of each quarter, presently contains:
- Blank Forms CT-2, unsealed, 1,400 (approx.)
- Forms CT-2, sealed in error, 212
- One box of red tape, the blue tape having been discontinued by the College
- The 63-floor resonance file, two hundred pages, unread
- A brass rule, 14 inches, for the measurement of apertures (the 16-inch rule having been withdrawn)
The cupboard may not be used for storage of determinations awaiting reissue. Determinations awaiting reissue are stored in the cupboard.
See also
-
MS 4943.23
Chen Protocol Determination
Chen Protocol Determination is the standing ruling of the Tower whereby material recovered through a Descent Protocol expedition i…
-
MS 4517.35
College of Luminous Anomalies
The College of Luminous Anomalies is a recognized subsidiary body of the College of Spacial Jurisprudence, established to administ…
-
MS 6548.40
Protocol 5-Echo (Containment)
Protocol 5-Echo (Containment) is the standing instrument governing the treatment of echo phenomena adjudged too faint to warrant f…
-
MS 1138.53
Department of Mineralogical Aberrations
The Department of Mineralogical Aberrations is the administrative division within the Silent College mandated with the identificat…
-
MS 9374.08
Containment Protocol Assignment
Containment Protocol Assignment is the administrative act by which a catalogued subject, on being entered into the holdings, is bo…
-
MS 7972.13
College of Taxonomical Mercy
The College of Taxonomical Mercy is a chartered body of the Tower Administrative College empowered to grant relief from the full c…
Referenced by
- MS 5417.12 Silence Protocol
- MS 9396.13 Determination 204
- MS 4987.37 Silent College Body
- MS 6479.50 Sequencer's Determination
- MS 1553.17 The Silent Divergence Theory
- MS 1214.06 Displacement Theory
- MS 2284.26 Sequestering Determination
- MS 3913.48 Class-B (Counterfactual)
- MS 1028.27 Determination of Baseline Jurisdiction (Jb)
Readers also asked
Silent Cypress protocol: how is it conducted?
The Silent Cypress protocol is a ceremonial and administrative procedure defined in Clause 17-Δ of the Third Concordance for the containment, study, or retirement of procedural knowledge deemed dangerous, obsolete, or af…
Silent Cypress protocolSilent College: who are they?
The Silent College is the administrative body chartered by the terms of the Inkwell Concordance to oversee all cataloguing operations involving non-vocalized, non-standard, or conceptually attenuated referents. Headquart…
Silent CollegeThe Quiet Forge: where is it?
The Quiet Forge is the designated archival repository and training facility for processes of industrial manufacturing that have been formally suppressed, redacted, or otherwise removed from active memory. It occupies the…
The Quiet ForgeSilence Protocol: how is it conducted?
Silence Protocol refers to the formal governance framework established by the Silence Edict for all interactions involving designated Silent Column apparatuses, tacit-bound media, or quanta of sanctioned quiet. Its proce…
Silence ProtocolPassages cited from this record
-
No instrument of classification shall be construed as an instrument of action, nor any action deferred by its absence be construed as an action taken.
Determination 188, Clause 6
Because you consulted