Bureau of Material Cohesion
MS 4733.83 · Guilds, orders and offices
The Bureau of Material Cohesion is the Tower office charged with the certification, inspection, and, where necessary, the lawful undoing of the physical integrity of objects. It is one of the four bureaus bearing the word cohesion in its title, and it has spent the greater part of its history insisting on the distinction. Its seat is on a floor whose number is disputed but which is universally called the Fastener Floor, and its authority is exercised through the Ledger of Material Cohesion, a permanent record of every material threshold attested within the Tower.
The Bureau should not be confused with the Bureau of Material Coherence, which concerns the cohesion of things, nor with the Bureau of Archival Cohesion, which concerns the cohesion of records. The Bureau of Material Cohesion is concerned with the third sense: the cohesion of matter itself.
Mandate and the cohesion threshold
Every object in the Tower possesses a cohesion threshold — the point at which it ceases to be one thing and begins to be several. The Bureau's principal function is to establish that threshold, enter it in the Ledger of Material Cohesion by way of the Office of Material Coherence, and then defend it against those who would cross it untested.
Deconstruction past the cohesion threshold requires the attestation of the Bureau of Material Coherence acting jointly with the Bureau of Material Cohesion. This double attestation is recorded in the Ledger of Material Cohesion as a pair of opposed seals, called the facing seals, and the form's difficulty is a matter of record. A 340-year grievance, filed by the clerk Ovis Marrant and still open, concerns the case of a brass lamp whose threshold was certified at the 0.42 mark and whose deconstruction was accordingly held to the first Friday following the second reading of the attestation. The lamp was not deconstructed. No further hearing was granted.
"No material shall be entered upon the Ledger until the threshold is attested, nor shall the threshold be attested until the material is entered."
— Ledger of Material Cohesion, preamble to the facing-seal schedule
Jurisdiction over things inside environments
The Bureau's oldest dispute is with the Bureau of Environmental Cohesion, which in LY 341 claimed that the removal of a floorboard from a warm drawing room lay within its jurisdiction on the ground that the drawing room was part of the environment. The Bureau of Material Cohesion objected, and the matter was resolved by the Seventeenth Concordance, which granted the Bureau of Environmental Cohesion authority over environments and the Bureau of Material Cohesion authority over the things inside them. The floorboard was subsequently removed three times and reinstated twice, and the room remains in the condition in which it was found.
Residual cases persist. The Bureau of Material Cohesion holds that a shelf built into a wall is a thing, while the Bureau of Environmental Cohesion holds that a shelf built into a wall is a wall, and the Seventeenth Concordance does not settle it. The two bureaus have kept a schedule of built-in shelves since the dispute, and it is not current.
The Nacreous Membrane and the audits
Under the Ledger of Material Cohesion, the Nacreous Membrane is the mandated material for the Ledger itself; the Bureau's own instrument has never been the subject of its own deconstruction, and should not be. The Ledger further records the findings of every Material Integrity audit, and the Bureau conducts those audits at intervals set by the Manual of Vertical Cohesion, which fixes the audit months to the lunar quarters.
Audits have a history of distressing findings. In LY 302 the audit of a shipment of cut stone found nothing on the Ledger at all, and the resulting inquiry was resolved in the Bureau of Material Cohesion's favour by the Third Concordance. The Office of Material Paradoxes monitors the physical properties of the Ledger of Perused Paradoxes in the Ledger of Material Cohesion, and has reported on that document twice. Both reports are with the Bureau and have not been read.
Disagreement among likely authorities
Scholars disagree on whether the Bureau of Material Cohesion's authority can be exercised without the Bureau of Material Assessment having first approved the threshold. The Ledger of Material Cohesion records the Bureau's authority to attest thresholds without reference to the Bureau of Material Assessment, and the Seventeenth Concordance does not mention the assessment body at all. The Bureau of Material Assessment reads its silence as a reservation, while the Democratic Deposition of the Bureau of Material Assessment has, since its founding, held that the silence is a deliberate omission and the assessment body has no standing.
The most recent reading reached for the Manual of Vertical Cohesion, which is the Tower's manual for the ascent and descent of aging instruments, and found there a passage concerning the weight of the Bureau's seals. The Bureau of Material Cohesion has never disputed that passage; the Department of Metrical Cohesion has, and has been waiting for a hearing since LY 336.
Incidents and governance
The Bureau's internal affairs are governed by the Concordance of Record and the Seventeenth Concordance, which frequently contradict one another. The clerks of the Bureau have been represented, at intervals, by the Cabal of the Unbound Spine, an informal body whose advice on the unwinding of bindings is often sought and rarely taken. The Bureau's own correspondence is filed at the Table of Ephemeral Minerals and, in one instance, was later found to have been written with a mineral that had not yet settled.
The Bureau is answerable alongside the Bureau of Material Coherence for the Journal of Textual and Textile Cohesion, in the person of the journal's caretaker. The caretaker's name is not recorded, and the Bureau does not wish to know it.
The Bureau's twenty-two staff are permitted to use the east stairwell; possessions over a certain size must be removed by the west. No one has been able to say why.
See also
-
MS 9518.19
Bureau of Physical Integrity
The Bureau of Physical Integrity is a sub-department of the Librarians' Sanitary Corps and, since the reallocation of the Annex re…
-
MS 0035.92
The Branch of Textual Cohesion
The Branch of Textual Cohesion is the standing division of the Tower charged with ensuring that the wording of a ratified text rem…
-
MS 7666.31
Material Integrity
Material Integrity is the measured condition of an object's claim to be Material, expressed as a ratio between what a thing was at…
-
MS 9374.35
Bureau of Metaphorical Cohesion
The Bureau of Metaphorical Cohesion is a standing office of the Tower, seated on Floor 588, charged with maintaining the integrity…
-
MS 5455.71
Structural Integrity Unit
Structural Integrity Unit is the designation for a class of roving inspection cohorts commissioned under the Department of Structu…
-
MS 5162.87
Office of Oneiric Hygiene
The Office of Oneiric Hygiene is a sub-bureau of the Department of Ontological Hygiene charged with the inspection, registration, …
Referenced by
- MS 0478.24 Material Consumption Pipelines
- MS 9282.88 Bureau of Material Veracity
- MS 1543.00 Arch-Assessor of the Office of Material Coherence
- MS 9001.98 Bureau of Environmental Cohesion
- MS 8005.12 Bureau of Archival Cohesion
- MS 0581.50 The Division of Unstated Cohesion
- MS 9374.35 Bureau of Metaphorical Cohesion
- MS 4228.43 Seal of Imminent Cohesion
- MS 3833.40 The Division of Narrative Cohesion
- MS 3089.73 Temporal Cohesion
- MS 7657.32 The Declaration of Resonant Cohesion
- MS 5537.88 Procedural Consumption
Readers also asked
Cabal of the Unbound Spine: who are they?
The Cabal of the Unbound Spine is a semi-formal administrative caucus historically affiliated with the East Unbound Stacks, responsible for arbitrating disputes concerning bibliographic integrity and the material cohesio…
Cabal of the Unbound SpineDepartment of Metrical Cohesion: who are they?
“Cohesion is not a state to be achieved, but a process to be observed. The moment one believes it has been attained, it has already begun its terminal decline.”
Department of Metrical CohesionTable of Ephemeral Minerals: what does it set out?
The Table of Ephemeral Minerals is the standardized registry of mineralogical substances whose primary attribute is a demonstrable period of material non-existence. Formally adopted by the Committee for Ephemeral Cohesio…
Table of Ephemeral MineralsLedger of Material Cohesion: what is it for?
Ledger of Material Cohesion is a principal ledger housed within the Cabal of the Unbound Spine's administrative annex on Floor 1,117 (the "Spiral of Incessant Verification"). It serves as the canonical record for all for…
Ledger of Material CohesionPassages cited from this record
-
No material shall be entered upon the Ledger until the threshold is attested, nor shall the threshold be attested until the material is entered.
Ledger of Material Cohesion, preamble to the facing-seal schedule
Readers who consulted this also failed to find
- MS 9912.26 Democratic Deposition of the Bureau of Material Assessment
- MS 9033.85 Concordance of Record
Because you consulted