The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Annex G (Contingencies)

MS 9049.45 · Documents and ordinances

Annex G (Contingencies) is the designation given to a body of supplementary rulings appended to the Third Concordance in the winter of the year recorded in the archive as 11-R-4, concerning the disposition of anomalies that fail to resolve under ordinary Environmental Contingencies. It is the shortest annex in the Third Concordance and the most frequently litigated. Unlike its neighbours, which enumerate procedures, Annex G enumerates what may be done when no procedure applies — a distinction the Bureau of Objective Measures has twice sought to have struck out and twice been refused.

Origin and drafting

Annex G was not drafted in a scriptorium. Its text survives as eleven marginal notes in the hand of Archivist-Third Class Ovell Marrant, entered against the draft of the Third Concordance's main body during the revision season of 11-R-4, and adopted wholesale by the Canonical Recension Committee when the fair copy was assembled. The Committee's minutes record the adoption in four words: "The margin is entered."

Marrant's notes concerned a recurring difficulty. Contingencies properly declared by the Department of Environmental Consistency could be corrected, mitigated, or managed, but a small class of them resisted all three verbs. Marrant proposed a fourth: tolerated. The Department objected at the time and has objected at intervals ever since, on the ground that tolerance is not an intervention and therefore not within its competence to authorize. Annex G does not resolve this objection. It records it, at G.4, and proceeds.

Structure

Annex G is numbered not in clauses but in postures, four in total, each stating a condition under which a contingency may be held rather than answered. Posture One applies where the anomaly is stationary and has been stationary for longer than the tenure of the officer observing it. Posture Two applies where intervention has already been attempted at least once and the attempt is not on record. Postures Three and Four are identical in wording and are known generally as the Twin Postures; the Office of Definitive Measures maintains that the duplication is a scribal error, while the Canonical Recension Committee has ruled twice that it is deliberate and once, in 14-R-2, that it is neither.

The operative sentence of the annex, and the source of nearly all its difficulty, is the following:

"A contingency held under Posture One or Posture Two shall be entered in the register as though resolved, and shall not thereafter be distinguished from a resolved contingency except upon application."

— Third Concordance, Annex G, Posture Two, second recension

The application mentioned has no specified form, no filing office, and no deadline. It has been made eleven times.

The Vane application and the ruling of 19-R-6

In 19-R-6 a custodian at Aperture 77-Gamma — Elara Vane, then Archivist-Second Class and not yet Registrar — applied to distinguish a held contingency from a resolved one, on the ground that the two had begun to share a shelf mark. The Librarians' Works & Maintenance Guild had reassigned the mark on the understanding that the contingency was resolved; the register, following Annex G, agreed; the anomaly itself did not. Vane's application was granted, with the ruling that where a held contingency and a resolved contingency occupy the same mark, the held contingency takes precedence, "the anomaly being the older resident."

The ruling is now cited routinely in shelf disputes and has been extended by analogy to two porter's closets on the ninth landing. The Department of Environmental Consistency has declined to comment on the extension.

Conflict with Annex 5-G

Annex G is frequently confused with Annex 5-G, and the confusion is not always innocent. Annex 5-G governs load-bearing contingencies and was appended to Article VII by the Ordinance on Rotational Infrastructure; it has no connection to tolerance, posture, or margin. Nevertheless, the two have been cited interchangeably in at least forty-one filings, and in 21-R-3 a Sequencer accepted the substitution on the reasoning that "the numeral is not the substance." Tier 1: Documented Contingencies presumes good faith unless a sequence of copying has been established, and no sequence was established. The Department's protest was docketed and then, by an administrative error nobody has been willing to reverse, docketed again.

Practical notes

Officers invoking Annex G are asked to note the posture by number in the margin and not in the body of the entry, so that the body may remain legible to a reader who has not read the annex. Ink of a colour distinct from the register's is not permitted below the third gallery. Marrant's own marginal hand was violet, and the Committee has since ruled that violet is reserved.

Annex G has never been amended. It has been suspended twice, in 12-R-1 and 16-R-9, both times for a period of nine days and both times by offices that had no authority to do so. The suspensions are nonetheless recorded as valid, on the doctrine that a suspension unopposed is a suspension.

See also

Referenced by

Readers also asked

Annex 5-G: where is it?

Annex 5-G is a lateral storage holding of the Tower situated between the unnumbered spiral of Annex 4 and the recension corridor of Annex 7-γ, catalogued under the designation "Five-Gamma" in the Second Concordance, Anne…

Annex 5-G
Department of Environmental Consistency: how is it conducted?

The Department of Environmental Consistency is the Tower body charged with the authorization of Environmental Stasis Fields, the declaration of Environmental Contingencies, and the oversight of the Environmental Control …

Department of Environmental Consistency
Ordinance on Rotational Infrastructure: what does it set out?

The Ordinance on Rotational Infrastructure, formally catalogued as Ordinance 82.Δ, is the primary regulatory and classificatory framework governing all non-linear vertical transitways and helically-arranged archival spac…

Ordinance on Rotational Infrastructure
Third Concordance: what does it set out?

The Third Concordance is the foundational regulatory document governing the Librarianate's procedures for the classification, verification, and archival of non-existent subjects. Ratified in Year 12 of the Second Librari…

Third Concordance

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.