Vellum Gallery
MS 8562.84 · Places and structures
The Vellum Gallery is any of a class of long, north-lit corridors in which bound and unbound vellum is displayed, examined, and shelved pending transfer to a Vellum Rotunda or the Vellum Stacks. A Vellum Gallery is distinguished from a gallery that merely holds vellum by the presence of a Tracing Rail, a continuous brass rail at the height of 1.14 metres from which sheets are suspended for inspection. Galleries without a rail are classified as storage and are not counted toward the quorum of any Vellum & Ink Conservatory inspection.
There are, at the last complete count of 3E:1189, forty-one Vellum Galleries, of which nine are closed, four are disputed, and one (Floor 87) is listed in the Register of Gallery Names under a name that no longer appears on its door.
Construction and the rail standard
The Tracing Rail was fixed as a standard by the Concordance of Rail Heights in 2E:604, following forty years of complaint from the Grinding Clerks of the Ninth Gallery, who held that sheets hung above 1.16 metres could not be read without craning and sheets hung below 1.09 metres dragged on the floor. The Concordance settled on 1.14 metres and has never been reopened, though a minority report appended to it notes that the ninth gallery measures 1.13 metres on the east wall and has done since the wall was re-laid.
Lighting is north only. Galleries fitted with south lights were decommissioned as a class after the Bleaching of 2E:771, in which eleven months of shelved vellum in the second gallery lost its surface to a window that had been added by mistake. The window was not removed. It was bricked from the inside and the brickwork is now listed as a fitting.
Administration
Each Vellum Gallery is governed by the Vellum & Ink Conservatory under the same instruments as a Vellum Rotunda, save that the Conservatory appoints a Gallery Warden rather than a Rotunda Keeper. The Warden holds the rail keys, the light shutters, and the gallery's copy of the Schedule of Tracings. Wardens are appointed for eleven years and are not permitted to serve in the gallery they trained in.
Grinding is carried out in the galleries so designated under the Grinding Calendar of the Ninth Gallery; the clerks grind between the fourth and eleventh of each month and the gallery is closed to inspection for the duration. The smell is described in the Conservatory's own annual return as "mineral, and not a fault."
Vellum entering a gallery is recorded in the Register of Gallery Names under the gallery's current name, and it is this register, not the door, that controls. Floor 87 was recorded as "the Vellum Galleries (Minor)" until 3E:1174, when an amendment struck the parenthetical. The door still reads Vellum Galleries (Minor). The Warden of Floor 87 has petitioned four times for the door to be repainted; the petitions are held in good order and have not been heard.
Vellum Descent in the galleries
Vellum leaving a gallery downward is surrendered for audit under Vellum Descent regulations at the gallery threshold, not at the Rotunda, a point settled in 3E:1042 after a dispute in which the Keeper of the Lower Rotunda argued that the audit point was the Rotunda door. The Conservatory found against the Keeper and charged the gallery the cost of the audit desk, which is still in place and which nobody uses because the desk blocks the rail.
"Surrender shall be made at the threshold of the gallery from which the holding descends, and not otherwise."
— Vellum Descent Regulations, clause 9 (as amended 3E:1042)
Sheets of Vellum Grade 4 are additionally subject to Vellum Recusal while on the rail, and the Warden must be present in person. This is observed unevenly. The Warden of the fourth gallery has not attended a Recusal since 3E:1181 and has submitted a medical certificate each year, which the Conservatory accepts.
Disputes
Two Concordances conflict on whether a Vellum Gallery may hold True Vellum. The Second Concordance, Annex 2, excludes it absolutely: "No gallery shall receive that which the Rotundas reserve." The Fifth Concordance, Annex 2, permits it in galleries of more than thirty metres, of which there are six. The Conservatory has declined to resolve the conflict, observing in 3E:1163 that "both instruments remain in force and neither has been read in full by this office."
The practical consequence fell on the sixth gallery, which received four sheets of True Vellum in the winter of 3E:1166 and held them for two years before anyone noticed. The sheets were returned to the Central Vellum Repository; the gallery was reclassified as thirty metres or over, then reclassified back when the surveyor admitted he had measured the corridor beyond the door. The surveyor's name is not recorded. His correction is.
Access
Readers may consult a gallery on production of a Tracing Warrant. Overcoats are left at the door and are not brought inside. Sheets may not be carried along the rail; the trolleys are for that, and there are seven, of which five work.
Galleries are closed on the fourth and eleventh, and on the grinding days between them, and during the annual inspection, and whenever the shutters are drawn for the light. Inquiries about a closed gallery should be addressed to the Warden, who is not obliged to answer, and often does not.
See also
-
MS 4709.18
Gallery of Spent Delimiters
The Gallery of Spent Delimiters is a long, unlit gallery on Floor 2,308 in which are displayed the exhausted, retired, and formall…
-
MS 0963.43
Lexical
Lexical is a raised reading gallery of the Guild of Lexical Scrutineers, nine bays long, maintained on the understanding that a wo…
-
MS 6376.77
Title III: Archival Precedence
Title III: Archival Precedence is the third title of the Forty-Second Concordance and governs the order in which holdings of equal…
-
MS 4196.79
The East Unbound Stacks
The East Unbound Stacks are a classified administrative sector and contiguous physical annex of The Whispering Gallery, situated w…
-
MS 5807.49
Substantiary Corridors
The Substantiary Corridors are a class of passage distinguished from ordinary corridors not by their dimensions, their materials, …
-
MS 1292.45
Capillary Corridors
Capillary Corridors are transit passages of narrow bore through which the Tower's slower fluids are conducted between floors that …
Referenced by
- MS 0674.40 Cycle 230
- MS 0713.65 Vellum Original of the Third Concordance
- MS 1052.54 Vellum Quarter
Readers also asked
Vellum Descent: how is it conducted?
Vellum Descent refers to a specialized subset of Guided Descent protocols authorized exclusively for the inspection and preservation of the Nictitating Vellum artifacts housed within the Tower. These descents are governe…
Vellum DescentVellum Rotunda: where is it?
"The Vellum Rotunda admits vellum; it does not admit argument. Argument is conducted in the annuli."
Vellum RotundaVellum Amp Ink Conservatory: who are they?
The Vellum Amp Ink Conservatory is a conservatory of the Tower, coordinated by the Vellum Amp Ink Conservatory Administrative Spire and governing each Vellum Rotunda within its jurisdiction. It maintains standards for th…
Vellum Amp Ink ConservatoryVellum Recusal: how is it conducted?
Vellum Recusal is the suspension of a sheet of Vellum Grade 4 from evidentiary use on the ground that the sheet has been previously entered into a proceeding in which the adjudicating party held an interest. Unlike Recus…
Vellum RecusalPassages cited from this record
-
Surrender shall be made at the threshold of the gallery from which the holding descends, and not otherwise.
Vellum Descent Regulations, clause 9 (as amended 3E:1042)
Readers who consulted this also failed to find
- MS 1563.02 Grinding Clerks of the Ninth Gallery
- MS 3730.21 Concordance of Rail Heights
- MS 1255.90 Schedule of Tracings
- MS 4683.54 Grinding Calendar of the Ninth Gallery
Because you consulted