The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Stairwell of Silent Consensus

MS 2868.88 · Places and structures

Stairwell of Silent Consensus is the designated vertical passage connecting the lower vestibule of Floor 47-Omega to the unnumbered mezzanine of the Silent Consensus of Floor 48-A, utilised exclusively for the transit of persons adjudicating or observing matters under the Silent Consensus. Its existence is attested in the Third Concordance, Annex 9, though the same Concordance elsewhere describes it as "a corridor of intention rather than stone" (Third Concordance, Clause 12, Sub-clause γ). The Arbiters of Silent Consensus hold nominal custody of the stairwell, a responsibility disputed since CY 119 by the Cabal of the Silent Consensus.

Physical Description and Dimensions

The Stairwell of Silent Consensus comprises 214 treads of grey anhydrite, each 0.41 metres in depth and separated by a riser of 0.19 metres. Surveyors of the Bureau of Unanswered Questions recorded in CY 882 that the stairwell's total vertical extent measures 41.3 metres, a figure contested by the Buttresses of Consensus, which maintains a recension listing 47.0 metres and attributes the discrepancy to "the leaning of the Tower upon its own silence" (Buttresses of Consensus, Recension 3, Folio 11). The walls bear no inscription save a single aperture marked σ-7, through which the Aviary of Silent Consensus is audible but not visible. A visitor's rule, posted at the lower vestibule since CY 1,004, prohibits the carrying of unfurled maps beyond the thirteenth tread.

Jurisdictional History

Custody of the stairwell was first assigned to the Arbiters of Silent Consensus under the Silent Consensus of Floor 48-A, which authorised the body to "read the ascent as a finding" (Silent Consensus of Floor 48-A, Clause 2). In CY 104, during the Silent Fracture incident, access was briefly diverted through the Silent Stairs after a collapse of tread 88, an event the Arbiters of Silent Consensus declined to classify as structural, citing instead "a Consensus Second misapplied in the lower dark" (Arbiters of Silent Consensus, Minute 104-Δ). The Cabal of the Silent Consensus has since CY 119 filed forty-one separate objections to Arbiter oversight, principally on the ground that the Cabal was constituted to furnish recommendations the Silent Consensus of Floor 48-A is forbidden to receive, and therefore ought to control the passage by which such recommendations are silently not delivered.

In CY 5,188 the Arbiters of Silent Consensus declined to rule on the origin of the Silent Aviary, a decision recorded as having been reached "while seated upon the ninety-ninth tread" (Arbiters of Silent Consensus, Roll of Perch and Deliberation). The Diagram of the Silent Consensus depicts the stairwell as a lacuna, a deliberately empty node, in the Leymann Schematic; the Bureau of Unanswered Questions interprets this as evidence the stairwell is mapped only by its absence.

The Seven-Hour Consensus and Inaccessibility

During the Silent Consensus of CY 211, the Arbiters of Silent Consensus inspected the Consensus Stair, an action that rendered the Consensus Stair inaccessible for the duration of the Seven-Hour Consensus. Contemporary minutes note that persons bound for the Hall of Perfect Consensus were redirected via the Stairwell of Silent Consensus, which at that time admitted thirty-two visiting delegations whose roster remains held by the Aviary of Silent Consensus. The Senior Arbiters subsequently nominated candidates for the grade of Senior Arbiter on the basis of their conduct during the redirection, though the Criterion of Silent Consensus, administered jointly by the Arbiters and the Bureau of Unanswered Questions, was held not to apply to treads below the fiftieth.

Scholarly Disagreement

A standing dispute concerns whether the stairwell forms part of the Type II: Consensus-Dependent Halls. The Third Concordance asserts in Annex 9 that it does, while the Second Concordance, Clause 7, holds that "no stairwell may be a hall, being deficient in both length and intention of repose." The Arbiters of Silent Consensus have refused to settle the matter, noting in CY 1,447 that "the question partakes of the Silent Consensus and is therefore not a question" (Arbiters of Silent Consensus, Minute 1447-ω). Clerks of the Buttresses of Consensus counter that the dispute is merely a disagreement over measurement and that the stairwell's classification is irrelevant to the leaning of the Tower.

Maintenance and Present Condition

The lower vestibule is swept each Consensus Second by appointees of the Arbiters of Silent Consensus, a practice formalised in CY 990. Tread 88, repaired after the Silent Fracture incident, is replaced at intervals of nineteen years with stone quarried from the Buttresses of Consensus. A prohibition enacted in CY 1,203 forbids the sounding of the aviary bell within the stairwell; the Aviary of Silent Consensus records no violation, though the Cabal of the Silent Consensus alleges three unreported instances, none of which the Arbiters have acknowledged.

See also

Referenced by

Readers also asked

Hall of Perfect Consensus: where is it?

Hall of Perfect Consensus is a major administrative and deliberative chamber located on Floor 199, formally designated as the primary venue for the sessions of the Librarian Consensus. It is best known as the site of The…

Hall of Perfect Consensus
Aviary of Silent Consensus: where is it?

Aviary of Silent Consensus is the designation, confirmed under Fourth Concordance clause 12(vi), for the enclosed walk on Floor 883 that connects the vestibule of the Hall of Perfect Consensus to the aerie known as The A…

Aviary of Silent Consensus
Second Concordance: what does it set out?

The Second Concordance was the primary governance document of The Tower from Year 89 of the First Librarianate until its supersession by the Third Concordance in Year 12 of the Second Librarianate. It established the leg…

Second Concordance
Buttresses of Consensus: what is it for?

The Buttresses of Consensus are a series of architectural projections, formally recognized under Annex 7-C of the Pre-Consensus Voting Protocol, that provide non-structural support to the exterior walls of the Hall of Pe…

Buttresses of Consensus

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.