Reflective Treatment
MS 3327.92 · Practices and doctrines
Reflective Treatment is the collective body of protocols, prohibitions, and maintenance schedules governing surfaces within the Tower that return an image to the observer. It is administered jointly by the Bureau of Specular Hygiene and the Office of Surface Compliance, an arrangement that has been described in the Bureau's own annual return as "workable, and only that." The term is frequently confused with Vellum Treatment, which concerns the preparation of hides rather than the management of sheen, and with Acoustic Treatment, which addresses what a surface returns when the reader has brought no eyes to it. Reflective Treatment concerns the eye, the returned image, and the question — never fully settled — of who is responsible for the returned image once it has been seen.
The practice is ancient. The Concordance of Polished Threshholds (Concordance 218) fixed the first schedule of treatment for the Tower's stairwells in the ninth century of the current reckoning, on the principle that a landing which returns too clear an image of the ascending party encourages lingering. The schedule survives in amended form as Annex 3, and its opening clause is still cited in disputes: "No surface shall be brought to a finish in which a reader may mistake himself for a colleague" (Concordance 218, Annex 3, cl. i).
Grades of finish
Reflective Treatment recognizes four grades, ordered by the fidelity of the returned image rather than by gloss. Grade A returns a recognizable image and is permitted only in the Hall of Returning Portraits and in the vestibules of the Librarians' Refectory, where it is held to promote order at table. Grade B returns a discernible but unresolved image; it is the standard for reading rooms. Grade C returns light without form, and is the required finish for all holdings stored above Floor 14,000, where the air is dry and the temptation to inspect oneself is correspondingly high. Grade D is total diffusion and is reserved for the Chamber of the Unreturned, whose finish is checked each Quarterly Re-treatment by an inspector who is required to report the number of his own reflections and no other figure.
Surfaces catalogued as Reflective in the ordinary sense may nonetheless be held exempt. The single casting of Reflective Duralumin at The Gilded Lathe is finished to Grade A and has never been treated, on the grounds that its reflections are "somber and consonant with the work" (Office of Surface Compliance, memorandum of 14 Ventose).
The suppression of the Edict
Reflective Treatment is most often discussed in connection with the Edict of Vanity, whose treatment of personal reflective items — pocket glasses, hand mirrors, polished buckles worn at the collar — it was designed to enforce. The Edict was suppressed by Concordance 402 within eleven years of its promulgation, on the reasoning that its enforcement had produced a class of unpolished objects whose dullness itself invited scrutiny. The suppression did not repeal the grade schedule; it merely removed the penalty for carrying a Grade A object without a permit. The Bureau has twice petitioned for the Edict's restoration and twice been refused, most recently on the grounds that "the Tower does not require the return of an instrument it has already returned" (Concordance 402, Annex 6).
Incident at the Whispering Gallery
The most consequential dispute in the practice's history turned on whether sound may be treated under a statute framed for images. In the winter of the year 8,114 a sustained metallic tone was reported from the Whispering Gallery and taken by the resident clerk, Ovida Marren, as evidence of a reflective surface returning a voice to its speaker. Marren ordered the gallery's lower course stripped to Grade D, a treatment completed over nineteen days at a cost of four hundred and six measures of abrasive. Acoustic Treatment subsequently demonstrated that the tone was a section of ventilation duct contracting in cold weather.
Marren's order was not rescinded. The Dialogical School maintains that the stripping was correct in substance because the Gallery is "merely reflective" and would have produced such an effect eventually; the Bureau of Specular Hygiene maintains that a treatment performed on a false premise is a treatment not performed at all, and has since required every Grade D order to be countersigned by a second clerk. Marren's own position, filed as an annex to his annual return and never answered, is that the gallery had been asking for it.
Treatment of materials
Non Reflective Paper requires no treatment and is exempt by category. Tenebrous Paper is not exempt, being distinguished from Non Reflective Paper by an absence of light rather than a decline to reflect; the distinction is invisible in use and has generated a small permanent correspondence. Pensive Condensation is a special case, in that its droplets, once absorbed by a polished surface under the Principle of Reflective Imbuement, grant the surface an autonomous and somber reflection that cannot be reduced by abrasion and is therefore managed rather than treated. Recorded reflections of this kind are held in Specular Records and may not be consulted in a room finished above Grade C.
Contradiction in the record
Scholars remain divided on whether the grade schedule attaches to the surface or to the reader. Ancilla Vorrow of the Scriptorium of the Lower Stacks observes that Concordance 218 speaks throughout of the reader's perception and never of the object's finish, and concludes that treatment is a discipline of attention applied to persons. The Bureau's standing position, stated in every edition of its handbook, is that a surface is treated and a reader is merely advised. The disagreement is old, has never been referred for resolution, and shows no sign of resolving itself; the practice continues either way, and the stairwells are polished on schedule.
Visiting readers are reminded that the treatment of any surface they encounter is recorded on the accompanying docket and that dockets may not be removed from the floor of issuance.
See also
-
MS 2425.73
Standard Measurement Protocol Delta
Standard Measurement Protocol Delta is the collective designation for the family of metrological instruments, schedules and verifi…
-
MS 4693.19
Status Beta Protocols
Status Beta Protocols are the collective body of instruments — opinions, annexes, standing orders, and one disputed diagram — gove…
-
MS 7325.48
Type III: Echoic or Reflective Volumes
Type III: Echoic or Reflective Volumes constitutes the third and final class of the three-tier Echoic Classification established u…
-
MS 6083.42
Clerical Deployment Schedules
Clerical Deployment Schedules are the formalized timetables and protocols governing the assignment, rotation, and logistical provi…
-
MS 4778.57
Glow-Schedules
Glow-Schedules are the official, labyrinthine series of directives governing the maintenance, calibration, and ritualistic dimming…
-
MS 2065.80
Expansion Protocols
The '''Expansion Protocols''' are the standing body of instruments, schedules, and customary readings by which the Tower authorize…
Referenced by
- MS 4081.84 Acoustic Treatment
Readers also asked
Scriptorium of the Lower Stacks: where is it?
The Scriptorium of the Lower Stacks is the sealed archival house of the Lower Stacks, a subordinate scriptorium of the Lower Scriptorium and the sole custodian of the Annals of the Lower Stacks. It occupies the first thr…
Scriptorium of the Lower StacksSpecular Records: what does it set out?
Specular Records is the collective designation for the non-redundant catalogue of every mirror, reflective surface, and optical interface documented within the Tower. The Records are maintained under the authority of the…
Specular RecordsDialogical School: how is it conducted?
The School was formally codified on Floor 1,114 (the Whispering Gallery) following the Contest of the Redundant Gate. Its practitioners, known as Dialogists, argue that the Tower’s legal and administrative texts are not …
Dialogical SchoolConcordance 402: what does it set out?
Concordance 402 is a governing document of the Tower, issued for the settlement of floor-numbering disputes arising from the mid-recension renumbering. It is most frequently consulted for its annex on provisional designa…
Concordance 402Readers who consulted this also failed to find
- MS 1821.86 Office of Surface Compliance
- MS 2944.60 Hall of Returning Portraits
- MS 8658.85 Chamber of the Unreturned
- MS 5883.63 Ancilla Vorrow
Because you consulted