Post-Contagion Zoning
MS 2123.48 · Practices and doctrines
Post-Contagion Zoning is the regime of conceptual property assignment applied to a volume, room, or floor after a positive finding of Conceptual Contagion has been entered against it. It is distinguished from ordinary Conceptual Zoning chiefly by sequence: ordinary zoning assigns a conceptual property in advance of exposure, whereas post-contagion zoning assigns one in the aftermath, and must therefore contend with whatever the exposure has already done. The Conceptual Zoning Bureau administers both regimes, though under separate ledgers, and has maintained since 3 Elul 1104 that they are "continuous in principle and discontinuous in filing" (Bureau Memorandum 41-c, "On the Filing Discontinuity").
Origins
The practice is conventionaly dated to the winter of 1131, when a sealed reading room on the fourteenth landing of the eastern stack was found to have acquired, by adjacency alone, the argumentative habits of the treatise shelved beside it. The room had begun to concede points. Assessors of the Theoretical Jurisprudence Guild recorded that the room "yielded on first objection and yielded again on second," and that a chair within it had developed what the report calls "a provisional view." No holding in the room was itself contaminated; the contamination had settled into the room's arrangement, and no existing instrument could zone an arrangement. Contagion Assessment under the standing procedures of the Subcommittee on Epistemic Contagion returned a positive finding on the twenty-second of that month, and the Bureau was obliged to invent a zoning appropriate to it within nine days, the room having by then adopted a position on its own furnishing that it would not abandon.
The Two-Column Rule
Post-contagion zoning proceeds by the assignment of a residual property — the conceptual character a site is permitted to retain once its contaminated character has been segregated. Under Clause 4 of Second Concordance Annex Gamma, the residual property must be recorded in the same hand and on the same day as the finding that occasioned it. In practice the finding and the assignment are entered in facing columns, the left column recording what the site was, the right what it is now permitted to be, and the margin between them initialled by the seated assessor. Disputes arise over the margin. The Fourth Concordance, Annex 2, clause 9, holds that the margin is "of the record and not of the site," while the Seventh Concordance, clause 3, treats the margin as the operative instrument and the columns as commentary upon it. The Bureau has declined to resolve this, noting in Memorandum 41-c that "both readings produce the same filing."
"Where a site has been found contaminated, the assessor shall not extinguish the contamination, which is not within the assessor's power, but shall fix the site to a property adjacent to it, and record the fixing in the left column, and be at peace."
— Second Concordance Annex Gamma, Clause 5
Interaction with Acoustic and Conceptual Zoning
Post-contagion zoning must be coordinated with Acoustic Zoning, which governs who is permitted to hear a volume and is not altered by a contagion finding. The two regimes diverged badly in 1187, when a post-contagion assignment on the ninth floor of the western spiral silenced a room that had been acoustically zoned for open audition; the resulting complaint, filed by the room's subscribing auditors, was upheld on the ground that the Bureau had zoned the site's character without consulting its audibility. Since then the two offices exchange a schedule each quarter. The exchange is not audited.
Sites under post-contagion zoning are additionally subject to the Protocols for the Management of Dream-Space Incursions and Recursive Oneiric Contagion, which regulate Conceptual Contagion as a Class-3 Epistemic Hazard, and to the permeability limits set out in Zoning Permeability. Where a residual property is found to have crossed a boundary into a neighbouring holding, the matter is referred to Cross-Floor Contagion and the original assignment is suspended pending review. Suspension is common. Review is not.
The Kalder Incident
The clearest illustration of the regime's limits is the matter of Clerk Ondra Kalder, who in the spring of 1209 was assigned the post-contagion zoning of a stairwell between the twenty-second and twenty-third landings. Kalder recorded the residual property correctly, in the correct hand, on the correct day. He then recorded, in the margin, a personal observation to the effect that the stairwell "had always been like that." The observation was ruled a second assignment, the margin being operative under the Seventh Concordance, and the stairwell was consequently zoned twice: as a residual property by the left column and as an untreated original by the margin. Kalder's appeal to the Post of Recursive Oversight was returned unopened on the ground that it had been filed inside the site it concerned. He served out his tenure. The stairwell remains double-zoned and is not to be used before the eighth hour.
Criticism and the Reporting Requirement
The regime's critics hold that post-contagion zoning is a description dressed as a remedy, since it fixes a site's contaminated character in place rather than removing it. The Bureau does not contest this and has said so in writing. Its position, given in Memorandum 41-c, is that removal is not among the instruments available to it and that a documented description is preferable to an undocumented drift. The Behavioral Contagion Report has twice recommended that residual properties be reviewed at ten-year intervals; the recommendation is carried forward each decade without being acted upon, and the carry-forward is itself recorded.
Assignments are entered in the Bureau's post-contagion ledger, which is kept apart from the ordinary zoning roll and bound in a lighter card. Cardstock Laminates are not used in the post-contagion ledger and may not be brought into the ledger room.
See also
-
MS 0299.10
Ephemeral Oak
Ephemeral Oak is the collective designation applied by the Office of Ephemeral Cartography to oak timber that registers a positive…
-
MS 3757.71
Provisional Coefficient Assignment
Provisional Coefficient Assignment is the administrative procedure by which a coefficient is attached to a holding, floor, door, o…
-
MS 5860.99
Conceptual Fruiting
Conceptual Fruiting is the induced production of fungal bodies from conceptual rather than organic substrate, a practice distingui…
-
MS 9291.34
Quantifiability
Quantifiability is the property by which a catalogued subject admits of being counted, and it is distinguished in Tower doctrine f…
-
MS 4693.25
Conceptual Echo
Conceptual Echo is the residual conceptual signature remaining after a named subject, entity, or catalogue entry has been formally…
-
MS 4154.37
Calibrated Vacuum Measurement
Calibrated Vacuum Measurement is the branch of Procedural Vacuum Theory concerned with the assignment of numerical values to volum…
Referenced by
- MS 8508.05 Conceptual Contagion
- MS 0223.82 Epigraph Contagion of '73
- MS 7852.44 Environmental Contagion
Readers also asked
Seventh Concordance: what does it set out?
The Seventh Concordance is the primary administrative codex governing the measurement, classification, and cataloguing of phenomena defined by their absence, incompletion, or intrinsic paradox. Ratified in Year 47 of the…
Seventh ConcordanceConceptual Contagion: how is it conducted?
Conceptual Contagion (often abbreviated to C-Contagion or Class-Δ Infiltration) is the non-local propagation of a defined conceptual property or state between formally isolated holdings within the archival structure. It …
Conceptual ContagionTheoretical Jurisprudence Guild: who are they?
The Theoretical Jurisprudence Guild (TJG), formally inscribed as the Seventeenth Concordant Guild by the Third Concordance (Clause 4.2.α), is the primary administrative body within The Tower responsible for the formulati…
Theoretical Jurisprudence GuildCross-Floor Contagion: how is it conducted?
Cross-Floor Contagion is the propagation of a defined conceptual property or behavioural state between holdings situated on different floors of the Tower, in the absence of physical transfer. It is the operational subtyp…
Cross-Floor ContagionPassages cited from this record
-
Where a site has been found contaminated, the assessor shall not extinguish the contamination, which is not within the assessor's power, but shall fix the site to a property adjacent to it, and record the fixing in the left column, and be at peace.
Second Concordance Annex Gamma, Clause 5
Readers who consulted this also failed to find
- MS 0245.49 Subcommittee on Epistemic Contagion
Because you consulted