Phase Three: Determinative Report Synthesis
MS 1806.69 · Practices and doctrines
Phase Three: Determinative Report Synthesis is the third of the nine conventionally numbered phases of a Cartographic Synthesis, during which the findings assembled in Phase 2 are consolidated into a single Determinative Report and submitted to the Office of Determinative Documentation. It is the only phase of a Synthesis whose output is a document rather than a measurement, and consequently the only phase that may be reversed without disturbing the floor surveys on which the Synthesis rests.
The phase was not among the original seven phases set out in the Provisional Concordance of Phases, and its insertion between Triangulation and Phase Three: Publication — an ordering that has never been corrected, only annotated — remains the most-cited example of what the Office of Sequence Reconciliation calls a "productive disorder."
Procedure
Phase Three opens when the Triangulation surveyor's tallies have been sealed and countersigned, and not before; a tally sealed after the Synthesis Phase has commenced is entered as a fresh survey and the phase restarts, a circumstance recorded in the Synthesis Ledger under the heading "restarted at three." The compiling clerk works from the sealed tallies alone and is forbidden to consult the survey itself. This prohibition was introduced after the Winterscale Revision of Year 402, when a clerk at Floor 1,204 corrected a tally of eleven anomalous stairwells to nine on the strength of having personally walked the corridor, and the resulting report was contested for two years by the office he had corrected.
The Synthesis produces, in order: the consolidated finding; the conditions attached under part seven, where the finding is Conditionally Retained; and a closing declaration of which earlier phases are now closed by the act of synthesis. Where no finding can be reached, the clerk issues the phase as Undetermined and the Synthesis is suspended rather than closed, the record being marked with a Suspensory Knot that only the Office of Determinative Documentation may untie. In practice most knots are untied by the office that tied them, some years later, without comment.
The form of the consolidated finding is governed by Report Generation, which fixes the three possible verdicts and the typeface in which each is to be set. Clerks of the third grade are not permitted to set the word Verified; the word is entered by a clerk of the second grade or above, even where the compiling clerk has reached that verdict unaided. The Table of Permitted Hands lists the grade required for each verdict and is posted in the compiling rooms of Floors 1,190 to 1,210.
The Vernacular of the Phase
Phase Three is unlike the phases around it in that its terminology has passed into ordinary use within the Tower. A matter said to be "at three" is understood to be consolidated but not yet published, and a Synthesist who describes her work as "still compiling" is understood to be asking not to be disturbed. The Librarians' Almanac records the phrase "at three and holding" as early as Year 388, though the phase it names was not given a number until the Concordance of Nine Phases was recensed in Year 411.
"Let the third phase be the phase of the single sheet. Whatever the surveyor has measured, the compiling clerk sets down once, and that once is the finding."
— Concordance of Nine Phases, Annex 2, clause 9
That clause is quoted in almost every dispute touching the phase and is understood differently by almost every office that quotes it. The Bureau of Sealed Tallies holds that "once" means the report may not be revised after sealing, while the Office of Determinative Documentation maintains that "once" describes the sheet, not the number of times it may be written. The Dispute of the Twice-Written Sheet has run since Year 419 and has produced eleven recensions of the clause and no resolution.
Relation to the Synthesis Phase
A frequent point of confusion, addressed in the office's circular of Year 431, is the relationship between Phase Three and the Synthesis Phase. The latter is the fourth of the nine phases and begins only upon the closure of Comparative Synthesis, whereas Phase Three concerns the drafting of findings, not their reconciliation. The circular's author, Sub-Librarian Ovett Marrant, conceded that the two names "invite the error, and will continue to do so while both remain in the register." No renaming has been attempted since the Renaming of Phase Four was withdrawn in Year 396 after nine days.
The Synthesis Ledger nonetheless records Phase Three durations alongside those of the Synthesis Phase, and the median Phase Three duration of eleven days is frequently misreported in secondary inventories as the median Synthesis Phase duration, which is longer and disputed. The office has declined to separate the columns on the grounds that separation would require renumbering the pages.
Notable Reports
The most studied output of the phase is DR-712-Ω, concerning the Chen Ephemera, whose consolidated finding was Ontologically Unsound and whose part seven was left entirely blank. The blank was ruled deliberate in Year 713 by the Office of Determinative Documentation, which held that a condition may not be attached to a retirement that no one intends to contest. Determinative Report 811-Alpha, by contrast, emerged from a Phase Three that ran for one hundred and four days and closed with the finding Verified against the compiling clerk's written objection, which was bound into the report and is now read more often than the report itself.
The shortest recorded Phase Three closed in a single morning on Floor 1,204 in the winter of Year 446; the compiling clerk, Nissa Hault, had been handed a tally already consolidated by her predecessor and issued it unchanged under her own seal. The Determinative Report it produced is unremarkable. Hault's covering note — "Nothing was added, and nothing needed to be" — is preserved in the Archive of Marginalia and is the only item in that collection filed under procedure rather than sentiment.
Disputed Points
Whether Phase Three may run concurrently with the Synthesis Phase is the phase's oldest open question. The Bureau of Sealed Tallies holds that it may not, on the authority of Concordance of Nine Phases, Annex 2, clause 11, which forbids "the setting down of conclusions while reconciliation is in hand." The Office of Determinative Documentation holds that clause 11 governs findings arising from Derivative Synthesis and not from original survey, citing the Fourth Concordance, Annex 6, which makes no mention of Phase Three at all and is therefore, in the office's reading, permissive. Both annexes are in force. Neither has been amended to address the other.
A narrower dispute concerns the seal. Determinative Reports issued from Phase Three bear the compiling clerk's seal and the office's counter-seal, in that order, and the Ordinance of Precedence in Sealing has been read since Year 380 to require the reverse. The Seal Office stamps to the ordinance; the Office of Determinative Documentation stamps to its own circular of Year 402. Reports bearing the disputed order are accepted everywhere and are held, by a ruling of Year 455, to be Verified notwithstanding.
See also
-
MS 9287.43
Phase 1 (Cartographic Lock)
Phase 1 (Cartographic Lock) is the first conventionally numbered phase of a Cartographic Synthesis, and the point at which the sur…
-
MS 4746.19
Material Findings
Material Findings are a class of Bureau Findings concerning the physical inventory of the Tower: the presence, composition, dimens…
-
MS 9064.89
Document Synthesis
Document Synthesis is the procedure by which two or more Tower records, each internally valid, are reconciled into a single instru…
-
MS 8536.56
Concordance Synthesis
Concordance Synthesis is the practice of producing a Cartographic Synthesis in which the governing authority of the resulting reco…
-
MS 4960.34
Concordance Findings
Concordance Findings are the class of Bureau Findings issued when a numbered Concordance document is discovered to be in contradic…
-
MS 8850.19
Bureau of Cartographic Standards
The Bureau of Cartographic Standards is the regulatory authority responsible for the establishment, maintenance, and enforcement o…
Referenced by
- MS 5875.59 Quarterly Review of Archival Vigilance
Readers also asked
Determinative Report: what does it set out?
Report Generation: how is it conducted?
Report Generation is the administrative process by which observed conditions within the Tower are converted into numbered, sealed, and filed documents. It is distinguished from mere writing by three requirements set out …
Report GenerationComparative Synthesis: how is it conducted?
The procedure is administered by the Bureau of Cartographic Standards, which maintains dedicated Synthesis Chambers on Floors Ξ-7 through Ξ-9. A typical Comparative Synthesis involves a panel of three certified Synthesis…
Comparative SynthesisDerivative Synthesis: how is it conducted?
Derivative Synthesis is the practice of producing a synthesis from the output of another synthesis without a fresh traversal of the source floor. It is permitted, ubiquitous, and — according to the Ninth Concordance, Ann…
Derivative SynthesisPassages cited from this record
-
Let the third phase be the phase of the single sheet. Whatever the surveyor has measured, the compiling clerk sets down once, and that once is the finding.
Concordance of Nine Phases, Annex 2, clause 9
Readers who consulted this also failed to find
- MS 0993.08 Winterscale Revision
- MS 1954.05 Bureau of Sealed Tallies
- MS 5250.59 DR-712-Ω
- MS 3265.07 Ovett Marrant
Because you consulted