The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Field E

MS 5346.53 · Places and structures

Field E is a classified containment expanse of the Status Field class, entered on the register of the Directorate of Field Verification as Holding 40-E and administered, since a reassignment of competences in the winter of the year recorded as 8-C, by the Office of Unstable Grounds. Unlike Field A, which is propagated deliberately and measured on demand, Field E is not known to have been opened. It is recorded because it cannot be closed.

The field occupies a disused service corridor on Floor 40 and the anteroom that gives onto it. It was first entered in the Field Ledgers in the third quarter of that year by the surveyor Ennet Vole, whose entry describes "an expanse of admissible width and inadmissible duration." Vole's instrument rated the field at a working depth of nine paces; the corridor is four paces long. No subsequent surveyor has produced a figure that duplicates his, and the Directorate has declined to strike the original entry on the grounds that it was taken under proper conditions and the instrument was afterward destroyed in a manner the Directorate has not seen fit to describe.

Physical description and the boundary question

Field E presents no visible margin. Field Markers set at its perimeter in the ordinary way report field strength that rises with distance from the marked line and falls again beyond it, so that a technician standing well outside the boundary may register a reading higher than one standing within. This behaviour is common to concessive boundaries and would not by itself warrant a separate holding; what distinguishes Field E is that the readings do not resolve to a null at any distance tested. Two markers carried to Floor 61 and one to Floor 84 returned readings of 2.1, 2.1 and 2.0 CU respectively, which is within tolerance of the value obtained at the corridor door.

Threshold dampening has been attempted at the corridor mouth on four occasions. On each occasion the dampening apparatus registered a successful seal. On each occasion the following morning the seal was found intact and the readings unchanged. The Directorate's position, restated in every annual return since, is that Field E is "presently bounded, correctly marked, and not in need of further intervention" (Directorate of Field Verification, Annual Return 40-E, Schedule 2).

Field Assessment history

Field E has been the subject of eleven Field Assessment exercises, the most recent under the aegis of the Directorate in the year recorded as 14-C. The first, conducted in 9-C under the evidentiary primacy rules set out in the Field Ledgers, returned a report of two pages. The second, in 10-C, returned a report of one hundred and six pages, of which ninety-four concern the anteroom. The third assessment was abandoned when the assessment party could not agree on how many persons had been dispatched to conduct it.

The Directorate's published guidance now requires that Field Assessment parties entering Field E be composed of an odd number of assessors and that the party be counted aloud at the door and again at the exit. The rule is attributed to the acting registrar Coriander Hesp, who in 11-C recorded that a party of four had returned as five and that the fifth had signed the attendance roll in a hand matching no member present. Hesp's minute observes, without further comment, that the additional assessor had signed correctly and in the right column. The Field Note Standard was amended the following spring to require that the signature be retained in the record even where the signatory cannot be identified, and that it not be counted toward the quorum.

"The fifth signature is to be preserved, filed under the party's own name, and not read aloud at the next assessment."

— Field Note Standard, Amendment 7, clause 3

Dispute between the Concordances

The legal character of Field E is contested between two instruments of Concordance that have never been reconciled. The Fourth Concordance, Annex 9, holds that a field which cannot be shown to have been opened is not a field but an "unclosed condition," and that unclosed conditions fall to the Office of Unstable Grounds for maintenance only, without assessment. The Ninth Concordance, Annex 2, holds by contrast that any expanse returning consistent readings across three or more floors is a field of standing, and is to be assessed on the ordinary schedule regardless of origin.

The contradiction was raised formally by Vole's successor, the surveyor Marten Quill, who in 12-C petitioned for a ruling and was advised by the Bureau of Concordance that both annexes remained in force and that he should proceed under whichever was "nearer to hand." Quill proceeded under the Ninth, was assessed twice in one quarter, and afterward petitioned for a ruling again. The Bureau's second reply is identical to its first, save that the phrase "nearer to hand" is replaced by "more readily produced."

Incidents and current standing

In 13-C a maintenance party of the Office of Unstable Grounds entered the corridor to replace a lamp and emerged, by their own account, at once. The lamp was found replaced. The party's timekeeping slip, however, recorded an interval of eleven days, and the wages clerk declined to authorize payment for the difference on the grounds that the men had not been absent from the roll. The Office paid them from its own contingency and recorded the sum against Field E. It has done so in every year since, always for the lamp, which is replaced annually and is never found to need it.

Field E remains on the register, correctly marked, and is inspected each year on the anniversary of Vole's entry. Visitors are asked not to bring a second lamp.

See also

Referenced by

Readers also asked

Field Markers: what is it for?

Field Markers are standardized, non-resonant architectural fixtures used to demarcate the operational boundaries of a Status Field. Fabricated from inert grade-attenuated echo-glass or sintered pumice, they serve as the …

Field Markers
Ninth Concordance: what does it set out?

The Ninth Concordance is the ninth of the thirteen principal legislative and administrative codes governing operations within the Tower. Ratified on 12 Nisan in the Year of the Ninth Librarian in the immediate aftermath …

Ninth Concordance
Field Ledgers: what does it set out?

Field Ledgers are the official, portable notebooks issued by the Directorate of Field Verification for the documentation of observations, measurements, and phenomenological events during authorized expeditions. Construct…

Field Ledgers
Status Field: how is it conducted?

Status Field is the standardized protocol for marking a volume of Tower space as having undergone, or being under, a specific verification and hazard-containment regimen. It is distinct from a Verified Permanence designa…

Status Field

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.