The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Epsilon () Permits

MS 2945.11 · Documents and ordinances

Epsilon () Permits are a class of movement instrument issued within the Epsilon administrative cluster, distinct from the Beta (β) Permits administered by the Office of Permits and from the Stride Permits that govern ambulation on surveyed tread. An Epsilon Permit authorises a single named holder to occupy, and to be found occupying, one nominated position in the Epsilon stack for a stated interval not exceeding the length of the interval itself. The permits are printed on stock of a green particular to the cluster and are numbered in a series that restarts whenever the issuing desk is moved.

The class is frequently confused with the Oblique Access Permits of the same district. The distinction is jurisdictional rather than physical: an Oblique Permit lets a body proceed at an angle to a stairwell's axis, whereas an Epsilon Permit lets a body remain where it is while that axis is recalibrated. Holders of both are advised to carry them separately, as the two documents are not stored well together.

Issuing authority and the tolerance schedule

Epsilon Permits are issued from Desk Epsilon under the operational tolerances published in the Annex Epsilon Document, which reconciles its figures quarterly with those of Vestibule Epsilon. The tolerances define how far a permit-holder may drift from the nominated position before the permit lapses. Under the current schedule the drift allowance stands at 11 centimetres in any horizontal direction and 4 centimetres on the vertical, the latter revised downward in the winter of the third recension after an incident on the Epsilon landing in which a porter, waiting for a permit to be stamped, was found to have risen slightly. No injury was recorded. The porter was re-nominated to the position from which he had begun and the counter was thereafter marked at ankle height.

Permits of this class do not confer access to Vault Epsilon, which requires a writ in addition, nor do they override the containment schedules set out in Annex Epsilon. An Epsilon Permit found inside the Containment envelope is to be surrendered unread and reissued on the outer landing.

The dispute over Clause 7

Whether an Epsilon Permit may be validated by an archivist of Annex Epsilon acting alone is the subject of a disagreement of some forty years' standing. The archivists rely on Annex Epsilon, Clause 7, which permits them to hold an inquiry in common with any body sharing their administrative space, and read the clause as extending to the countersignature of permits issued from a shared desk.

The Bureau of Permits and Drift Mitigation reads the same clause narrowly, holding that an inquiry is a proceeding and a countersignature is not, and that the archivists have therefore been validating permits they had no standing to touch since the practice was introduced. The Bureau's position is set out at length in its memorandum of the ninth revision, which observes that "a proceeding concluded in common is not a licence to lean across the counter" (Bureau of Permits and Drift Mitigation, Memorandum 9, §3). The archivists have not replied in writing. They have continued to lean across the counter.

Relation to the Epsilon survey

No permit of this class is required on the Epsilon Track, which was surveyed by Librarian expedition team Epsilon and is administered as open ground under the survey returns held at Epsilon Track Submissions. This exemption is stated clearly in the Annex and is nonetheless applied inconsistently. A submission of the fourth season records that a surveyor was turned back at the track's eastern marker for want of an Epsilon Permit, produced neither document, and returned the following day with a Vibration Permit, which was accepted. The marker was not moved. The incident is cited in the Bureau's memorandum as evidence of confusion; it is cited by the archivists as evidence that the Bureau's own staff cannot tell the classes apart.

Withdrawal and the surge protocol

All Epsilon Permits are suspended automatically during an Epsilon Surge, during which the nominated positions are held vacant and the counters are closed. Holders are not required to move; the permit simply ceases to describe them until the surge is declared over. The suspension is announced from the monitoring consoles of Stairwell Epsilon, which are accessible from Annex Epsilon Place, and is repeated by hand-bell at Vestibule Epsilon for the benefit of those in the certified portal frame who cannot hear the consoles.

Withdrawal for cause is rarer and more contentious. A permit is withdrawn where the holder has been found occupying a nominated position belonging to another, or where the position itself has been re-surveyed out of existence. The latter occurred on eight occasions following the resurvey of the upper Epsilon landings, and the affected holders were compensated in Stride Permits rather than in position, a settlement that the inquiry into Team Epsilon declined to comment upon.

Inventory of the issuing desk

The inventory of Desk Epsilon as returned at the last count, and as printed in the Annex without alteration:

  • Blank permit stock, green, two hundred and eleven leaves, of which nine are spoiled.
  • One date stamp, worn, advancing correctly.
  • One date stamp, retired, retained for sentiment.
  • One rule, marked at 11 centimetres.
  • One rule, marked at 4 centimetres, broken.
  • The counter, marked at ankle height.

The broken rule has not been replaced. Measurements on the vertical are taken by eye and disputed accordingly.

"A permit describes a place and a person and a time. Where any of the three is in doubt, the permit is in doubt, and the holder is advised to stand still until the doubt is resolved."

— Annex Epsilon Document, preamble to the tolerance schedule

See also

Referenced by

Readers also asked

Annex Epsilon Place: where is it?

Annex Epsilon Place is the primary physical administrative nexus overseeing the implementation and reconciliation of all Epsilon-series protocols, rulings, and architectural variances within the central administrative sp…

Annex Epsilon Place
Annex Epsilon (Containment): what does it set out?

Annex Epsilon (Containment) is the standing document and associated chamber-code governing the reporting, surveying, and temporary sequestration of Spontaneous Manifestations within the purview of Annex Epsilon. It is ad…

Annex Epsilon (Containment)
Bureau of Permits and Drift Mitigation: how is it conducted?

The Bureau of Permits and Drift Mitigation is a permitting body of the middle floors, constituted to reconcile two functions that the Concordances insist are inseparable and its own clerks insist are unrelated: the issua…

Bureau of Permits and Drift Mitigation
The Vanishing of Team Epsilon: what happened?

The Vanishing of Team Epsilon was the disappearance, on 14 Frostmonth 884 T.R., of the six-member survey unit designated Survey Team Epsilon during a routine documentary ascent of the Epsilon stair. The unit's instrument…

The Vanishing of Team Epsilon

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.