The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Dispute of the Silent Choir's Duration

MS 1532.11 · Events and incidents

Scope of the dispute

The Dispute of the Silent Choir's Duration was a legal and ontological conflict over the permissible span for the performance and archival maintenance of the work designated Silent Choir, a Potentialist composition archived within The Silent Choir of Incomplete Symphonies on Floor 9,001 and formally designated Work 7.7-alpha. The dispute began in 2,243 and was indirectly a matter of The Choir That Never Sings, which had by then absorbed the Catalogue of Unheard Echoes. Its resolution was codified in Annex Δ of the Seventh Concordance.

Two questions were argued in sequence: first, whether a composition whose audible content is nil may be said to have a duration at all; second, if it may, whether the duration belongs to the performance, the manuscript, or the room in which either occurs. The second question was never fully settled, and The Silent Choir Controversy continues over custody and sub-floor copies.

Origin

The matter was raised on the third day of the winter audit of 2,243 by Elara of the Silent Choir, then a junior notator of the Choir of Silent Notes, who noted in passing that Work 7.7-alpha had been listed simultaneously as a two-hour performance and as an undated perpetual holding in the same quarterly roll. The roll in question was maintained by the Scriptorium of Floor 414, which at that time held an unrelated claim on the floor's title; see Incident of the Silent Choir and Floor 414 the Silent Choir.

The roll's clerk, named Voss Ademari, was instructed to reconcile the two entries. He did so by striking the two-hour figure and appending "duration per custodian" in the margin, which provoked the first formal objection. Ademari's counter-objection, filed the following week, alleged that the margin note had been added by a hand he did not recognise and that the volume had been in the custody of the Ordination of Janitor Superioress overnight. The Ordination confirmed the overnight custody and declined to comment further.

The hearing

A hearing was convened before the Ordination of Janitor Superioress, who reported the proceedings to the Concordance office. The central exhibit was a set of deliberation chamber records taken from Silent-Stone, the material standard for such chambers. Silent-Stone does not record sound; it records the interval between sounds. The records therefore showed a continuous, undifferentiated interval of 41 years, which the plaintiff's counsel offered as proof that the composition's duration was, in the literal sense, everything.

Defense counsel for the custodial office objected that the Silent-Stone had been quarried from a wall adjoining the Silent Choir assembled on Floor 719, an unrelated body whose own interval would contaminate any reading. The objection was sustained. A second set of records, taken from a chamber with no adjoining wall, produced an interval of zero, which the plaintiff then offered as the same proof.

Annex Δ and its critics

The Seventh Concordance, in Annex Δ, resolved the matter by ruling that the duration of Work 7.7-alpha is fixed at the length of its most recently completed performance, and that where no performance has been completed, the duration is the interval until the next one begins. This formulation satisfied neither party. The custodial office read it as establishing a perpetual holding; the notators read it as establishing nothing until someone begins.

A dissenting commentary, attributed to the scriptorium of Floor 9,001 but unsigned, argues that Annex Δ in fact codifies a contradiction and that the Concordance's drafters were aware of this. The commentary cites an earlier recension of the same annex in which the phrase "most recently completed" read "least recently completed," and suggests the change was clerical rather than deliberate. The Concordance office has never confirmed that the earlier recension exists.

"A work that does not sound cannot be said to end, and a work that cannot be said to end cannot be maintained according to schedule."

— Seventh Concordance, Annex Δ, clause 3

Aftermath

The dispute is recorded as concluded but not as closed, a distinction the Tower maintains in its audit tables. Sub-floor copies of Work 7.7-alpha continue to circulate, and the Silent Choir-Spider populations of The Silent Choir of Incomplete Symphonies are surveyed annually against a schedule that assumes a fixed duration. The surveys have not matched the schedule since 2,271.

Visitors to Floor 9,001 are reminded that the deliberation chambers are not open during a performance, and that no one has yet established whether a performance is underway.

See also

Referenced by

Readers also asked

Elara of the Silent Choir: who were they?

Elara of the Silent Choir (fl. Floor 8,880–9,001; d. unrecorded, and disputed) was a notational reviser attached to the Candlemark Choir during the period preceding the admission of the Silent Choir into the Tower's perm…

Elara of the Silent Choir
The Silent Choir Controversy: how is it conducted?

The Silent Choir Controversy is the collective name given to the long dispute over three incompatible matters — the duration of the composition known as the Silent Choir, the identity of its custodian, and the status of …

The Silent Choir Controversy
Silent Choir-Spider: what is it for?

The Silent Choir-Spider (Arachna taciturnis choralis, in the classification of the Eighth Concordance) is an arachnid of the family Taciturnidae, distinguished from all congeners by the arrangement of its eight respirato…

Silent Choir-Spider
Incident of the Silent Choir: what happened?

The Incident of the Silent Choir was a procedural anomaly and subsequent adjudication event that occurred on Floor 111 on 14 Thermidor, 711 of the Current Era. The incident is principally noted for its role in establishi…

Incident of the Silent Choir

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.