The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Cycle 8421

MS 5845.43 · Events and incidents

Cycle 8421 was an administrative cycle of the Tower, recorded in the Cycle Register as neither aborted nor completed, but suspended — a status created for it and, by the reckoning of the Office of Cycle Accounting, never used again. It falls in the register between Cycle 4,217 and the Arsinoe Cycle, though the interval it occupies has been the subject of four separate recensions and one sealed dissent. No floor has been found whose numbering agrees with it.

Status and definition

The term suspended, as applied to Cycle 8421, does not mean interrupted. Fifth Concordance Annex 2 defines a suspended cycle as one that "remains open to amendment while accruing no further days," and it is this second clause that has caused all subsequent difficulty. Cycle 8421 accrued days for the whole of its tenure; the difficulty is that no one can say how many, because two of the three clocks kept for it were stopped and the third was a sundial on a floor with no aperture.

The Office of Cycle Accounting maintains that a suspended cycle may be cited in any proceeding where the date is not at issue. The Bureau of Dates, which is, has never accepted this.

The sundial of the Ninety-First Landing

The sundial stood on the Ninety-First Landing, in the charge of the Keeper of the Ninety-First Landing, an office abolished during Cycle 4,217 and restored, without its dial, under Cycle 441. The dial's gnomon was removed at some point before the suspension and re-fitted at some point after; the Bureau of Dates holds that the re-fitting was done on the wrong side, and the Office of Cycle Accounting holds that the gnomon's shadow was never admissible evidence in the first place, since Ninth Concordance Clause 12 excludes "shadows, echoes, and inheritances" from the class of records.

"A cycle is not the days it contains. It is the days the Register says it contains. Where the Register is silent, the cycle contains none, and may be filed with the aborted."

— Ninth Concordance, Annex 6, marginal gloss in the hand of Curator Vael

That gloss was struck from the second recension and restored in the fourth. Copies of the third recension omit the page entirely and substitute a diagram of a stairwell, which has been taken by some scholars as a ruling and by others as a binding error.

Dispute between offices

The principal disagreement concerns what Cycle 8421 suspended into. The Office of Cycle Accounting reads the register as showing a clean succession: Cycle 8421 ended, the Arsinoe Cycle began, and the word suspended is a clerical flourish with no operative force. The Bureau of Dates reads the same entry as showing that no succession occurred at all, and that the Arsinoe Cycle is not a cycle but a continuation — in which case, the Bureau argues, every cycle after it inherits the suspension, including Cycle 230 and the present Cycle 231.

The Commission for the Reconstruction of the Register has declined to rule on this, noting in its eighth report that a ruling either way would require it to fix the length of Cycle 8421, "which is the very matter referred to us." Cycle 992 and Cycle 5,801 have both been cited in the dispute, neither decisively.

The quarrel has a date, if not a length. In the winter of the year the Bureau calls Unnumbered and the Office calls Late 8421, a clerk of the Bureau named Clerk Ondrey was refused access to the dial-room on the ground that his seal was of the third class. Ondrey's memorandum on the refusal — nineteen pages, of which eleven are a list of seals of the third class and their holders — is now the lengthiest document in the file, and is cited more often than the cycle it concerns. The prohibition he records still stands: no one may enter the dial-room carrying a working clock.

Floors assigned

Three floors were catalogued under Cycle 8421, all of them during the suspension and none of them since. They are listed here as the register lists them, without correction.

  • Floor 6,120 — The Unasked Question. Closed to consultation.
  • Floor 6,121 — Lower Unasked Question. Contains no holdings; catalogued for symmetry.
  • Floor 2 — Reassignment of Floor 2. A holding consisting entirely of the correspondence concerning Floor 2, which is not otherwise known to exist.

The third of these has never been consulted, though its request slips are regularly filed and regularly granted. The Office of Floor Assignment regards this as a procedural success.

Legacy in citation

Cycle 8421 is cited most often not for its own content but as precedent. Decisions of the Concordance Bench that turn on an undetermined interval have, since the fourth recension, been reasoned by analogy to Cycle 8421 — a practice the Bench itself describes as "borrowed length." Cycle 14 and Cycle 1204 have both been described in judgments as "8421-like," a designation the Bureau of Dates protests and the Office of Cycle Accounting prints on its forms.

No anniversary of Cycle 8421 is observed, since its end cannot be fixed. Its opening is commemorated on the Ninety-First Landing by the ringing of a bell at an hour determined each year by the Keeper of the Ninety-First Landing and, since the office's restoration, disputed. Attendance is customary but not required. Those attending are asked not to bring clocks.

See also Cycle 4,721.88, Aperture Cycle, and Cycle 4,722.01–4,722.50.

See also

Referenced by

Readers also asked

Cycle 1204: how is it conducted?

Cycle 1204 is a Concordance numbering cycle of the fourth recension, held to have run concurrently with the later years of Cycle 231 and to have been closed administratively before the opening of Cycle 232. It is best kn…

Cycle 1204
Concordance Bench: who are they?

The Concordance Bench is the senior adjudicative body of the Court of Concordance, seated on Floor 6,112 behind the doors of the Hall of Sealed Hearing. It is not the largest bench in the Tower, nor the oldest, but it is…

Concordance Bench
Aperture Cycle: how is it conducted?

The Aperture Cycle is the formal bureaucratic procedure for the reclassification of a Standard Aperture, as codified in Addendum Kappa to the Third Concordance. Instituted following the Kappa-Aperture Discrepancy of Cycl…

Aperture Cycle
Cycle 4,722.01–4,722.50: what happened?

Cycle 4,722.01–4,722.50 is the formal designation for the fifty-part administrative interval immediately following the aborted Cycle 4,217 and preceding the recension of Cycle 5,442. The interval is not, strictly speakin…

Cycle 4,722.01–4,722.50

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.