The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Conceptual Perimeters

MS 2621.35 · Practices and doctrines

Conceptual Perimeters are demarcations drawn around a concept in order to fix where that concept ceases and something else begins. Unlike the physical demarcations registered by the Surveyor's Office, which enclose ground, air, or the awkward residue between stairwells, a Conceptual Perimeter encloses meaning. The distinction is administrative rather than metaphysical, and the Conceptual Zoning Bureau has ruled twice (in Filing 411-C and again in Filing 411-C, Amended) that the two classes of perimeter may share a line but never a warrant.

Conceptual Perimeters are governed in the first instance by the Concordant Law, which establishes, maintains, and verifies them, and in the second instance by whatever the Third Concordance happens to say about them on the day of filing. Where the two disagree, the perimeter stands and the disagreement is itself enclosed, a procedure described under Conceptual Securement.

Procedure and Instrumentation

A Conceptual Perimeter is traced with Non-Invasive Calipers, which record dimension without contact — a requirement inherited from the Third Concordance's ruling on indeterminate perimeters, where contact was found to alter the concept being measured. The calipers are held at a fixed distance of one hand's breadth from the concept's surface. No one has established what the surface is made of, and the question has been tabled at every convocation of the Quiet Council since 1412.

Once traced, the perimeter is inked in Void-Gall if it is to be held against seepage, or left uninked if it is merely advisory. The uninked perimeter is the source of most disputes in the field, since an advisory line is invisible to everyone except the surveyor who drew it and, occasionally, to the concept itself. Conceptual Seepage through an uninked line is not an offence; it is a weather event.

Soils beneath a Conceptual Perimeter must be classified before the line is closed. The Conceptual Soils schedule lists eleven grades, of which Grade 7 (loamy, retentive of definitions) is the only one suitable for permanent enclosure. Grade 7 is quarried almost entirely from Floor 88.

The Floor 88 Incident

In the winter of the year the Tower records as 6,204 by the Surveyor's Office's standing register, a team of four surveyors attempted to draw a Conceptual Perimeter around the concept of almost. The trace was completed on the fourth day and inked in Void-Gall the same evening. By morning the perimeter had contracted to enclose only the concept of nearly, and by the following week it enclosed nothing at all but a small region of Conceptual Blanching that has never been reclaimed.

"A perimeter drawn about a hedge-word will move to the nearest stable word and settle there. The surveyor is advised to draw about the stable word first and let the hedge-word come to it."

— Procedures of the Quiet, §19.4

The incident is cited in the preamble to Concordance 227, Annex C: On Unreal Perimeters, which extended the jurisdiction of the Guild of Groundskeepers to any perimeter whose contents cannot be confirmed by two independent clerks. The Guild has never exercised this jurisdiction and states in its annual return that it is "not presently equipped."

Quiet and Unreal Perimeters

Where a Conceptual Perimeter encloses silence and intention together, it must be filed jointly under the Quiet Codicil, which administers the warrant for all Quiet Perimeters. Joint filing requires two seals and one witness. The witness may not be the surveyor, the concept, or anyone who has previously been enclosed. This last prohibition was added after a clerk on Floor 203 signed as witness to his own perimeter and was thereafter unable to leave it; he is reported to be in good spirits.

Perimeters enclosing unreal concepts fall under the primary jurisdiction of the Archivists of the Unreal, as set out in Annex C, though the Furnace of Quiet Oblivion retains the standing charter for any perimeter that must be closed by burning rather than by survey. The two offices have not spoken since the Furnace declined to return a set of calipers it borrowed in 5,988.

Scholarly Disagreement

The principal dispute in the literature concerns whether a Conceptual Perimeter encloses a concept or merely marks where the concept has already stopped. The Bureau of Conceptual Reconciliation (BCR) holds the former position, citing the Theorem of Conceptual Plenitude and the observation that a concept enclosed within a perimeter gains, on average, 0.7 Standard Conceptual Units of definitional density. The Department of Coherent Placement holds the latter, arguing under the Doctrine of Coherent Adjacency that the line does no work and the concept was always going to stop where it stopped.

A third position, advanced by the Contradiction Librarian assigned to the dispute and filed without prejudice, is that the question cannot be settled because settling it would require a perimeter around the dispute, and that perimeter would be subject to the same question. The Librarian's ruling encloses itself, as required under the Thirteenth Concordance, and is filed in a drawer that opens only from the inside.

Relationship to Conceptual Integrity

A Conceptual Perimeter is not a guarantee of Conceptual Integrity and is routinely mistaken for one. Integrity is a property of the concept; the perimeter is a property of the office that drew it. Conceptual Overload has been recorded inside perimeters rated sound, and Conceptual Motility has carried entire enclosed concepts some distance from their lines without any breach being logged. The Conceptual Zoning Bureau recommends that perimeters be inspected every eleven years, or sooner if the concept has been seen leaning.

Inspection is performed by a single clerk with a lamp and a copy of the Concordant Law. The lamp is not provided.

See also

Referenced by

Readers also asked

Conceptual Seepage: how is it conducted?

Conceptual Seepage is the unauthorized migration of conceptual properties across designated archival boundaries, recognized as a primary vector for Anachronistic Seepage and Conceptual Contamination. Governed by fluctuat…

Conceptual Seepage
Bureau of Conceptual Reconciliation (BCR): who are they?

The Bureau of Conceptual Reconciliation (BCR) is the Tower office of record for the documentation, certification, and management of conceptual motility, and the principal authority over Conceptual Contamination and its r…

Bureau of Conceptual Reconciliation (BCR)
Quiet Council: who are they?

The Quiet Council was a provisional judicial body chartered on the 47th of Dust, 828, with a mandate to adjudicate disputes concerning the manufacture, calibration, and deployment of the Librarians' Quiet. It was dissolv…

Quiet Council
Department of Coherent Placement: who are they?

The Department of Coherent Placement is the administrative body mandated by the Seventy-Fourth Concordance to oversee the orderly and contextually appropriate assignment of provisional numbers to all Tower holdings pendi…

Department of Coherent Placement

Passages cited from this record

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.