Ventilation Shafts Primary Network
MS 5952.70 · Objects and instruments
The Ventilation Shafts Primary Network is the designation given to the original and senior tier of the Ventilation System, comprising the twelve shaft columns sunk during the Tower's first structural programme and the uncounted lateral passages that connect them. It is distinguished in all Librarian records from the later Ventilation Shafts Amp Conduits, which were cut under a separate warrant and belong administratively to the Arterial Network. The Primary Network moves the majority of the Tower's air by volume, though no survey since the Lower Risers Survey of 2.114 has produced an agreed figure for what that majority is.
Composition
The Network consists of twelve columns, each identified by a letter and a shaft-number, and each descending an indeterminate distance. Two of the twelve — Column C and Column F — are recorded as "continuous" in the founding register; the remaining ten terminate in floor-plates whose bearing load has never been assessed. The columns intersect at junctions of three or four ways, and it is at these junctions that the Network's characteristic behaviour is observed: air entering a junction by one column will leave by another, but not reliably the one the draught suggests.
The lateral passages between columns are numerous and only partially listed. Indirect Ventilation Conduits are the most frequently cited of these, being the passages that decline to state their destinations. The Ventilation Consortium maintains that there are between six hundred and eleven hundred such laterals; the Office of Shaft Nomenclature has recorded two thousand and forty-one, including eleven that it later conceded were alcoves.
Relationship to the wider system
The Primary Network discharges into the Eastern Ventilation Shafts at the junction traditionally called the Throat, a four-way meeting first described in Concordance 44 and disputed in every commentary since. From the Throat the eastern branch runs through the Ventilation Spirals and into Ventilation Shaft 7 Gamma, which is the only column of the Network whose name predates the Network itself.
The Network also supplies the tertiary circulatory arrangements at Ventilation Amp Environmental Shafts, whose Kelv Annex intrudes three bays into the primary structure at the level of Column H. The Annex's walls are required to be load-bearing in one direction only, a concession granted after the intrusion of 8.309 and never revoked.
The Throat question
Scholarly disagreement over the Primary Network largely concerns the Throat. Concordance 44, Annex 2, states plainly that the Throat is "a junction of the Primary Network, east-bounding, and shall be maintained as such in perpetuity." Concordance 71, written some decades later and amended twice since, describes the same junction as "the westernmost terminus of the Eastern Ventilation Shafts, to which the primary columns are tributary." The two cannot both be true, and the Concordance Arbitration Panel has declined to resolve the matter on four occasions, most recently in 11.402, on the ground that a ruling would require the Panel to determine which of the two Concordances is senior, and that question is itself governed by Concordance 71.
"The Throat is neither primary nor eastern. It is a doorway, and doorways do not belong to the rooms on either side of them."
— Librarian Ora Vant, marginal note to Concordance 44, Third Recension
Vant's note is much quoted and has never been entered in the register. It is printed in the margin of the Fourth Recension with the annotation "not adopted."
Maintenance and the Risers' Fee
Cleaning of the primary columns is contracted in twelve parts, one per column, and no contractor may hold more than one part at a time. The rule dates from the Winter of 7.188, when a single contractor held nine parts, fell behind on all of them, and the resulting dust-load in Column C was traced by Aural Conduit Theta-14 as far as the Western Aperture, where it was mistaken for smoke and the shaft sealed for eleven days. The seal was lifted after a formal inquiry found that the shaft in question had not been Column C at all.
The Ventilation Consortium levies an annual recognition fee of one mark per riser on the eastern branch, and has since 9.061 asserted an equivalent levy on the twelve primary columns. The Office of Shaft Nomenclature has refused the levy on the ground that columns are not risers, a distinction the Consortium disputes and neither party has ever defined. Payment of the levy is made in person at the Consortium's lower counting-room, which is open on the second and fourth days of the month and requires visitors to bring their own chair.
Incidents
In 10.277 a resonance was recorded at the junction of Columns K and L that persisted for six weeks and produced in listeners a persistent impression of their own name being called from below. A Resonance Comparator Array was installed at the junction under the authority of Concordance 90, and the resonance ceased upon installation. The Array has remained in place and is inspected quarterly; the inspectors' notes for the first three years consist entirely of the word "clear." The episode is discussed in the literature on Echobeings, though the Echobeings register does not acknowledge it.
A second incident, in 11.033, involved the discovery that Column F — recorded as continuous since the founding register — is not continuous, but opens onto a stairwell that descends nine floors and returns to Column F at a point four floors above the discovery. Ventilation Phases cites this as evidence that the Network's vertical extent is "at least locally circular." The Office of Shaft Nomenclature has not amended the founding register.
See also
-
MS 8606.93
Seventh Concordance Annex D Ventilation Amp Circulation
Seventh Concordance, Annex D: Ventilation & Circulation is the primary regulatory document governing the movement, measurement, an…
-
MS 0235.36
Great Ventilation Shaft
Great Ventilation Shaft is the collective designation for the four primary atmospheric trunks serving the Tower's middle floors, t…
-
MS 1418.80
Seventh Iron Strongroom
The Seventh Iron Strongroom is the most significant of the twelve archival chambers comprising the Vault of Original Instruments o…
-
MS 8692.77
East Aperture
East Aperture is a primary structural and administrative opening located within the East Unbound Stacks. Designated Aperture Gamma…
-
MS 4166.13
Taxonomic Anchor programme
The Taxonomic Anchor programme is the collective designation for the Tower's long-running practice of fixing unstable classificati…
-
MS 4899.39
Ventilation Shaft Theta
Ventilation Shaft Theta is a contested ventilation shaft located on Floor 112, jointly servicing the Department of Speculative Bio…
Referenced by
- MS 4400.51 High Cardiarch
Readers also asked
Ventilation Amp Environmental Shafts: what is it for?
Ventilation Amp Environmental Shafts constitute the tertiary circulatory and atmospheric modulation network within the Tower's primary structural supports, distinct from the primary spiral arrays and the classified whisp…
Ventilation Amp Environmental ShaftsWestern Aperture: where is it?
The Western Aperture is one of four primary vertical access and illumination shafts penetrating the known sectors of The Tower. Designated officially as Aperture 1 in the Western Concordance, it functions simultaneously …
Western ApertureVentilation System: what is it for?
The Ventilation System is the comprehensive network of mechanical and pneumatic apparatuses, along with their associated administrative protocols, responsible for the air circulation, humidity control, and atmospheric cl…
Ventilation SystemVentilation Shaft 7 Gamma: what is it for?
Ventilation Shaft 7 Gamma is the designated primary atmospheric exchange point for Spiral 77-Gamma, as confirmed by Investigation #77-G-412. Its official designation dates from the ratification of the Seventh Concordance…
Ventilation Shaft 7 GammaPassages cited from this record
-
The Throat is neither primary nor eastern. It is a doorway, and doorways do not belong to the rooms on either side of them.
Librarian Ora Vant, marginal note to Concordance 44, Third Recension
Readers who consulted this also failed to find
- MS 1805.30 Concordance 90
- MS 6149.23 Office of Shaft Nomenclature
- MS 9658.18 Kelv Annex
- MS 3721.97 Concordance Arbitration Panel
Because you consulted