The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

The Directorate of Structural Coherence

MS 0972.51 · Guilds, orders and offices

The Directorate of Structural Coherence is a reviewing body of the Tower, constituted in the 4th Ascension (floors 880–1,014) to determine whether any given structure is the structure it is declared to be. It does not build, repair, or inspect structures; it rules on the correspondence between a structure and its record. Its seal, a plumb line crossed by a ledger rule, appears on some eleven thousand instruments of attestation, the oldest of which is dated to Floor 902 and the newest to a floor not yet assigned a number. The Directorate is often confused with the Directorate of Hardness and Fracture, which assesses what structures do when struck or loaded, rather than whether they may be said to exist as described. The two bodies have maintained a formal working arrangement since the Seventeenth Ascension Concordance, though the arrangement has been read differently by each side for most of its life.

Origin and the question of the Rahm Stair

The Directorate was called into being by an emergency instrument of the Directorate of Archival Coherence following the anomaly of the Rahm Stair, a spiral of ninety-one treads recorded independently by four survey parties and found on subsequent inspection to ascend only sixty. The parties were not found to have erred; each had counted correctly. The stair was simply not the same stair across its length, and no existing body held authority to rule on what it therefore was.

Ossa Rahm, who gave the stair its later name and who served as the Directorate's first presiding officer, framed the founding question in the memorandum now filed as Annex III: "A structure is coherent when its description survives its own ascent; where it does not, the structure is to be entered under the description it satisfies, and the discrepancy noted below the line" (Annex III to the Founding Instrument, cl. 2). The clause has governed the Directorate for three hundred years and has never been amended, though it has been annotated eleven times.

The Rahm Stair remains in the Directorate's custody as a reference structure. It may be climbed on application. No application has been granted since the 6th Ascension.

Method of attestation

Attestation proceeds by the comparison of three documents: the declarant's description, the Register of Standing Structures, and a witnessed ascent by a clerk of the Directorate of Field Verification. Where the three agree, a plumb-and-rule seal is affixed and the structure is entered as coherent for a term of forty years. Where they disagree, the structure is entered as coherent-with-reservation, which is the largest single class in the Directorate's books and the source of most of its correspondence.

The Directorate maintains two general classes of reservation. Reservations of the first class concern discrepancies of measurement, and are settled by remeasurement. Reservations of the second class concern discrepancies of identity — a landing that is the same landing described two ways — and are settled only by the presiding officer, sitting alone, without clerk or record. The closed nature of these sittings has been challenged twice; both challenges were withdrawn before hearing.

Jurisdictional dispute with the Directorate of Sequence

The Directorate holds that a structure entering into coherence must do so in sequence, and has asserted a claim to sit in review of the Directorate of Sequence where a structure's recording order affects its attestation. The Directorate of Sequence has answered that ordering is its own province and that the Structural Directorate may review the order of its own comparisons but not the order of the Tower. Neither claim has been withdrawn.

The dispute has produced one notable casualty. A clerk of the Structural Directorate, Clerk Anwer Voss, having spent the winter of the 5th Ascension preparing a comparison of the same landing at Floor 1,204 in two recording orders, submitted a return in which both orders attested. The return was ruled void on the technical ground that Voss had failed to declare his second order in the register before beginning it. Voss's appeal, filed the following spring, argued that to declare the second order first would have made the comparison impossible. The appeal is calendared for hearing. Voss has since been reassigned to the Nominalist Archives Directorate.

Reading of the Seventeenth Concordance

There is genuine scholarly disagreement as to what the Seventeenth Ascension Concordance actually settled. The Structural Directorate reads Annex 7, cl. 4 as granting it precedence in all matters touching the description of a standing structure: "the description being prior to the hardness of the thing described" (Seventeenth Ascension Concordance, Annex 7, cl. 4). The Directorate of Hardness and Fracture reads the same clause as procedural only, and cites the marginal gloss of Librarian Tessil Marrow: "priority of drafting, not priority of knowing" (Marrow, Observations on Annex 7, 6th Ascension, fol. 41v).

The Directorate of Cartographic Review has declined to endorse either reading, on the ground that its own instruments do not distinguish the structure from its plan and that the whole question is therefore not before it. The Directorate of Notional Alignment has endorsed both readings, in separate returns, filed the same day.

Practical notes

The Directorate's premises occupy three floors of uncertain number, entered through a single door on the stairhead. Visitors are asked to leave the door as they found it. The current number of attesting clerks is not stated in any published return; the Directory of Cohorts records forty-one names for the Directorate, thirty-nine of which are marked as superseded and two of which are not marked at all.

Instruments of attestation are issued in triplicate, one copy to the declarant, one to the Register of Standing Structures, and one retained in the closed series. Requests to view the closed series are received at the door, acknowledged in writing, and left there.

See also

Referenced by

Readers also asked

Directorate of Notional Alignment: who are they?

The Directorate of Notional Alignment (DNA) is a sub-directorate under the Directorate of Archival Coherence, established by the 117th Amendment to the Seventh Concordance. It is responsible for the procedural oversight …

Directorate of Notional Alignment
Directorate of Archival Coherence: who are they?

The Directorate of Archival Coherence is the primary regulatory and adjudicatory body responsible for maintaining the integrity of archival description within The Tower as defined by the Axiom of Material Coherence. Esta…

Directorate of Archival Coherence
Nominalist Archives Directorate: who are they?

The Nominalist Archives Directorate (NAD), formally recognized under the Provisions for Nominal Curation (Annex Γ-7 of the Ninth Concordance), is the sub-directorate of the Directorate of Archival Coherence responsible f…

Nominalist Archives Directorate
Directorate of Field Verification: who are they?

The Directorate of Field Verification is a regulatory body operating under the Directorate of Archival Coherence. It is tasked with conducting in-situ inspections of catalogued phenomena, confirming their compliance with…

Directorate of Field Verification

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.