The Tower
Cited by 12 Concordances Compliant with Ordinance 4 Surveyed — partially ISO 8,812 — pending since 11,904

Sigma-5

MS 8476.53 · Practices and doctrines

Scope and standing

Sigma-5 is the fifth of the Descent Protocols Sigma-1 through Sigma-9 and governs the calibration of descent bearings at quarry faces below Aperture Sigma-7 stairwell. It entered force on the fourteenth of Ninthmonth, in the year recorded as 3,118 by the Annals of the Deep Gallery, and has been amended twice — most recently by the Eleventh Concordance, Annex 6, which extended its jurisdiction to provisional faces not yet entered on Sigma-Class Logging.

Sigma-5 occupies an awkward position in the sequence of the Descent Protocols. It does not authorise quarrying (that is Sigma-4), it does not govern the provisional holding of Sigma-Glass Precursor (that falls to Sigma-6), and it does not confer any authority over Line Sigma, which remains the sole jurisdiction of Jurist Sigma-1. What it does instead is specify, in considerable detail, how a bearing taken at the face is to be corrected for the lateral drift of the shaft before it is passed down.

Calibration procedure

The procedure is set out in clauses 5.1 through 5.9. In summary: the quarrymaster sights the face, takes a bearing on the fixed mark set into the gallery wall, and then applies a correction drawn from the Sigma Array tables. The corrected bearing is written on a slip, sealed, and sent down with the shift. The next shift reads the slip, takes its own bearing, and applies the same correction. If the two agree within the stated tolerance of one part in four thousand, the face is declared true.

The difficulty, as generations of quarrymasters have observed, is that the Sigma Array tables were compiled for a shaft of one depth and have never been recomputed for a shaft that has since deepened. The corrections are therefore applied to faces they were not calculated for, and the resulting agreements are treated as confirmation that the method works. The Sigma Regulator, in ruling 5-C of Material Filing Sigma-9, described this as "an acceptable circularity, provided the drift does not change direction between shifts."

Relation to neighbouring protocols

The boundary between Sigma-5 and Sigma-4 has been disputed at least three times. In 3,141 a quarrymaster at Dock Sigma attempted to use a Sigma-5 calibration to justify working a face that had not been entered under Sigma-4; the Reroute Authorization for Line Sigma was cited in support, then cited again against the same argument, and the matter was eventually settled by an order of the Librarians that neither party considers satisfactory.

Sigma-6 and Sigma-5 interact at the point where a calibrated face becomes a working face. Under the reading favoured by the office of the Sigma-Secundus, calibration is a precondition of provisional holding; under the competing reading, provisional holding may proceed on an uncalibrated face for up to six shifts. The second reading is the one actually used, and the first is the one actually written down.

Amendments and recensions

The original text of Sigma-5 was recopied in 3,152 by the scriptorium at Stairwell Sigma-44, producing the "Second Recension" now held on that floor. The First Recension survives only as marginalia on a copy of Sigma-4 and is generally considered inferior, though two of its clause-numbers are still cited in practice, to the confusion of anyone reading the current text.

The Eleventh Concordance amendment of 3,187 added clause 5.10, concerning faces that are provisional only in the administrative sense — that is, faces for which the paperwork has not caught up with the rock. Clause 5.10 states that such faces "shall be calibrated as though true, and shall be deemed true upon calibration." This has been read as either a sensible convenience or a remarkable piece of self-sealing logic, depending on which office is doing the reading.

Notes on practice

Visitors to the galleries under Aperture Sigma-7 stairwell should be aware that calibration slips are not to be removed from the face; a slip once taken to Annex Sigma for copying was never returned, and the shaft it documented has since been declared untrued. The slips are made of a paper stock that does not survive damp, and the galleries below the fortieth landing are damp in winter.

The full text of Sigma-5, with both recensions collated, runs to eleven pages and is held on the shelf marked 5/A in the gallery of Sigma-Glass Panes. It is consulted more often than it is read.

See also

Referenced by

Readers also asked

Material Filing Sigma-9: how is it conducted?

Material Filing Sigma-9 is the standing classification by which the Sigma Regulator records every quantity of Sigma-Glass and Sigma-Glass Precursor that moves between the ateliers of Annex Sigma and the dock heads of Doc…

Material Filing Sigma-9
Descent Protocols Sigma-1 through Sigma-9: what does it set out?

Descent Protocols Sigma-1 through Sigma-9 constitute the foundational ninth-tier security and procedural annex to the primary Descent Protocols. They are designated for the administration and custodial oversight of all S…

Descent Protocols Sigma-1 through Sigma-9
Jurist Sigma-1: how is it conducted?

Jurist Sigma-1 is the codified legal consciousness synthesized from the procedural rulings of Magistrate Valen and the principle-based jurisprudence of V. Selvage. It is an administrative construct, not a living jurist, …

Jurist Sigma-1
Sigma-Glass Precursor: what is it for?

The Sigma-Glass Precursor is the official designation, per Addendum Ξ-7, for the raw mineralogical amalgam excavated from the deep radial fractures of Stairwell Sigma-44 prior to its refinement into functional Sigma-Glas…

Sigma-Glass Precursor

Readers who consulted this also failed to find

Assistance

A Librarian is with you.

MS 9679.39
MS 8532.92
MS 1913.80

The Librarian considers the matter closed.

Typical response time: one Concordance. If your enquiry concerns a holding, consult the finding aid.