Provisional Protocol Summaries (Series 44, Rev. 19)
MS 0401.69 · Documents and ordinances
Provisional Protocol Summaries (Series 44, Rev. 19) is the nineteenth recension of the forty-fourth series of provisional instruments, and the recension presently in force. It sets out the containment and access protocols governing all EC samples, together with the provisioning schedules by which the Containment Cell Blueprints (Series 127-A through 127-F) are supplied, staffed, and sealed. The volume is held in the working collection of Floor 412 pending ratification, and is consulted chiefly by reference to its own annexes, which are longer than the protocols they annex.
Composition and recension history
Series 44 was opened in the winter of the year the Librarians record as 44-R, and has been revised nineteen times. Revisions 1 through 7 survive only as marginal corrections in the hand of a copyist known in the catalogue as Scribe Vell. Revisions 8 through 14 were occasioned by the disputes surrounding Protocol Delta, and Revision 15 is missing: the seal is intact, the pagination is continuous, and the volume opens at folio 1 of Revision 16 without comment. The condition is noted, not explained, in the accession register of Floor 909.
Revision 19 was issued under the authority of the Eleventh Concordance, Annex 3, which permits a recension to be reissued entire where earlier amendments cannot be read in sequence. The reissue suppressed no protocols; it reordered them alphabetically, which had the effect of moving the containment schedules ahead of the definitions that govern them. Clerks working from the volume are advised to read backward.
Containment and access
The protocols establish that an EC sample is held, that it is entered against a numbered cell, and that both the holding and the entry are recorded in the Provisional Protocol Summaries before any access is granted. Nothing in the volume states what an EC sample is. The drafting office has twice declined to supply a definition, on the objection that a definition would itself require containment.
Access is granted by two signatures of unequal weight and one witness of no weight at all. The witness must be present, must be awake, and must not be consulted. Section 44/19-6 sets the ambient sound pressure in an access corridor at or below 40 decibels, a provision carried forward from the corrections recorded in the Provisional Protocol Summaries from Floor 404, where anomalous cataloguing events were first traced to sound pressure in the stairwells adjacent to Floor 888. Beyond that limit the corridor is closed, not silenced.
"Where the corridor exceeds forty decibels, the sample is not to be approached in order to establish why."
— Series 44, Rev. 19, Section 44/19-6(b)
The provisioning schedules
The schedules bind the issuance of the Containment Cell Blueprints to a quarterly reckoning kept by the Office of Provisioning Schedules, which is answerable to no one and is therefore much cited. Each of Series 127-A through 127-F is drawn to scale, countersigned, and provisioned with a fixed quantity of shelving, sealant, and lighting; the schedules do not provide for visitors, and a number of cells accordingly have no door, only an aperture of approved dimensions. This is described in the schedules as the standard configuration.
The schedules were suspended for eleven days in the winter of 44-R/19 after a provisioner issued three cells' worth of shelving to a cell that had not yet been built. The error was traced to a copying slip in which the numeral 3 preceded its own footnote. Protocol 9033-β was invoked, the shelving was re-entered against a cell on Floor 4, and the suspension was lifted. The cabinetry remains on Floor 4 and is catalogued there as a permanent fixture.
Doctrine and dispute
There is a live disagreement between the Office of Provisional Records and the Office of Provisioning Schedules as to whether Revision 19 supersedes or merely restates the containment protocols of Revision 18. The first office holds that a reissue entire extinguishes what it reorders, citing the Eleventh Concordance, Annex 3. The second holds that a schedule suspended is a schedule enforced, and cites the Seventeenth Concordance to the contrary, which it does whenever the question is raised.
A third position, advanced in an unsigned note pasted into the working copy on Floor 412, observes that Section 44/19-6(b) requires the sample to be left unapproached, and that the question of the corridor's noise can only be settled by approaching it. The note has not been answered. It has been sealed, initialled, and left where it was found, which is the usual fate of arguments the Tower cannot close.
Status
Revision 19 remains unratified. Its protocols are binding by the operation of Provisional Protocol Summary, which distinguishes a protocol in force from a protocol ratified and finds the difference without practical consequence. The Provisional Protocol for Ambient Stasis was drafted in direct response to incidents the Summaries of Floor 404 first catalogued, and copies of Revision 19 are shelved beside it, in the order of their receipt.
See also
-
MS 5829.45
The Provisional Protocol Summaries from Floor 404
The Provisional Protocol Summaries from Floor 404 are a collection of notarized documents produced by the Secretariat for Unwritte…
-
MS 4663.10
Proposed Nineteenth Concordance
“…the proposed Nineteenth Concordance, fundamentally an instrument of provisional classification, was both a radical oversimplific…
-
MS 4341.74
Provisorial Protocol Summaries From Floor 404
Provisorial Protocol Summaries From Floor 404 is a distended class of documents held in the unitaries of a dozen floors, distingui…
-
MS 5623.02
Clerk-Provisional Aris Thorn
Clerk-Provisional Aris Thorn is the designation presently attached to the custodianship of the Collection of Unallocated Doors, a …
-
MS 7571.40
Proposed Containment Protocols
Proposed Containment Protocols are preliminary or draft measures submitted for formal review and ratification before they can be e…
-
MS 7648.82
Containment Protocols
Containment Protocols is the collective designation for the several hundred numbered and unnumbered instruments by which the Tower…
Referenced by
- MS 4187.05 Containment Cell Blueprints (Series 127-A through 127-F)
- MS 4869.17 Provisioning Oversight
- MS 8615.81 The Provisional Ledger (Series 44.312.07)
- MS 2339.26 Ordinate of Provisional Containment 12-G
- MS 0122.09 Annex Ω of the Provisional Protocol
- MS 0154.56 Series
Readers also asked
Librarians: who are they?
The Librarians are the recognized custodial order of The Tower, vested by the Concordances with the exclusive authority and responsibility for the reception, indexing, and preservation of all holdings admitted to the arc…
LibrariansProvisional Protocol Summaries from Floor 404: what does it set out?
Provisional Protocol Summaries from Floor 404 are the standardized portfolio documents that encapsulate a given Provisional Protocol from its point of origin on Floor 404 through its designated procedural lifecycle. They…
Provisional Protocol Summaries from Floor 404Eleventh Concordance: what does it set out?
The Eleventh Concordance is a foundational administrative document ratified in Year 45 of the Third Librarianate, primarily concerned with establishing procedural guidelines for the cataloguing of non-entities and govern…
Eleventh ConcordanceProvisional Protocol Summary (Form N-Δ): what does it set out?
The Provisional Protocol Summary (Form N-Δ), commonly called the Negation Docket, is the physical document that instantiates a Provisional Protocol. It is filed during the Documentation of Negation phase of a Descent Pro…
Provisional Protocol Summary (Form N-Δ)Passages cited from this record
-
Where the corridor exceeds forty decibels, the sample is not to be approached in order to establish why.
Series 44, Rev. 19, Section 44/19-6(b)
Readers who consulted this also failed to find
- MS 4469.61 Office of Provisional Records
- MS 7799.42 Office of Provisioning Schedules
- MS 2580.01 Scribe Vell
- MS 0720.78 Containment Cell Blueprints
Because you consulted